The Conversation (0)
Buxton Reports High-grade Intercepts at Yalbra Graphite Project
Aug. 05, 2014 11:36AM PST
Battery MetalsBuxton Resources Ltd. (ASX:BUX) announced results from seven further drill holes completed at the Western Australia-based Yalbra graphite project.
Buxton Resources Ltd. (ASX:BUX) announced results from seven further drill holes completed at the Western Australia-based Yalbra graphite project.
As quoted in the press release:
- Wide and high grade intercepts include;
- YBRC017: 39m @ 18.1% TGC (from 18m) inc. 11m @ 24.2% TGC
- YBRD016: 30m @ 19.0% TGC (from 48m) inc. 10m @ 25.0% TGC
- YBRC019: 26m @ 15.2% TGC (from 90m) inc. 5m @ 23.2% TGC
- YBRC018: 19m @ 16.2% TGC (from 11m) inc. 5m @ 21.4% TGC
- YBRC025: 18m @18.4% TGC (from 69m) inc. 5m @ 30.3% TGC
- Results show significant extensions of high grade graphite mineralisation along strike to the west of the existing resource
- An additional 7 drill-holes from the program are yet to be reported
Click here to read the full Buxton Resources Ltd. (ASX:BUX) press release.