Initial Drill Results in for Second Phase Drilling at the Marban Block

Gold Investing

Niogold Mining Corp.(TSXV:NOX) announced the initial drill results of the second phase drill program at its Marban block property. The Company reported results from 15 new drill holes on the property. Niogold are hoping to complete the second phase program by the end of Q2 2012.

Niogold Mining Corp.(TSXV:NOX) announced the initial drill results of the second phase drill program at its Marban block property. The Company reported results from 15 new drill holes on the property. Niogold are hoping to complete the second phase program by the end of Q2 2012.

Highlights include:

  • Hole MB-12-272, drilled on line/section 4550E, at the eastern end of the Marban deposit, returned four important gold mineralised intervals as follows:
  • 5.6 g/t Au over 7.2 metres at 235 metres at vertical depth
  • 3.0 g/t Au over 14.4 metres at 260 metres at vertical depth
  • 7.6 g/t Au over 5.0 metres at 360 metres at vertical depth
  • 6.4 g/t Au over 8.9 metres at 380 metres at vertical depth

Click here to read the Niogold Mining Corp. (TSXV:NOX) press release


Click here to see the Niogold Mining Corp. (TSXV:NOX) profile.

The Conversation (0)
×