- AustraliaNorth AmericaWorld
Investing News NetworkYour trusted source for investing success
- Lithium Outlook
- Oil and Gas Outlook
- Gold Outlook Report
- Uranium Outlook
- Rare Earths Outlook
- All Outlook Reports
- Top Generative AI Stocks
- Top EV Stocks
- Biggest AI Companies
- Biggest Blockchain Stocks
- Biggest Cryptocurrency-mining Stocks
- Biggest Cybersecurity Companies
- Biggest Robotics Companies
- Biggest Social Media Companies
- Biggest Technology ETFs
- Artificial Intellgience ETFs
- Robotics ETFs
- Canadian Cryptocurrency ETFs
- Artificial Intelligence Outlook
- EV Outlook
- Cleantech Outlook
- Crypto Outlook
- Tech Outlook
- All Market Outlook Reports
- Cannabis Weekly Round-Up
- Top Alzheimer's Treatment Stocks
- Top Biotech Stocks
- Top Plant-based Food Stocks
- Biggest Cannabis Stocks
- Biggest Pharma Stocks
- Longevity Stocks to Watch
- Psychedelics Stocks to Watch
- Top Cobalt Stocks
- Small Biotech ETFs to Watch
- Top Life Science ETFs
- Biggest Pharmaceutical ETFs
- Life Science Outlook
- Biotech Outlook
- Cannabis Outlook
- Pharma Outlook
- Psychedelics Outlook
- All Market Outlook Reports
Copper North Mining
Copper Resource in Canada’s Yukon Territory
Copper North Mining Financial Filings Extension
Copper North Mining Makes Board Changes
Copper North Clarifies Technical Disclosure
Overview
Copper North Mining Corp. (TSXV:COL) is a mineral exploration and development company focused on transforming the Carmacks project into a low-cost, environmentally sustainable, copper and precious metals producer. Carmacks is a near-term producer and is partially permitted for construction.
The Carmacks project is 100 percent owned by Copper North and located 220 kilometers northwest of Whitehorse, in the mining-friendly Yukon Territory. The project is road accessible and located 11 kilometers from grid power.
Copper North’s Carmacks Project – Key Values
- Advanced-stage:
- Approximately 3.5 years to production
- Positioned to take advantage of any potential copper supply shortfalls
- Partly permitted to build
- Feasibility engineering-level open pit mining, waste rock management and infrastructure designs
- Low-cost copper producer:
- C1 cash cost of US$1.08 per pound after precious metal credits (2016 PEA)
- Established regional infrastructure:
- Road accessible
- 11 kilometers from Yukon grid power (94 percent hydro generated in 2018)
- High-grade oxide copper-gold–silver mineral resource:
- Drilling in 2015 and 2017 increased the oxide mineral resource tonnage by 36 percent, potentially adding 2.5 years to the currently planned seven-year mine life, with further exploration potential remaining on the property (2016 PEA and April 9, 2018 news release)
- Underlying sulfide mineral resource open at depth along the entire oxide strike length
- Engineered for environmentally sustainable copper production:
- Dry stack tailings management, grid power, cathode copper production on-site with no smelting required
Get access to more exclusive Copper Stock profiles here.
Interactive Chart
Investing News Network websites or approved third-party tools use cookies. Please refer to the cookie policy for collected data, privacy and GDPR compliance. By continuing to browse the site, you agree to our use of cookies.