Belmont & Int. Montoro reports drilling with intersection of 0.182% U3O8

Company News

Belmont Resources and International Montoro Resources report drill results from the Crackingstone property with intersection of 0.182% U3O8.  The drilling program was planned to test a northeasterly trending electromagnetic conductor coincident with the Boom Lake Fault which hosts the Beck 94 mineralized zone where surface sampling returned 1.24% U3O8 in 2007. This drilling tested and confirmed the presence …

Belmont Resources and International Montoro Resources report drill results from the Crackingstone property with intersection of 0.182% U3O8.

 The drilling program was planned to test a northeasterly trending electromagnetic conductor coincident with the Boom Lake Fault which hosts the Beck 94 mineralized zone where surface sampling returned 1.24% U3O8 in 2007. This drilling tested and confirmed the presence of uranium mineralization for a strike distance of 1800m (1.12 Miles) along the Boom Lake Fault. The drilling also intersected an east-west structure (North Crackingstone Fault) in holes C-09-08, C-10-08 and C-11-08. The drilling to this point strongly indicates increased width, intensity of alteration and uranium mineralization around the intersection point of these two faults.

For complete story, click this link. To view Belmont’s company profile, click here. To view previous releases of Belmont and Int. Montoro, click here. Follow developments in resource mining and exploration for free.Sign on to the Resource Investing Newsletter.

The Conversation (0)
×