• Connect with us
    • Information
      • About Us
      • Contact Us
      • Careers
      • Partnerships
      • Advertise With Us
      • Authors
      • Browse Topics
      • Events
      • Disclaimer
      • Privacy Policy
    • WORLD EDITION
      Australia
      North America
      World
    Login
    Investing News NetworkYour trusted source for investing success
    • WORLD EDITION
      North America
      Australia
      World
    • My INN
    Videos
    Companies
    Press Releases
    Private Placements
    SUBSCRIBE
    • Reports & Guides
      • Market Outlook Reports
      • Investing Guides
    • Button
    Resource
    • Precious Metals
    • Battery Metals
    • Base Metals
    • Energy
    • Critical Minerals
    Tech
    Life Science
    Resource Market
    Resource News
    Resource Stocks
    • Resource Market
    • Resource News
    • Resource Stocks

    Highbank Resources Prepares for Work Program at Swamp Point North

    Investing News Network
    Jun. 18, 2015 11:28AM PST
    Resource Investing

    Highbank Resources Ltd. (TSXV:HBK) reported that two 350 Komatsu excavators and spare parts, fleeting barge loading system, diesel fuel, additional spare parts for other equipment, and general camp supplies are being deliverd from the Port of Prince Rupert to the fully commissioned Swamp Point North quarry and barge load out facility.

    Highbank Resources Ltd. (TSXV:HBK) reported that two 350 Komatsu excavators and spare parts, fleeting barge loading system, diesel fuel, additional spare parts for other equipment, and general camp supplies are being deliverd from the Port of Prince Rupert to the fully commissioned Swamp Point North quarry and barge load out facility.

    Victor N. Bryant, CEO/President reports: “A tug and barge will be leaving today from the Port of Prince Rupert to Swamp Point North (“SPN”), Highbank’s now fully commissioned aggregate quarry and barge load out facility. The barge load manifest lists two larger 350 Komatsu excavators and spare parts, fleeting barge loading system (winch and controls), diesel fuel, additional spare parts for other equipment, and general camp supplies to operate the site over the next few months.” “The Company will now commence a work program that will concentrate on further site development, as well as the production and stockpiling of various sizes of construction aggregates in preparation for shipping.”

    Click here to read the Highbank Resources Ltd. (TSXV:HBK) press release

    Click here to see the Highbank Resources Ltd. (TSXV:HBK) profile.

    highbank-resourcestsxv-hbkhighbank-resources-ltd
    The Conversation (0)

    Go Deeper

    AI Powered

    African Gold Group Announces High-Grade Drilling Results At Kobada Gold Project, Including 3.59g/t Gold Over 9.80m And Closes First Tranche Of Private Placement

    Highbank Resources Releases PEA for Swamp Point North Aggregate Project: NPV C$24.3 Million After Tax

    Latest News

    Outlook Reports

    Resource
    • Precious Metals
      • Gold
      • Silver
    • Battery Metals
      • Lithium
      • Cobalt
      • Graphite
      • Electric Vehicles
    • Agriculture
    • Base Metals
      • Copper
      • Nickel
      • Zinc
    • Critical Metals
      • Rare Earths
    • Energy
      • Uranium
      • Oil and Gas
    Tech
      • Artificial Intelligence
      • Cybersecurity
      • Robotics
      • Crypto
      • Cleantech
    Life Science
      • Biotech
      • Cannabis
      • Pharmaceuticals

    Featured Stocks

    More featured stocks

    Browse Companies

    Resource
    • Precious Metals
    • Battery Metals
    • Energy
    • Base Metals
    • Critical Metals
    Tech
    Life Science
    MARKETS
    COMMODITIES
    CURRENCIES