Blackbird Energy Announces Second Montney Horizontal Well Spud at Bigstone and Reduces Size of Private Placement

Company News

Blackbird Energy Inc. (TSXV:BBI) announced, further to its November 18, 2011 press release, that it has been informed by the operator, Donnybrook Energy Inc, that the DEI Bigstone Hz 15-32-60-22 W5M well (25% working interest to Blackbird) drilling operations commenced on November 25, 2011.

Blackbird Energy Inc. (TSXV:BBI) announced, further to its November 18, 2011 press release, that it has been informed by the operator, Donnybrook Energy Inc, that the DEI Bigstone Hz 15-32-60-22 W5M well (25% working interest to Blackbird) drilling operations commenced on November 25, 2011.

As quoted in the press release:

The drilling program calls for the well to be drilled to a total measured depth of approximately 5,150 meters from surface location 3-29-60-22W5, cased and prepared for completion and fracing operations (or abandoned) within a 35 day time frame. The DEI Bigstone Hz 15-32 well has a planned 2,500 metre +/- horizontal section. Blackbird has funded its obligations for the drilling of this well.

Click here to read the Blackbird Energy Inc. (TSXV:BBI) press release


Click here to see the Blackbird Energy Inc. (TSXV:BBI) profile.

The Conversation (0)
×