U308 Assay Results From Berlin Uranium Project

Company News

U3O8 Corp. (TSX:UWE,TSXV:UWE,OTCQX:UWEFF) announced assay results from 12 bore holes confirm that mineralization extends over a minimum of 6.3 kilometres (“km”) of a 10.5km prospective trend in the Berlin uranium project.

U3O8 Corp. (TSX:UWE,TSXV:UWE,OTCQX:UWEFF) announced assay results from 12 bore holes confirm that mineralization extends over a minimum of 6.3 kilometres (“km”) of a 10.5km prospective trend in the Berlin uranium project.

As quoted in the press release:

Mineralization is open along strike and exploration drilling is ongoing on the remainder of the Berlin trend where trenching has encountered similar mineralization at surface.

U308 President and CEO, Richard Spencer said:

These results are extremely positive because they show that mineralization extends over an additional area that is about 1.5 times the size of the maiden resource area – with more drill results to come from the northern half of the Berlin trend. Berlin continues to show remarkable geological continuity with the uranium and other commodities concentrated in a specific and easily recognizable limestone-sandstone unit. Since the grade of uranium and other elements in the new area is similar to that of the current Berlin resource, we intend to undertake an infill drilling program to convert the newly discovered mineralization into additional resources. Additionally, the preliminary economic assessment being undertaken by Bateman Engineering N.V., an international company with extensive experience in the construction of multi-commodity processing plants, is on track for delivery by the end of 2012.

Click here to read the U3O8 Corp. (TSX:UWE) press release.  

The Conversation (0)
×