• Connect with us
    • Information
      • About Us
      • Contact Us
      • Careers
      • Partnerships
      • Advertise With Us
      • Authors
      • Browse Topics
      • Events
      • Disclaimer
      • Privacy Policy
    • Australia
      North America
      World
    Login
    Investing News NetworkYour trusted source for investing success
    • North America
      Australia
      World
    • My INN
    Videos
    Companies
    Press Releases
    Private Placements
    SUBSCRIBE
    • Reports & Guides
      • Market Outlook Reports
      • Investing Guides
    • Button
    Resource
    • Precious Metals
    • Battery Metals
    • Base Metals
    • Energy
    • Critical Metals
    Tech
    Life Science
    Resource Market
    Resource News
    Resource Stocks
    • Resource Market
    • Resource News
    • Resource Stocks

    Reef Resources Ltd. Announces 100 bopd Test Rate for Ausable #1

    Investing News Network
    Oct. 07, 2011 05:09PM PST
    Resource Investing News

    Reef Resources Ltd. (TSXV:REE) has completed the production testing of its Ausable well #1 using hydraulic venturi downhole pump technology.

    Reef Resources Ltd. (TSXV:REE) has completed the production testing of its Ausable well #1 using hydraulic venturi downhole pump technology.

    As quoted in the press release:

    The Company is now in the process of installing the permanent venturi pumping equipment in Ausable well #1. The new pumping equipment will be installed in the recently drilled Ausable well #5 followed by Ausable well #2 and Ausable well #4. Clean up on the Ausable #2 horizontal well is completed and the new pumping equipment will be installed upon completion of production flow testing.

    During the test period the venturi was run for a number of periods to test the surface and downhole pumps and to optimise pump rates and fluids. Reef estimates that the stabilized long term production rate for Ausable well #1 using venturi pumping will be between 50 – 70 bopd and is confident that the production rates for the additional production wells (Ausable #2, Ausable #4 and Ausable #5) will also achieve similar production levels upon installation of venturi pumps. Ausable well #1 was previously being pumped using a traditional beam pump and was recently producing between 5 and 10 bopd. These estimates represent production prior to the full execution of the Enhanced Oil Recovery (“EOR”) program.

    Click here to read the Reef Resources Ltd. (TSXV:REE) press release

    The Conversation (0)

    Go Deeper

    AI Powered
    TSXV:RDS

    Radisson Mining Releases NI 43-101 PEA For O'Brian Gold Project

    TSXV:BSK

    Blue Sky Uranium Announces a Positive Preliminary Economic Assessment for the Ivana Uranium-Vanadium Deposit, Amarillo Grande Project, Argentina

    Latest News

    Outlook Reports

    Resource
    • Precious Metals
      • Gold
      • Silver
    • Battery Metals
      • Lithium
      • Cobalt
      • Graphite
    • Energy
      • Uranium
      • Oil and Gas
    • Base Metals
      • Copper
      • Nickel
      • Zinc
    • Critical Metals
      • Rare Earths
    • Industrial Metals
    • Agriculture
    Tech
      • Artificial Intelligence
      • Cybersecurity
      • Gaming
      • Cleantech
      • Emerging Tech
    Life Science
      • Biotech
      • Cannabis
      • Psychedelics
      • Pharmaceuticals

    Featured Stocks

    More featured stocks

    Browse Companies

    Resource
    • Precious Metals
    • Battery Metals
    • Energy
    • Base Metals
    • Critical Metals
    Tech
    Life Science
    MARKETS
    COMMODITIES
    CURRENCIES
    ×