• Connect with us
  • Information
    • About Us
    • Contact Us
    • Careers
    • Partnerships
    • Advertise With Us
    • Authors
    • Browse Topics
    • Events
    • Disclaimer
    • Privacy Policy
  • NORTH AMERICA EDITION
    Australia
    North America
    World
Login
Investing News NetworkYour trusted source for investing success
  • NORTH AMERICA EDITION
    North America
    Australia
    World
  • My INN
Videos
Companies
Press Releases
Private Placements
SUBSCRIBE
  • Reports & Guides
    • Market Outlook Reports
    • Investing Guides
  • Button
Resource
  • Precious Metals
  • Battery Metals
  • Base Metals
  • Energy
  • Critical Minerals
Tech
Life Science
Battery Metals Market
Battery Metals News
Battery Metals Stocks
  • Battery Metals Market
  • Battery Metals News
  • Battery Metals Stocks

Gulf Manganese Provides Update on Smelter Land and Power Supply

Matthew Spizziri
Sep. 29, 2015 08:26AM PST
Battery Metals Investing

Gulf Manganese Corporation Limited (ASX:GMC) announced that the Company’s proposed 53 hectare block of land, in the industrial area of the Kupang Regency, West Timor, has been officially measured and issued with a Field Map reference catalogue number as the first step to receiving a Certificate of Title for Building Construction (Hak Guna Bangunan –HGB) from the Indonesian National Land Agency (BPN).

Gulf Manganese Corporation Limited (ASX:GMC) announced that the Company’s proposed 53 hectare block of land, in the industrial area of the Kupang Regency, West Timor, has been officially measured and issued with a Field Map reference catalogue number as the first step to receiving a Certificate of Title for Building Construction (Hak Guna Bangunan –HGB) from the Indonesian National Land Agency (BPN).
As quoted in the press release:

The issuing of a Certificate of Title will ensure security of tenure for PT Gulf Mangan Grup’s Land Lease Agreement for the duration of its 50 year lease period from the local land owners and authorises construction of the Timor Smelter.
Gulf is also pleased to advise shareholders that at a recent meeting with the Indonesian Government power company, PT PLN (Persero), it was confirmed that PLN will supply, on a user pay basis from mid 2016, 7 mega watts of power for the Company’s first furnace, which is due to come online the 4th quarter 2016. PLN will commission 2 new 16.5 mega watt power stations early next year with a further 60 mega watt power supply coming online during the second half of 2016.

Gulf Manganese Technical Director, Kevin Parker, said:

The issuing of a Field Map reference number and the confirmation from PLN of power supply, together with the recently issued Principle Licence, firmly establishes that the Company is on track to start building and operating next year. These three areas significantly de-risk the project and with several Regency permits and licences now required we are ready to move forward.

Connect with Gulf Manganese Corporation Limited (ASX:GMC) to receive an Investor Kit.
 
 

gulf manganese corporation limited gulf manganese corporation
The Conversation (0)

Go Deeper

AI Powered
Closeup of manganese ore from mines.

Manganese in Australia: Mines and Projects to Watch

Grid Metals Corp.

Grid Metals Corp.

Latest News

Outlook Reports

Resource
  • Precious Metals
    • Gold
    • Silver
  • Battery Metals
    • Lithium
    • Cobalt
    • Graphite
    • Electric Vehicles
  • Agriculture
  • Base Metals
    • Copper
    • Nickel
    • Zinc
  • Critical Metals
    • Rare Earths
  • Energy
    • Uranium
    • Oil and Gas
Tech
    • Artificial Intelligence
    • Cybersecurity
    • Robotics
    • Crypto
    • Cleantech
Life Science
    • Biotech
    • Cannabis
    • Pharmaceuticals

Featured Stocks

More featured stocks

Browse Companies

Resource
  • Precious Metals
  • Battery Metals
  • Energy
  • Base Metals
  • Critical Metals
Tech
Life Science
MARKETS
COMMODITIES
CURRENCIES