• Connect with us
  • Information
    • About Us
    • Contact Us
    • Careers
    • Partnerships
    • Advertise With Us
    • Authors
    • Browse Topics
    • Events
    • Disclaimer
    • Privacy Policy
  • NORTH AMERICA EDITION
    Australia
    North America
    World
Login
Investing News NetworkYour trusted source for investing success
  • NORTH AMERICA EDITION
    North America
    Australia
    World
  • My INN
Videos
Companies
Press Releases
Private Placements
SUBSCRIBE
  • Reports & Guides
    • Market Outlook Reports
    • Investing Guides
  • Button
Resource
  • Precious Metals
  • Battery Metals
  • Base Metals
  • Energy
  • Critical Minerals
Tech
Life Science
Battery Metals Market
Battery Metals News
Battery Metals Stocks
  • Battery Metals Market
  • Battery Metals News
  • Battery Metals Stocks

Flinders Provides Update on Testing at Woxna

Charlotte McLeod
May. 28, 2013 10:48AM PST
Battery Metals Investing

Flinders Resources Ltd. (TSXV:FDR) announced an update on the metallurgical test programs being conducted on graphite-bearing rock from its Sweden-based Woxna mine, commenting that the flake size distributions from the current results and historical production show potential for improved flake size distribution.

Flinders Resources Ltd. (TSXV:FDR) announced an update on the metallurgical test programs being conducted on graphite-bearing rock from its Sweden-based Woxna mine, commenting that the flake size distributions from the current results and historical production show potential for improved flake size distribution.

The following table shows flake size distributions for both the current test results and historical production:

Graphite Flake Size 
(µm)
Test Results
(% by weight)
Historic Production
(% by weight)
+250 µm 23 –
+180-250 µm 27 32
+100-180 µm 35 32
-100 µm 15 36

Further cleaning test work is currently underway to maximise graphite purity while maintaining a high flake size distribution.  The metallurgical test program concludes with locked cycle tests of the proposed new process flow sheet. This work is expected to be completed in early June.

Once the final results are available from the metallurgical test work, all of the components will be available to complete a preliminary economic assessment of resuming production at the Woxna graphite mine.

Click here to read the full Flinders Resources Ltd. (TSXV:FDR) press release.

flinders-resources graphite-mine graphite-flake tsxv-fdr
The Conversation (0)

Go Deeper

AI Powered
Metals Australia (ASX:MLS)

Metals Australia

International Graphite (ASX:IG6)

International Graphite

Latest News

Outlook Reports

Resource
  • Precious Metals
    • Gold
    • Silver
  • Battery Metals
    • Lithium
    • Cobalt
    • Graphite
    • Electric Vehicles
  • Agriculture
  • Base Metals
    • Copper
    • Nickel
    • Zinc
  • Critical Metals
    • Rare Earths
  • Energy
    • Uranium
    • Oil and Gas
Tech
    • Artificial Intelligence
    • Cybersecurity
    • Robotics
    • Crypto
    • Cleantech
Life Science
    • Biotech
    • Cannabis
    • Pharmaceuticals

Featured Stocks

More featured stocks

Browse Companies

Resource
  • Precious Metals
  • Battery Metals
  • Energy
  • Base Metals
  • Critical Metals
Tech
Life Science
MARKETS
COMMODITIES
CURRENCIES