drill near me

Pan Global Drills 52.6m of 1.0% CuEq from near Surface at Escacena Project, Southern Spain

Pan Global Resources Inc. (TSXV: PGZ) (OTC Pink: PGNRF) (the "Company") is pleased to announce that drilling continues to expand the La Romana copper target at the Escacena Project with significant intercepts of near surface high-grade results. La Romana is located approximately 6km southwest of the former Aznalcollar open pit mine and approximately 15km west of the Las Cruces copper mine, in the Iberian Pyrite Belt, southern Spain.

Tim Moody, Pan Global President and CEO states: "The new drilling continues to expand the open pit target and the copper zone remains wide open in all directions. The new results include an exceptional near surface intercept of greater than 50m-thickness with high copper grades in the eastern strike extension, including an upper interval with high-grade supergene enrichment style chalcocite mineralization. The new results also extend the mineralization down-dip. The simple tabular geometry and moderate dip of the mineralization looks well suited to an open pit."

Results have been received for an additional four drill holes (LRD38, LRD39, LRD40 and LRD42) at the La Romana target, in the Escacena Project. Drilling is ongoing with assay results pending for an additional eighteen completed holes.

Highlights include:

  • 52.6m at 1.00% copper equivalent (CuEq) (0.76% Cu, 0.05% Sn, 3.8g/t Ag, 0.01g/t Au) from 42.4m in LRD40, including;

    • 26.6m at 1.39% CuEq (1.13% Cu, 0.05% Sn, 5.0g/t Ag, 0.01g/t Au) from 42.4m

  • 16m at 0.87% CuEq (0.60% Cu, 0.052% Sn, 4.6g/t Ag, 0.017g/t Au) from 38m in LRD39, including;

    • 10m at 1.25% CuEq (0.84% Cu, 0.07% Sn, 6.5g/t Ag, 0.02g/t Au, 0.013% Co) from 44m,

Drill results

The latest drill results are from four new holes in the Phase 4 drill program at the La Romana discovery. The drill program is testing extensions of the mineralization in all directions.

Drill holes LRD38 and LRD40 tested the eastern extensions of the near-surface copper mineralization. Holes LRD39 and LRD42 targeted down-dip extensions. Copper mineralization was intersected in all four holes, with exceptional results returned from LRD40.

Drill hole collar information is provided in Table 1 below. Assay results are summarized in Table 2. Drill hole locations are shown in Figure 1. Summary cross sections with holes LRD40 to LRD42 are provided in Figure 2. The drill holes were all inclined towards the south and all reported drill intervals are approximately true widths.

Table 1 Escacena Project, La Romana drill hole collar information (Total 1,333.2m)

Hole IDEasting1Northing1Azimuth (º)Dip (º)Depth (m)
LRD387369334152906180-60369.4
LRD397366834152627180-55182.1
LRD407367354152648180-55176
LRD427363814152794180-55263.2

 

1Coordinates are in ERTS89 datum UTM29N.

Table 2 - Escacena Project, La Romana drill results summary

HoleFrToIntCuEq1CuSnAgCoAu
PbZn
m%%ppmg/tppmg/tppmppm
LRD38233.30233.750.451.020.7929101030.04532706020
251.55251.750.21.581.121228.74380.104107251
256.35261.805.451.160.96333.52180.03619107
272.25272.750.51.171.08412.1850.01714105
275.45275.700.252.161.71737.04950.0885787
279.00279.300.31.121.0622.1880.030102327
   
LRD3936.0068.0032.000.560.383003.1750.011203544
38.0054.0016.000.870.605204.61020.017235515
44.0054.00101.250.847966.51330.024344685
46.3052.005.71.731.2010269.11680.029466842
   
LRD4042.4095.0052.601.000.764833.8820.009112618
42.4069.0026.601.391.134945.0860.010140496
40.0047.007.002.572.322508.51140.01170455
42.4047.004.603.823.4637012.21500.01550500
61.0069.008.001.921.4311207.11120.016108556
62.3066.404.102.972.25168410.61320.021103586
82.0087.205.201.110.806564.8980.00944709

 

LRD4224.3527.302.951.371.26573.5660.021186132
122.00137.0015.000.850.682724.0800.006229504
128.00137.009.001.211.002925.2910.007229522
132.00137.005.001.681.414117.01020.009259626

 

1Metal prices used: Copper US$6,200 per tonne, Silver USD22.50 per ounce, Gold US$1,500 per ounce, Cobalt US$32,800 per tonne and Tin US$18,000 per tonne. The copper equivalent (CuEq ) values are for exploration purposes only and include no assumptions for metal recovery.

The recent drill results at La Romana confirm that the high-grade near surface copper mineralization extends over a strike length of approximately 700m and remains open along strike, down-dip and up-dip. The primary mineralization includes mainly stock work, semi-massive sulphides and bands of massive sulphide, with chalcopyrite as the primary copper mineral and cassiterite as the primary tin mineral. The copper and tin mineralization is associated with elevated levels of silver, cobalt and gold. Supergene chalcocite is also evident in several recent drill holes and appears to increase towards the east and south.

LRD38 and LRD42 extend the copper mineralization down-dip coincident with down-hole EM conductor anomalies. The coincident geophysics and copper mineralization indicates the target is wide open and shows excellent potential to significantly expand.

Hole LRD39 extends the near-surface copper mineralization approx. 50m along strike to the east of hole LRD36 which reported 23m at 1.06% CuEq, including 11m at 1.74% CuEq. A leached/oxidised zone is present from approx. 11m to 30m depth with traces of native copper and red copper oxides, followed by a zone of low-grade supergene chalcocite from 30 to 39m. Significant results include:

  • 16m at 0.87% CuEq (0.60% Cu, 0.05% Sn, 4.6g/t Ag, 0.02g/t Au) from 38m down hole, including

    • 10m at 1.25% CuEq (0.84% Cu, 0.08% Sn, 6.5g/t Ag, 0.02g/t Au, 0.013% Co), including

      • 5.7m at 1.73% CuEq (1.20% Cu, 0.10% Sn, 9.1g/t Ag, 0.03g/t Au, 0.03% Co)

Hole LRD40 shows a significant thick zone of copper mineralization approx. 50m east and along strike from hole LRD39. The results also confirm a high-grade supergene-enriched chalcocite zone at the top of the copper interval. Significant results:

  • 52.6m at 1.00% CuEq (0.76% Cu, 0.05% Sn, 3.8g/t Ag) from 42.4m downhole, including

    • 26.6m at 1.39% CuEq (1.13% Cu, 0.05% Sn, 5g/t Ag), including

      • 7m at 2.57% CuEq (2.32% Cu, 0.03% Sn, 8.5g/t Ag, 0.01g/t Au, 0.011% Co) - supergene chalcocite, and

      • 8m at 1.92% CuEq (1.43% Cu, 0.11% Sn, 7.1g/t Ag, 0.02g/t Au, 0.011% Co)

    • 5.2m at 1.11% CuEq (0.80% Cu, 0.07% Sn, 4.8g/t Ag)

Drill hole LRD42 confirmed the continuation of the copper mineralization approx. 40m down-dip from LRD17 which intersected 24.4m at 1.03% CuEq. The hole is the northernmost intersection in the west of the target area. The mineralization remains open down-dip and along strike coincident with a large down-hole EM conductor and IP chargeability anomaly. Significant results:

  • 2.95m at 1.37% CuEq (1.26% Cu, 3.5g/t Ag, 0.021g/t Au) from 24.35m and

  • 15m at 0.85% CuEq (0.68% Cu, 0.03% Sn, 4.0g/t Ag) from 122m, including

    • 9m at 1.21% CuEq (1.01% Cu, 0.03% Sn, 5.2g/t Ag), including

      • 5m at 1.68% CuEq (1.41% Cu, 0.04% Sn, 7.0g/t Ag)

Drill hole LRD38 intersected 5.45m at 1.16% CuEq (0.96% Cu, 3.5g/t Ag, 0.04g/t Au, 0.022% Co) from 256.35m approx. 40m down-dip from previous hole LRD22, which intersected 6m at 2.44% CuEq, including an exceptionally high-grade massive chalcopyrite interval with 0.43m at 18.7% CuEq. The results indicate the copper zone continues down-dip, albeit with lower grades in this hole. The copper mineralization coincides with a large downhole EM conductor anomaly and indicates the mineralization remains open down-dip and along-strike to the east.

Assay results are pending for completed drill holes LRD43 to LRD59 and LRD61. Drill holes LRD60 and LRD62 are in progress. The Phase 4 drill program has been expanded to forty drill holes. Additional drill holes will also focus on testing for extensions of the thick zone of copper and tin mineralization intersected in hole LRD40 and high-grade supergene enriched copper mineralization.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/5190/84457_bd10368244ce2a26_001.jpg

Figure 1 - La Romana geophysics targets and drill hole locations with selected highlights. New drill hole results are highlighted in yellow.

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/5190/84457_bd10368244ce2a26_001full.jpg

  

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/5190/84457_bd10368244ce2a26_002.jpg

Figure 2 - Selected summary drill hole cross sections with new drill holes LRD40 (Section 736735 E) and LRD42 (Section 736385 E).

To view an enhanced version of Figure 2, please visit:
https://orders.newsfilecorp.com/files/5190/84457_bd10368244ce2a26_002full.jpg

QA/QC

Core size was HQ (63mm) and all samples were ½ core. Nominal sample size was 1m core length and ranged from 0.4 to 2m. Sample intervals were defined using geological contacts with the start and end of each sample physically marked on the core. Diamond blade core cutting and sampling was supervised at all times by Company staff. Duplicate samples of ¼ core were taken approximately every 30 samples and Certified Reference materials inserted every 25 samples in each batch.

All samples were crushed and split (method CRU-31, SPL22Y), and pulverized using (method PUL-31). Gold analysis was by 50gm Fire assay with ICP finish (method Au-ICP22) and multi element analysis was undertaken using a 4-acid digest with ICP AES finish (method ME-ICP61). Tin was analysed in selected intervals using Lithium borate fusion and ICP MS finish (method ME-MS81). Over grade base metal results were assayed using a 4-acid digest ICP AES (method OG-62). Over grade tin was determined using peroxide fusion with ICP finish (method Sn-ICP81x).

Qualified Person

Patrick Downey, a Director of Pan Global Resources and a qualified person as defined by National Instrument 43-101, has reviewed the scientific and technical information that forms the basis for this news release. Mr. Downey is not independent of the Company.

About Pan Global Resources

Pan Global Resources Inc. is actively engaged in base and precious metal exploration in southern Spain and is pursuing opportunities from exploration through to mine development. The Company is committed to operating safely and with respect to the communities and environment where we operate.

On behalf of the Board of Directors
www.panglobalresources.com.

FOR FURTHER INFORMATION PLEASE CONTACT:
info@panglobalresources.com

Statements which are not purely historical are forward-looking statements, including any statements regarding beliefs, plans, expectations or intentions regarding the future. It is important to note that actual outcomes and the Company's actual results could differ materially from those in such forward-looking statements. The Company believes that the expectations reflected in the forward-looking information included in this news release are reasonable but no assurance can be given that these expectations will prove to be correct and such forward-looking information should not be unduly relied upon. Risks and uncertainties include, but are not limited to, economic, competitive, governmental, environmental and technological factors that may affect the Company's operations, markets, products and prices. Readers should refer to the risk disclosures outlined in the Company's Management Discussion and Analysis of its audited financial statements filed with the British Columbia Securities Commission.

The forward-looking information contained in this news release is based on information available to the Company as of the date of this news release. Except as required under applicable securities legislation, the Company does not intend, and does not assume any obligation, to update this forward-looking information.

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/84457

News Provided by Newsfile via QuoteMedia

The Conversation (0)
S&P/TSX on ticker board.

FireFly Metals Gets Approval to Dual List on Toronto Stock Exchange

FireFly Metals (ASX:FFM,OTC Pink:MNXMF) announced plans to dual list on Wednesday (December 11) after receiving conditional approval to trade on the main board of the Toronto Stock Exchange (TSX).

It will use the symbol FFM, the same symbol it uses on the Australian Securities Exchange (ASX).

The copper- and gold-focused company is set to debut on the TSX on December 16.

Keep reading...Show less
Lobo Tiggre, copper bars.

Lobo Tiggre: Copper is My Highest-Confidence Trade for 2025 — Here's Why

Lobo Tiggre, CEO of IndependentSpeculator.com, gave the Investing News Network his updated thoughts on the US economy, as well as his outlook for gold, silver and uranium in 2025.

However, he said his highest-confidence trade for next year is copper.

"I think that it's easier to see — and highly likely to see — copper moving higher next year," Tiggre explained.

Keep reading...Show less
Large chunk of copper.

29Metals Shares Feasibility Study and Final Investment Decision for Gossan Valley Project

29Metals (ASX:29M) has announced a feasibility study and final investment decision for the Gossan Valley project at its Golden Grove volcanic-hosted massive sulphide mine in Western Australia.

The feasibility study is an update to the 2022 version of the document. It outlines production of 4,000 tonnes of copper and 20,000 tonnes of zinc annually at Gossan Valley over an initial mine life of seven years.

CEO James Palmer said the development of Gossan Valley is the "next logical development option" when it comes to moving forward at Golden Grove, which was first discovered in 1971.

Keep reading...Show less
Somerset Minerals Logo

Acquisition of High-Grade Copper Project Adjacent to White Cliff Minerals

Somerset Minerals Ltd (“Somerset” or the “Company”) (ASX:SMM) is pleased to advise that it has entered into a conditional agreement to acquire 100% of the issued capital of Sentinel Resources Pty Ltd (“Sentinel”), which, through its local subsidiary, holds the Coppermine Project (the “Project”) in Nunavut, Canada.

Importantly, the Coppermine Project hosts 1,055 km2 of the prospective Copper Creek Formation basalts, and is interpreted to include the strike extensions to White Cliff’s high priory targets of Vision, Stark, Thor and Rocket (Figure 2 & 3), with the prospectivity of the wider project area also supported by extensive surface sampling and historic exploration (Table 1). Importantly, Somerset holds the ground entirely around and along strike from White Cliff’s recently acquired Danvers prospect which contains a non-JORC or NI 43-101 resource of 4.16Mt @ 2.96% Cu.

Keep reading...Show less
US$100 bills.

Lundin Mining to Divest Neves-Corvo and Zinkgruvan Operations for US$1.52 Billion

Lundin Mining (TSX:LUN,OTC Pink:LUNMF) has entered a definitive agreement to sell its Neves-Corvo operation in Portugal and Zinkgruvan operation in Sweden to Boliden (STO:BOL) for up to US$1.52 billion.

The sale, announced by the company on Monday (December 9), will see Boliden acquire full ownership of Somincor, the company operating Neves-Corvo, as well as Zinkgruvan Mining Aktiebolag and its associated entities.

Lundin expects to receive upfront cash consideration of US$1.37 billion at closing, based on financial conditions as of August 31, 2024. Interest will accrue at 5 percent annually until the closing date.

Keep reading...Show less

Lundin Mining Announces Sale of Neves-Corvo and Zinkgruvan for Total Consideration of up to $1.52 Billion

Lundin Mining logo (CNW Group/Lundin Mining Corporation)

TSX: LUN) (Nasdaq Stockholm: LUMI) Lundin Mining Corporation ("Lundin Mining" or the "Company") announces today it has signed a definitive agreement to sell its Neves-Corvo operation in Portugal and Zinkgruvan operation in Sweden to Boliden AB (OM: BOL) ("Boliden") for up to $1.52 billion in total consideration (the "Transaction"). Unless otherwise stated, all numbers are presented in United States dollars.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×