- WORLD EDITIONAustraliaNorth AmericaWorld
Investing News NetworkYour trusted source for investing success
- Lithium Outlook
- Oil and Gas Outlook
- Gold Outlook Report
- Uranium Outlook
- Rare Earths Outlook
- All Outlook Reports
- Top Generative AI Stocks
- Top EV Stocks
- Biggest AI Companies
- Biggest Blockchain Stocks
- Biggest Cryptocurrency-mining Stocks
- Biggest Cybersecurity Companies
- Biggest Robotics Companies
- Biggest Social Media Companies
- Biggest Technology ETFs
- Artificial Intellgience ETFs
- Robotics ETFs
- Canadian Cryptocurrency ETFs
- Artificial Intelligence Outlook
- EV Outlook
- Cleantech Outlook
- Crypto Outlook
- Tech Outlook
- All Market Outlook Reports
- Cannabis Weekly Round-Up
- Top Alzheimer's Treatment Stocks
- Top Biotech Stocks
- Top Plant-based Food Stocks
- Biggest Cannabis Stocks
- Biggest Pharma Stocks
- Longevity Stocks to Watch
- Psychedelics Stocks to Watch
- Top Cobalt Stocks
- Small Biotech ETFs to Watch
- Top Life Science ETFs
- Biggest Pharmaceutical ETFs
- Life Science Outlook
- Biotech Outlook
- Cannabis Outlook
- Pharma Outlook
- Psychedelics Outlook
- All Market Outlook Reports
Connacher Oil and Gas Initiates SAGD Project At Great Divide Oil Sands Algar Pad
Connacher Oil and Gas Limited (TSE:CLL) reports it has initiated the injection of solvent with steam on two wells 203-2 and 203-3.
Connacher Oil and Gas Limited (TSX:CLL) reports it has initiated the injection of solvent with steam on two wells 203-2 and 203-3.
The press release is quoted as saying,
This pilot project is designed to measure the increase in bitumen production due to the downhole reduction of bitumen viscosity, through the interaction of the solvent and bitumen at the steam oil interface and the amount of solvent recovered after it is injected. Connacher anticipates there will be a measurable improvement in individual well and overall steam:oil ratios (“SORs”) as a consequence of the solvent injection. In turn, this is anticipated to be further improved as a result of anticipated increases in individual well productivity and overall Algar production levels. If the field trial project proves to be as successful as Connacher’s initial laboratory and simulation results, solvent injection may be expanded to all seven wells on Pad 203 by year end 2011. Further applications to the two other Algar well pads and possibly also to Pod One would then be under consideration for 2012.
Latest News
Investing News Network websites or approved third-party tools use cookies. Please refer to the cookie policy for collected data, privacy and GDPR compliance. By continuing to browse the site, you agree to our use of cookies.