Otis Gold Initiates 2016 Kilgore Drill Program

Gold Investing
Company News

Vancouver, B.C. – Otis Gold Corp. (TSXV:OOO) is pleased to announce that it has commenced a first phase 5,500-meter, 20-hole drill program at its flagship Kilgore Gold Project, Clark County, Idaho.

Vancouver, B.C. – Otis Gold Corp. (TSXV:OOO) is pleased to announce that it has commenced a first phase 5,500-meter, 20-hole drill program at its flagship Kilgore Gold Project, Clark County, Idaho.  This program will be funded from existing capital on hand and funds generated from the recently announced private placement (see News Release dated June 30, 2016 and July 13, 2016).  This program is expected to take between eight to ten weeks to complete and a second phase program is planned to follow shortly thereafter.
Most of the first phase drilling will be concentrated in the northwestern half of the Kilgore Deposit (see background note below), particularly in and around the “Crab Claw” west of the Mine Ridge Fault where 10 holes drilled last year encountered significant mineralization, with 6 of these holes bottoming in mineralization hosted by Tertiary sill material and Late Cretaceous Aspen Formation basement sedimentary rocks.  Noteworthy open-ended intercepts of significant thickness and grade from the area include 94.5 metres (m) of 4.21 grams per tonne (g/t) gold (Au) in hole 15 OKR-309, 50.3 m of 4.24 g/t Au in hole 15 OKR-308, 56.4 m of 2.05 g/t Au in hole 15 OKR-304, and 100.0 m of 0.57 g/t Au in hole 15 OKR-302 (see Otis Gold News Release dated January 8, 2016). These high average gold grades and extensive open-ended intercept thicknesses represent some of the strongest drilled to date at Kilgore by both Otis and prior operators.
This year’s drilling will focus on further extending these mineralized holes to depth with both reverse circulation (“RC”) and core drilling.  Additional holes will be placed throughout areas within the northwestern half of the deposit, including the Crab Claw, as infills, extensions, and offsets of known mineralization to complete cross-sectional panels  Finally, several holes will be placed on Aspen Formation-hosted higher-grade mineralized intercepts in the northern part of the deposit that remain open-ended at depth, but were never followed up on (30.4 m of 2.53 g/t Au in hole 10 OKC-210 and 30.5 m of 2.81 g/t Au in hole 10 OKC-220; see Otis Gold News Releases dated September 8, 2010 and February 11, 2011).
The RC drilling will be conducted by O’Keefe Drilling of Butte, Montana using an articulated Foremost 650 buggy drill rig. The rig is currently being mobilized from Nevada. The core drilling will be conducted by Timberline Drilling of Hayden Lake, Idaho employing an LF-90 drill rig. The drilling will be staged with the RC rig starting in advance of the core rig to allow for RC pre-collaring of the planned deeper core holes in the Crab Claw area. HQ-diameter-size core will then be obtained for geological and assay evaluation of the potentially mineralized deeper portions of the holes.
Connect with Otis Gold Corp. (TSXV:OOO) to receive an Investor Presentation.

The Conversation (0)
×