Supreme Resources Ltd. Intersections of significant grades of copper & silver mineralization

Company News

Supreme Resources Ltd. (CVE:SPR) announced today results from a shallow, 200 metre, four-hole drilling program that was conducted on the TAS Project at the Cliff and Road showings in the fall of 2010. The drill results have confirmed the presence of a copper-silver mineralization within the Copper Mountain Main Trend.

Supreme Resources Ltd. (TSXV:SPR) announced results from a shallow, 200 metre, four-hole drilling program that was conducted on the TAS Project at the Cliff and Road showings in the fall of 2010. The drill results have confirmed the presence of a copper-silver mineralization within the Copper Mountain Main Trend.

The press release is quoted as saying:

Measured and indicated, and inferred resources at the Copper Mountain Mine reported by Copper Mountain Mining Corporation are as follows:

  • Measured and Indicated resources, based on a 0.15% Cu cut-off grade, are 518.6 million tons grading 0.31% Cu containing 3.2 billion pounds of copper.
  • Inferred resources at 0.15% Cu cut-off grade are 390.7 million tons grading 0.23% Cu containing 1.8 billion pounds of copper.

Click here to access the entire press release.

Click here to access Supreme Resources company profile.

The Conversation (0)
×