Tamerlane Ventures Inc.: Summer Drill Program Confirms Significant Mineralization at the Pine Point W-85 Deposit

Base Metals Investing

Tamerlane Ventures Inc. (TSXV:TAM) announced assay results from the summer drill program conducted on the W-85 deposit at its Pine Point Project in Canada’s Northwest Territories.

NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES. ANY FAILURE TO COMPLY WITH THIS RESTRICTION MAY CONSTITUTE A VIOLATION OF U.S. SECURITIES LAW.

Tamerlane Ventures Inc. (TSXV:TAM) announced assay results from the summer drill program conducted on the W-85 deposit at its Pine Point Project in Canada’s Northwest Territories.

As quoted in the press release:

The purpose of this drill program was to provide current drill data to convert historical W-85 resources into National Instrument (“NI”) 43-101 compliant resources and provide a sample sufficient for metallurgical testing that will confirm the suitability of the ore for the R-190 flowsheet, which includes dense media separation. The drill program entailed drilling 10 diamond drill holes totaling 1,305 meters. This drill program will enable the W-85 deposit to be added to the current mineral inventory, which is detailed below. Tamerlane has retained MineTech International Ltd. to complete the NI 43-101 resource calculation which is scheduled to be completed early in the new year.

Tamerlane Ventures CEO, Mike Willett, said:

“We are pleased to see that the summer drill program is providing confirmation that there is significant mineralization at the W-85 deposit. This is a deposit that is lead/zinc rich and may be accessible through open pit mining methods. Our objective is to continue to add to our NI 43-101 resource base so that we have 15 years or more of reserves and resources.”

Click here to read the Tamerlane Ventures Inc. (TSXV:TAM) press release


Click here to see the Tamerlane Ventures Inc. (TSXV:TAM) profile.

The Conversation (0)
×