- AustraliaNorth AmericaWorld
Investing News NetworkYour trusted source for investing success
- Lithium Outlook
- Oil and Gas Outlook
- Gold Outlook Report
- Uranium Outlook
- Rare Earths Outlook
- All Outlook Reports
- Top Generative AI Stocks
- Top EV Stocks
- Biggest AI Companies
- Biggest Blockchain Stocks
- Biggest Cryptocurrency-mining Stocks
- Biggest Cybersecurity Companies
- Biggest Robotics Companies
- Biggest Social Media Companies
- Biggest Technology ETFs
- Artificial Intellgience ETFs
- Robotics ETFs
- Canadian Cryptocurrency ETFs
- Artificial Intelligence Outlook
- EV Outlook
- Cleantech Outlook
- Crypto Outlook
- Tech Outlook
- All Market Outlook Reports
- Cannabis Weekly Round-Up
- Top Alzheimer's Treatment Stocks
- Top Biotech Stocks
- Top Plant-based Food Stocks
- Biggest Cannabis Stocks
- Biggest Pharma Stocks
- Longevity Stocks to Watch
- Psychedelics Stocks to Watch
- Top Cobalt Stocks
- Small Biotech ETFs to Watch
- Top Life Science ETFs
- Biggest Pharmaceutical ETFs
- Life Science Outlook
- Biotech Outlook
- Cannabis Outlook
- Pharma Outlook
- Psychedelics Outlook
- All Market Outlook Reports
Decklar Resources Inc. has provided an update to operations at the Oza-1 well re-entry at the Oza oil field in Nigeria, being performed by the company’s wholly owned Nigeria-based subsidiary, Decklar Petroleum Ltd.
Decklar Resources Inc. has provided an update to operations at the Oza-1 well re-entry at the Oza oil field in Nigeria, being performed by the company’s wholly owned Nigeria-based subsidiary, Decklar Petroleum Ltd.
Rig on-site at Oza-1 preparing to commence operations
Re-entry operations at the Oza-1 well site are progressing with functional testing and inspection of the rig completed, all approvals granted and the initial work activities of pulling the existing tubing are under way. After the existing tubing has been removed from the wellbore, a cement bond log will be run to confirm the integrity of the cement behind the casing, followed by pulling the 5-1/2-inch casing that is inside the nine-five-eighths-inch casing and running cased hole reservoir logs. When the logging is complete and has been analyzed, the well will be cleaned out and perforation and production testing operations will commence on the three known oil-bearing zones (L2.2, L2.4 and L2.6). Each targeted zone will be production flow tested independently, and all test volumes produced will be exported and sold through the existing production facilities and pipelines. Once testing of all three zones is completed, it is anticipated that a final dual-tubing string completion will be installed, and the L2.2 and L2.6 zones placed into production based upon successful testing.
When the Oza-1 re-entry is complete, the drilling rig is then expected to be skidded on the same drill pad as the Oza-1 well to a new drilling slot and a horizontal development well will be drilled in the L2.4 zone. It is anticipated that this well will then be placed on production upon successful testing and completion. The Oza-1 well and new horizontal development well are expected to generate significant production levels and generate cash flow in a short time frame utilizing the existing infrastructure in place. The Oza oil field development is planned to then continue with one or two more re-entries on other existing wells and an additional development drilling program with a potential for eight to 10 wells to be drilled to achieve full field development. Additional early production and central processing facilities will be added as required to accommodate increased production levels from field development activities.
The company anticipates that operations for the re-entry of the Oza-1 well are on track for initial production testing to commence immediately following perforating and running the testing string. The Oza oil field has significant export and production capacity through processing facilities and infrastructure already in place and operational, which will allow for the immediate export and sale of crude oil from the Oza-1 well.
Decklar also continues to pursue and advance evaluations and negotiations for additional proven undeveloped oil and gas fields in Nigeria that have significant reserves and near-term production potential, including the recently announced acquisition in the Asaramatoru oil field.
Duncan Blount, chief executive officer of Decklar, stated: “As we progress the Oza-1 re-entry activities and the commencement of production testing, we are at the forefront of transitioning the company from a developer into a producing oil company. Thanks to the infrastructure already in place, the flow test from the Oza-1 well will go directly into the pipeline to the Bonny Export terminal to generate near-term cash flow. We look forward to ramping up production as we continue towards full field development at the Oza field. The cash flow from the Oza field will support Decklar’s strategy of consolidating and re-establishing production of high-margin, proven undeveloped conventional oil fields in Nigeria.”
We seek Safe Harbor.
Click here to connect with Decklar Resources Inc. (TSXV:DKL) for an Investor Presentation.
Latest News
Investing News Network websites or approved third-party tools use cookies. Please refer to the cookie policy for collected data, privacy and GDPR compliance. By continuing to browse the site, you agree to our use of cookies.