Coro Reports Final Drilling Results From Marimaca

Copper Investing

Coro Mining (“Coro” or the “Company”) (TSX:COP) is pleased to announce the results of the final 23 reverse circulation (RC) holes from the 39 hole, 8530m hole drill program completed at its Marimaca copper project, located 22km E of the port of Mejillones in the II Region of Chile, (Fig. 1). Previous drill results from …

Coro Mining (“Coro” or the “Company”) (TSX:COP) is pleased to announce the results of the final 23 reverse circulation (RC) holes from the 39 hole, 8530m hole drill program completed at its Marimaca copper project, located 22km E of the port of Mejillones in the II Region of Chile, (Fig. 1). Previous drill results from Marimaca were released on April 28, May 6, September 6 and October 4 2016.
Alan Stephens, President and CEO of Coro commented, “As with the prior results, these final holes intersected attractive mineralization and confirm the extent and continuity of the deposit as we step out from the original drilled area. Only 2 holes out of the entire resource definition drill program did not intersect mineralization and they define the SW margin of the body, which remains open in other directions. Its geometry is confirmed as a 150-250m thick, gently ESE dipping, slab of strongly fractured Jurassic diorite formed at the intersection of the major N striking Marimaca structure and NE striking mineralizing feeder zones. Hypabyssal diorite intrusives are associated with the introduction of chalcopyrite (mainly as veinlets), which was subsequently largely supergene enriched to chalcocite and covellite. The resulting secondary enrichment blanket has been almost completely oxidised to green copper oxides (mostly brochantite and chrysocolla), with lower grade copper wad and black oxides deposited at the peripheries of the deposit during oxidation. The deposit is cross cut by unmineralized late and post mineral dykes and sills.
“Metallurgical column test work is underway and the initial resource estimate is scheduled for completion in November. Due diligence for the acquisition of Minera Rayrock, owner of the ~10ktpy Cu Ivan SXEW plant located ~20km S of Marimaca, (see our August 4 2016 news release), is almost complete. Various development scenarios for the project are being evaluated.”
Drilling Results
Latest results are shown on Tables 1 where %CuT means total copper. Drill hole locations are shown on Fig. 2 and a typical cross section on Fig. 3. Acid solubilities for all samples in the oxide zone are good at 72% for all assays > 0.1%CuT and rising to 79% for >0.3%CuT.
Table 1: Intersections
HoleTDFromTom%CuTType
MAR-32200m98118200.17Oxide
and134148140.19Oxide
188200120.17Oxide
MAR-33B200m98142440.49Oxide
and160188280.39Enriched
MAR-34270m1522541020.79All
including152192401.28Oxide
19219641.77Enriched
196208120.97Primary
208246380.23Oxide
24625480.28Primary
MAR-35250mand114198840.31Oxide
22423280.49Primary
MAR-36200m130192620.42Oxide
MAR-37200m162178160.22Oxide
MAR-38200m032320.51Oxide
and114142280.40Oxide
MAR-39400m82164820.83All
including82142600.86Oxide
142164220.74Mixed
and192242500.49Oxide
MAR-40200m54104500.49Oxide
and118140220.43Oxide
150160100.44Oxide
MAR-41200m2278560.44Oxide
and142170280.28Oxide
MAR-42200m3678420.36Oxide
and106172660.79All
including106152460.51Oxide
152172201.42Mixed
MAR-43200m466620.31Oxide
7486120.62Oxide
and98150520.45Oxide
MAR-44200m1628120.58Oxide
and6892240.32Oxide
102132300.51Oxide
150200501.31All
including150166160.80Oxide
166178121.43Mixed
178198201.17Oxide
19820026.08Enriched
MAR-45200m21941920.83All
including21261240.70Oxide
126140141.28Primary
144190461.12Oxide
19019440.58Primary
MAR-46150m01341340.67All
including084840.56Oxide
849065.30Enriched
90134440.25Oxide
MAR-47150m3494600.26Oxide
and118132140.22Oxide
MAR-51250m98108100.20Oxide
and134204700.26Oxide
MAR-52250m86104180.47Oxide
and122156340.40Oxide
MAR-53250m264620.49Oxide
and102112100.43Oxide
126154280.68All
including12613480.67Oxide
14214861.98Primary
14815460.21Oxide
MAR-54200m3284520.88Oxide

Holes MAR-48 to 50 tested geochemical anomalies to the E of the outcropping mineralization. They intersected spotty copper values consistent with their location in the hanging wall pyrite halo of the deposit, now strongly leached to limonite.
Agreement Terms
Coro has the right to earn a 75% interest in the property as follows;

  • 51% interest earned in Compañia Minera Newco Marimaca (CMNM) with a $125k payment together with completion of a NI43-101 resource estimate and engineering study that demonstrates the technical and economic feasibility of producing a minimum of 1.5ktpy Cu cathode by August 6th 2018 at Coro’s cost,
  • Additional 24% interest in CMNM earned by Coro upon obtaining financing for the project construction
  • The owner’s interest will comprise a 15% interest free carried to commencement of commercial production and a 10% participating interest subject to dilution. The owners at their election may request Coro to loan them the equity portion corresponding to their 10% interest, if any, recoverable by Coro from 100% of the project’s free cash flow after debt repayments
  • Coro retains a first right of refusal

Sampling and Assay Protocol
True widths cannot be determined with the information available at this time. Coro RC holes were sampled on a 2 m continuous basis, with dry samples riffle split on site and one quarter sent to the Geolaquim laboratory in Copiapo, Chile by Coro personnel for preparation and assaying. A second quarter was stored on site for reference. Core from DDH holes was photographed, logged, split and sampled on site by Coro personnel and one half of the core sent to Geolaquim. Samples were prepared using the following standard protocol: drying; crushing to better than 85% passing -10#; homogenizing; splitting; pulverizing a 500-700g subsample to 95% passing -150#; and a 125g split of this sent for assaying. All samples were assayed for CuT (total copper) and CuS (acid soluble copper) by AAS. A full QA/QC program, involving insertion of appropriate blanks, standards and duplicates was employed with acceptable results. Samples showing significant secondary sulphides will be assayed for CuCN (cyanide soluble copper) in due course. Pulps and sample rejects are stored by Coro for future reference.
Sergio Rivera, Vice President of Exploration, Coro Mining Corp, a geologist with more than 32 years of experience and a member of the Colegio de Geologos de Chile and of the Instituto de Ingenieros de Minas de Chile, was responsible for the design and execution of the exploration program and is the Qualified Person for the purposes of NI 43-101. Alan Stephens, FIMMM, President and CEO, of Coro Mining Corp, a geologist with more than 40 years of experience, and a Qualified Person for the purposes of NI 43-101, is responsible for the contents of this news release.
To view Figures 1-3, click on the following link: https://media3.marketwire.com/docs/Coro1017.pdf
CORO MINING CORP.
Alan Stephens
President and CEO

About Coro Mining Corp.:
Coro’s strategy is to grow a mining business through the discovery, development and operation of “Coro type” deposits. These are defined as projects at whatever stage of development, that are well located with respect to infrastructure and water, which have low permitting risk, and which have the potential to achieve a short and cost effective timeline to production. Our preference is for open pit heap leach copper projects, where we will seek to minimise capital investment rather than maximise NPV, where we will prioritise profitability over production rate, and finally, where the likely capital cost is financeable relative to our market capitalization. The Company’s assets include its 65% interest in SCM Berta including the Berta and Salvadora deposits; the Marimaca drill stage project; the Planta Prat project; the Llancahue prospect; and a royalty on the San Jorge copper-gold project located in Argentina.
This news release includes certain “forward-looking statements” under applicable Canadian securities legislation. Such forward-looking statements or information, include but are not limited to those with respect to the geological potential and size of Marimaca. Forward-looking statements involve known and unknown risks, uncertainties and other factors which are beyond Coro’s ability to predict or control and may cause Coro’s actual results, performance or achievements to be materially different from any of its future results, performance or achievements expressed or implied by forward-looking statements. These risks, uncertainties and other factors include, but are not limited to, the operation of the Nora Plant, copper price volatility, and changes in debt and equity markets. Such forward-looking statements are also based on a number of assumptions which may prove to be incorrect, changes in project parameters as plans continue to be evaluated, as well as those factors disclosed in the Company’s documents filed from time to time with the securities regulators in the Provinces of British Columbia, Alberta, Saskatchewan, Manitoba, Ontario, New Brunswick, Nova Scotia, Prince Edward Island and Newfoundland and Labrador.
Accordingly, readers should not place undue reliance on forward-looking statements. Coro undertakes no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be required by law.

Michael Philpot
(778) 240 2555 or (604) 682 5546
investor.info@coromining.com
www.coromining.cmoFrançois Perron
Renmark Financial Communications Inc
(416) 644-2020 or (514) 939-3989
fperron@renmarkfinancial.com
www.renmarkfinancial.com
The Conversation (0)
×