Osisko Metals Intersects 20.48 Percent Zinc-Lead Over 6.23 Metres at Pine Point
The company reported that drill hole EM-18-PP-132 intersected 3.54 percent zinc and 16.95 percent lead over 6.23 metres.
Osisko Metals (TSXV:OM) has announced assay results from 7 near-surface drill holes completed in the East Mill Zone at the Pine Point mining camp in the Northwest Territories.
The company reported that drill hole EM-18-PP-132 intersected 3.54 percent zinc and 16.95 percent lead over 6.23 metres and hole EM-18-PP-134 intersected 4.21 percent zinc and 7.31 percent lead over 5.62 metres.
As quoted in the press release:
While mineralization at ÂÂÂPine Point is predominantly rich in zinc, with a typical ratio of approximately 3 to 1 zinc to lead, these intersections are in an area of particularly anomalous high-grade lead similar to hole EM-18-PP-113 which graded 7.00 percent zinc and 18.00 percent lead.
Click here to read the full Osisko Metals (TSXV:OM) press release.