• Connect with us
    • Information
      • About Us
      • Contact Us
      • Careers
      • Partnerships
      • Advertise With Us
      • Authors
      • Browse Topics
      • Events
      • Disclaimer
      • Privacy Policy
    • NORTH AMERICA EDITION
      Australia
      North America
      World
    Login
    Investing News NetworkYour trusted source for investing success
    • NORTH AMERICA EDITION
      North America
      Australia
      World
    • My INN
    Videos
    Companies
    Press Releases
    Private Placements
    SUBSCRIBE
    • Reports & Guides
      • Market Outlook Reports
      • Investing Guides
    • Button
    Resource
    • Precious Metals
    • Battery Metals
    • Base Metals
    • Energy
    • Critical Metals
    Tech
    Life Science
    Gold Market
    Gold News
    Gold Stocks
    • Gold Market
    • Gold News
    • Gold Stocks

    Astral & Kootenay Reports Drill Results From Jumping Josephine Gold Project

    Investing News Network
    Nov. 04, 2010 08:07AM PST
    Gold Investing

    Kootenay Gold Inc. (CVE:KTN) & Astral Mining (CVE:AA) report final assay results from 2010 drilling at the Jumping Josephine (JJ) gold project, British Columbia, Canada.

    Kootenay Gold Inc. (TSXV:KTN) & Astral Mining (TSXV:AA) report final assay results from 2010 drilling at the Jumping Josephine (JJ) gold project, British Columbia, Canada.

    The press release is quoted as saying:

     A total of 5,054 metres of NQ and HQ diameter diamond core drilling was completed in 31 holes. Drilling has increased the known extent of the structure hosting the JJ Main gold discovery to 2.25km and identified an additional mineralized zone 300m northwest of JJ Main. The newly identified “Cedar Prospect” is blind at surface and is a successful application of geophysics and geochemistry.

    Click here to access the entire news release.

    Click here to access Kootenay’s company profile.

    kootenay gold inckootenay goldcanadatsxv:aatsxv:ktn
    The Conversation (0)

    Go Deeper

    AI Powered
    Sun Summit Drills 78.0 Meters of 3.72 g/t Gold Including 19.1 Meters of 7.50 g/t Gold at the JD Project, Toodoggone District, B.C.

    Sun Summit Drills 78.0 Meters of 3.72 g/t Gold Including 19.1 Meters of 7.50 g/t Gold at the JD Project, Toodoggone District, B.C.

    Goliath Resources

    Goliath Intersects 10.62 g/t Gold Over 22.82 Meters, Drilling Maintains 100% Hit Rate, 95% Of Holes Contain Visible Gold, Remains Wide Open, Surebet Discovery, Golddigger Property, Golden Triangle, B.C.

    Latest News

    Outlook Reports

    Resource
    • Precious Metals
      • Gold
      • Silver
    • Battery Metals
      • Lithium
      • Cobalt
      • Graphite
    • Energy
      • Uranium
      • Oil and Gas
    • Base Metals
      • Copper
      • Nickel
      • Zinc
    • Critical Metals
      • Rare Earths
    • Industrial Metals
    • Agriculture
    Tech
      • Artificial Intelligence
      • Cybersecurity
      • Gaming
      • Cleantech
      • Emerging Tech
    Life Science
      • Biotech
      • Cannabis
      • Psychedelics
      • Pharmaceuticals

    Featured Stocks

    More featured stocks

    Browse Companies

    Resource
    • Precious Metals
    • Battery Metals
    • Energy
    • Base Metals
    • Critical Metals
    Tech
    Life Science
    MARKETS
    COMMODITIES
    CURRENCIES
    ×