European Uranium Resources Completes Drill Program at Kuriskova

Company News

European Uranium Resources Ltd. (TSXV:EUU,FWB:TGPN) has completed its metallurgical drilling program at the Kuriskova uranium deposit; sufficient sample weight at appropriate grade for testing has been obtained as part of the ongoing feasibility study.

European Uranium Resources Ltd. (TSXV:EUU,FWB:TGPN) has completed its metallurgical drilling program at the Kuriskova uranium deposit; sufficient sample weight at appropriate grade for testing has been obtained as part of the ongoing feasibility study.

As quoted in the press release:

Downhole gamma logging results from the first drill hole (LE-K-73) were reported in an earlier news release dated June 26, 2012. Significant downhole gamma logging results from the final two holes (LE-K-74 and LE-K-75) together with summary of results from nearest previous holes are presented here:

  • LE-K-74: 2.9 m @ 0.478% eU3O8, including 0.5 m @ 1.847% eU3O8.

The two nearest historic holes are:

  • Hole 1181 with 3.6 m @ 0 .143% eU3O8 at a distance of 33 metres west of LE-K-74; and
  • LH-K-13A with 1.2 m@ 0.519% U3O8 at a distance of 30 metres northeast of LE-K-74
  • LE-K-75: 2.6 m @ 0.468% eU3O8, including 0.8 m @ 1.212% eU3O8.

The two nearest historic holes are:

  • Hole LH-K-14A with 3.0 m @ 1.454% U3O8 at a distance of 18 metres north of Hole LE-K-75; and
  • Hole 1182 with 4.8 m @ 1.453% eU3O8 at a distance of 20 metres northwest of Hole LE-K-75.

Click here to read the European Uranium (TSXV:EUU,FWB:TGPN) press release
Click here to see the European Uranium (TSXV:EUU,FWB:TGPN) profile

The Conversation (0)
×