Century Iron Provides Results of Phase II Drilling at Joyce Lake

Iron Investing

Century Iron Mines Corp. (TSX:FER) announced positive assay results from the second phase of the 2013 drilling program completed at its Quebec-based Joyce Lake DSO project. The results “confirm the continuity of the mineralized lenses within the pit defined” in the company’s May 2013 preliminary economic assessment.

Century Iron Mines Corp. (TSX:FER) announced positive assay results from the second phase of the 2013 drilling program completed at its Quebec-based Joyce Lake DSO project. The results “confirm the continuity of the mineralized lenses within the pit defined” in the company’s May 2013 preliminary economic assessment.

Highlights include:

  • Drill hole Joy 13-168 intersected 69 metres of enriched iron mineralization with an average of 65.42% Total Iron (“TFe”);
  • Drill hole Joy 13-156 intersected 31.7 metres of enriched iron mineralization with an average of 63.6% TFe;
  • Drill hole Joy 13-150 intersected 15.0 metres of enriched iron mineralization with an average of 66.12% TFe; and
  • Drill hole Joy 13-153 intersected 13.8 metres of enriched iron mineralization with an average of 65.1% TFe and ended in high-grade mineralization.

Click here to read the full Century Iron Mines Corp. (TSX:FER) press release.

The Conversation (0)
×