Molycor Gold Corp.: Beaverdell Silver Project Generates Significant Results From 16 Diamond Drill Holes

Company News

Edward Lee, President of Molycor Gold Corp. (TSXV:MOR,PINK SHEETS:MLYFF,FWB:M1V) is pleased to announce the completion of its drill program that has produced significant silver, copper, lead, zinc and gold values from split diamond drill core from its 100% owned Beaverdell Silver Project located 3 km east of Beaverdell, BC.

Edward Lee, President of Molycor Gold Corp. (TSXV:MOR,PINK SHEETS:MLYFF,FWB:M1V) is pleased to announce the completion of its drill program that has produced significant silver, copper, lead, zinc and gold values from split diamond drill core from its 100% owned Beaverdell Silver Project located 3 km east of Beaverdell, BC.

As stated in the press release:

The program consisted of 16 diamond drill holes totaling 2,457 meters (8,060 feet), from 9 drill stations, on the Duncan-Bounty and Kokomo-Tiger Zones in July-August, 2011. The objective of the drilling was to intersect depth extensions of known mineralization outlined in previous surface outcrop sampling. The following results were obtained from angle and vertical diamond drill holes collared south of Duncan-Bounty (DDH-2) and Kokomo-Tiger (DDH-5 to 16). Diamond drill holes 5 to 16, are located 30-50 meters south of the Kokomo-Tiger surface showings in the north portion of Molycor’s mineral tenures.

Click here to read the full Molycor Gold Corp. (TSXV:MOR,PINK SHEETS:MLYFF,FWB:M1V) press release.

The Conversation (0)
×