Rye Patch Gold Corp. (TSXV:RPM,OTCQX:RPMGF) announced drill results from the 2014 program at its Gold Ridge project, commenting that 12 reverse-circulation holes were completed on the Silver Ridge target.
Rye Patch Gold Corp. (TSXV:RPM,OTCQX:RPMGF) announced drill results from the 2014 program at its Gold Ridge project, commenting that 12 reverse-circulation holes were completed on the Silver Ridge target.
As quoted in the press release:
The drill program was designed to test silicified sediments – jasperoid – within the hinge zone of a north-south oriented anticlinorium.
HIGHLIGHTS:
- GR-017 returned 0.67 g/t Au, 28.5 g/t Ag, 1.24 g/t AuEq over 19.8 metres, including 0.76 g/t Au, 86 g/t Ag over 4.6 metres from the hinge zone of the anticline;
- GR-025 drilled the east limb and reported 1.3 g/t Au, 12.2 g/t Ag, 1.54 g/t AuEq over 10.7 metres. The drillhole ended in mineralization;
- Drilling extends mineralization 500 metres northward with 4 kilometres untested;
- All drillholes returned mineralization; and
- Approximately 12 square kilometres (180 claims) staked north along strike.
Click here to read the full Rye Patch Gold Corp. (TSXV:RPM,OTCQX:RPMGF) press release.