- AustraliaNorth AmericaWorld
Investing News NetworkYour trusted source for investing success
- Lithium Outlook
- Oil and Gas Outlook
- Gold Outlook Report
- Uranium Outlook
- Rare Earths Outlook
- All Outlook Reports
- Top Generative AI Stocks
- Top EV Stocks
- Biggest AI Companies
- Biggest Blockchain Stocks
- Biggest Cryptocurrency-mining Stocks
- Biggest Cybersecurity Companies
- Biggest Robotics Companies
- Biggest Social Media Companies
- Biggest Technology ETFs
- Artificial Intellgience ETFs
- Robotics ETFs
- Canadian Cryptocurrency ETFs
- Artificial Intelligence Outlook
- EV Outlook
- Cleantech Outlook
- Crypto Outlook
- Tech Outlook
- All Market Outlook Reports
- Cannabis Weekly Round-Up
- Top Alzheimer's Treatment Stocks
- Top Biotech Stocks
- Top Plant-based Food Stocks
- Biggest Cannabis Stocks
- Biggest Pharma Stocks
- Longevity Stocks to Watch
- Psychedelics Stocks to Watch
- Top Cobalt Stocks
- Small Biotech ETFs to Watch
- Top Life Science ETFs
- Biggest Pharmaceutical ETFs
- Life Science Outlook
- Biotech Outlook
- Cannabis Outlook
- Pharma Outlook
- Psychedelics Outlook
- All Market Outlook Reports
Excelsior Mining (TSXV:MIN) has completed feasibility level hydrological test work at its Gunnison project in Arizona.
Excelsior Mining (TSXV:MIN) has completed feasibility level hydrological test work at its Gunnison project in Arizona.
As quoted in the press release:
A total of 26 hydrological test wells, totalling 25,870 feet of drilling, were used in the current hydrological test program. The holes were drilled in various locations around the North Star deposit, representing a variety of fractured zones, rock types and mineralized areas. Of the 26 holes drilled, 18 were pump test holes and 8 were observation holes. The pump test holes were pumped for approximately five days and were surrounded by the new observation wells and by numerous pre-existing observation wells. In all, approximately 65 observation wells were monitored during the pump testing, generating a comprehensive high quality data set.
The data collected from this program will be used to characterize the various groundwater properties that determine the movement of fluids through the mineralized bedrock. This information will be used to produce 3D hydro-geological models for requisite permit applications and the bankable feasibility study. The 3D hydro-geological models will simulate the planned in-situ recovery process and demonstrate hydraulic control during mining operations. Excelsior management expects the results of all testing, and 3D models will be completed by early Q3. Excelsior will issue a press release when this work is fully complete.
Excelsior president and CEO, Stephen Twyerould, said:
The successful conclusion of our hydrological test program, on time and on budget, demonstrates our ability to run complex technical work programs with optimal efficiency. We look forward to releasing the results of our test work and 3D hydrological modelling and moving the Gunnison Project a significant step closer to commercial production.
Click here to read the Excelsior Mining (TSXV:MIN) press release
Latest News
Investing News Network websites or approved third-party tools use cookies. Please refer to the cookie policy for collected data, privacy and GDPR compliance. By continuing to browse the site, you agree to our use of cookies.Â