Supreme Resources Ltd. reported the results of rock sampling from the Main showing at the Verde copper-silver-gold project located in the Copper Mountain mining camp.
Supreme Resources Ltd. reported the results of rock sampling from the Main showing at the Verde copper-silver-gold project located in the Copper Mountain mining camp.
The press release is quoted as saying:
The strongest copper-silver-gold mineralization occurs over the first 14.5 metres (0-14.5 metres) and the last 3 metres (36-39 metres) of the trench. The section from 0 to 14.5 metres gave 0.34% copper, 4.54 grams/tonne silver and 0.032 gram/tonne gold, including 9 metres (2-11 metres) of 0.49% copper, 6.86 grams/tonne silver and 0.046 gram/tonne gold.