• Connect with us
  • Information
    • About Us
    • Contact Us
    • Careers
    • Partnerships
    • Advertise With Us
    • Authors
    • Browse Topics
    • Events
    • Disclaimer
    • Privacy Policy
  • NORTH AMERICA EDITION
    Australia
    North America
    World
Login
Investing News NetworkYour trusted source for investing success
  • NORTH AMERICA EDITION
    North America
    Australia
    World
  • My INN
Videos
Companies
Press Releases
Private Placements
SUBSCRIBE
  • Reports & Guides
    • Market Outlook Reports
    • Investing Guides
  • Button
Resource
  • Precious Metals
  • Battery Metals
  • Base Metals
  • Energy
  • Critical Minerals
Tech
Life Science
Base Metals Market
Base Metals News
Base Metals Stocks
  • Base Metals Market
  • Base Metals News
  • Base Metals Stocks

VMS Ventures Reports Progress Update on Reed Copper Project

Investing News Network
Aug. 21, 2013 11:55AM PST
Base Metals Investing

VMS Ventures Inc. (TSXV:VMS) reported an update on the progress made in July at the Reed Copper Project, near Flin Flon Manitoba. Highlights include the advancement of underground development by a further 182 metres, for a current total of 1,001 metres and the completion of construction of the surface ore pad and excavation of the 60 metre level refuge station. The Company owns 30% of the project and Hudbay Minerals Inc. (TSX:HBM,NYSE:HBM) is the Operator and owns 70%. The project remains on track to be completed by the end of March, 2014.

  VMS Ventures Inc. (TSXV:VMS) reported an update on the progress made in July at the Reed Copper Project, near Flin Flon Manitoba. Highlights include the advancement of underground development by a further 182 metres, for a current total of 1,001 metres and the completion of construction of the surface ore pad and excavation of the 60 metre level refuge station. The Company owns 30% of the project and Hudbay Minerals Inc. (TSX:HBM,NYSE:HBM) is the Operator and owns 70%. The project remains on track to be completed by the end of March, 2014.

As quoted in the press release:

Highlights for the month include:

  • Underground development at the project was advanced a further 182 metres in July for a current total of 1,001 metres.
  • Construction of the surface ore pad and excavation of the 60 metre level refuge station was completed as well as the foundation forms for the 600 horse power main ventilation fan.

VMS Ventures Inc. COO, Neil Richardson, said:

The project remains within budgetary parameters and the scheduled completion date of Q1 2014. Safety during construction of the mine remains a priority with over 500 consecutive days of no time lost accidents. The focus at the Reed copper project continues to be the advancement of the underground ramp and development of escape and ventilation raises as we advance towards production.

Click here to read the VMS Ventures Inc. (TSXV:VMS) press release

See this press release on Marketwire
Click here to see the VMS Ventures Inc. (TSXV:VMS) profile

tsx-hbm hudbay-minerals-inc tsxv-vms nyse-hbm
The Conversation (0)

Go Deeper

AI Powered

September 2012 News Catalysts

Foran Files Technical Report for McIlvenna Bay Resource

Latest News

Outlook Reports

Resource
  • Precious Metals
    • Gold
    • Silver
  • Battery Metals
    • Lithium
    • Cobalt
    • Graphite
    • Electric Vehicles
  • Agriculture
  • Base Metals
    • Copper
    • Nickel
    • Zinc
  • Critical Metals
    • Rare Earths
  • Energy
    • Uranium
    • Oil and Gas
Tech
    • Artificial Intelligence
    • Cybersecurity
    • Robotics
    • Crypto
    • Cleantech
Life Science
    • Biotech
    • Cannabis
    • Pharmaceuticals

Featured Stocks

More featured stocks

Browse Companies

Resource
  • Precious Metals
  • Battery Metals
  • Energy
  • Base Metals
  • Critical Metals
Tech
Life Science
MARKETS
COMMODITIES
CURRENCIES