CKR Carbon Announces 6.06% Cg over 88 Metres at Buckingham

Battery Metals

CKR Carbon (TSXV: CKR) (FSE: CB81) (“CKR” or the “Company”) a vertically integrated graphite to graphenes, advanced materials development company is pleased to provide initial results from the diamond drilling and trenching program at its 100% owned Buckingham graphite project in Quebec. Results have been received from three of five holes and one of four trenches, …

CKR Carbon (TSXV: CKR) (FSE: CB81) (“CKR” or the “Company”) a vertically integrated graphite to graphenes, advanced materials development company is pleased to provide initial results from the diamond drilling and trenching program at its 100% owned Buckingham graphite project in Quebec. Results have been received from three of five holes and one of four trenches, with assays up to 20.69% Cg (carbon as graphite) over 8 metres in drill hole 17-02.
Highlights of the results received to date include 15.0% Cg over eight metres in Trench 2, 7.35% Cg over 12 metres in hole CK17-01, and 6.06% Cg over 88 metres from nine metres that included a higher-grade interval of 20.69% Cg over 8 metres in hole CK17-02.
Results from trench two are encouraging, since it extends the known graphite mineralization approximately 230 metres to the southeast and confirms the coincidence of graphite mineralization with the EM conductor.
Roger Moss, Chief Executive Officer of CKR Carbon, said:

“We are very pleased with these results from our 100% owned Buckingham Project that confirm the graphite is associated with the EM conductor over the length tested to date. Results from Trench 17 TR-02 are particularly significant as it represents a 230 metre step southeast along the EM conductor.”

Click here to read the full text release. 


 
The Conversation (0)
×