• Connect with us
  • Information
    • About Us
    • Contact Us
    • Careers
    • Partnerships
    • Advertise With Us
    • Authors
    • Browse Topics
    • Events
    • Disclaimer
    • Privacy Policy
  • NORTH AMERICA EDITION
    Australia
    North America
    World
Login
Investing News NetworkYour trusted source for investing success
  • NORTH AMERICA EDITION
    North America
    Australia
    World
  • My INN
Videos
Companies
Press Releases
Private Placements
SUBSCRIBE
  • Reports & Guides
    • Market Outlook Reports
    • Investing Guides
  • Button
Resource
  • Precious Metals
  • Battery Metals
  • Base Metals
  • Energy
  • Critical Minerals
Tech
Life Science
Potash Market
Potash News
Potash Stocks
  • Potash Market
  • Potash News
  • Potash Stocks

Arianne Resources Inc.: Lac-a-Paul Phosphate Project Prefeasibility Study Confirms Viability of Long-life Phosphate Rock Mine

Investing News Network
Nov. 08, 2011 09:17AM PST
Potash Investing

Ressources d’Arianne Inc. (TSXV:DAN) announced the initial findings of the Lac-à-Paul phosphate prefeasibility study conducted by Met-Chem Canada Inc.

Ressources d’Arianne Inc. (TSXV:DAN) announced the initial findings of the Lac-à-Paul phosphate prefeasibility study conducted by Met-Chem Canada Inc.

As quoted in the press release:

Highlights of the Prefeasibility Study ($US):

  • Measured & Indicated resources quadruple to 348 million tonnes of 6.50% P2O5
  • Additional Inferred resources of 114 million tonnes at 5.46% P2O5 are not included in the Study
  • Combined Paul and Manouane proven and probable Mineral Reserves now total 307 Mt at an average grade of 6.59% P2O5 at an average stripping ratio of 0.83 (Cut-off grade of 2.43% P2O5)
  • Annual production to average 2 million tonnes of 38% P2O5 apatite concentrate
  • 25 year mine life at 33,000 tonnes/day with average mill recovery of 89%
  • Average price of $175/tonne (comparable to 85 BPL FOB Russia which is currently sold at $223/tonne)
  • Cash operating cost $98/tonne concentrate (FOB rail Dolbeau-Mistassini))
  • Total Direct CAPEX Cost: $454 M
  • Indirect CAPEX Cost: $121 M and Contingency: $74 M
  • Total Initial CAPEX: $649 M
  • Pre-tax IRR: 19.2%
  • Pre-tax NPV 8%: $684 M
  • Pre-tax Capital payback: 4.7 years

Ressources d’Arianne Inc. CEO, Bernard Lapointe, said:

“The all-in cost (CAPEX plus OPEX) estimate of $118 per tonne demonstrates that Lac a Paul is a world-class phosphate rock project with robust economics. The Study also confirms that, due to the significant increase in ore resources, a 3 million tonne/year P2O5 concentrate operation could further enhance project economics by as much as 50%. “

Click here to read the Ressources d’Arianne Inc. (TSXV:DAN) press release


Click here to see the Ressources d’Arianne Inc. (TSXV:DAN) profile.

mine-life tsxv-dan canada russia prefeasibility-study
The Conversation (0)

Go Deeper

AI Powered
Latin Resources Logo

Thickest Intersection Recorded to Date with 21.1M @ 1.2% Li2

African Gold Group Announces High-Grade Drilling Results At Kobada Gold Project, Including 3.59g/t Gold Over 9.80m And Closes First Tranche Of Private Placement

Latest News

Outlook Reports

Resource
  • Precious Metals
    • Gold
    • Silver
  • Battery Metals
    • Lithium
    • Cobalt
    • Graphite
    • Electric Vehicles
  • Agriculture
  • Base Metals
    • Copper
    • Nickel
    • Zinc
  • Critical Metals
    • Rare Earths
  • Energy
    • Uranium
    • Oil and Gas
Tech
    • Artificial Intelligence
    • Cybersecurity
    • Robotics
    • Crypto
    • Cleantech
Life Science
    • Biotech
    • Cannabis
    • Pharmaceuticals

Featured Stocks

More featured stocks

Browse Companies

Resource
  • Precious Metals
  • Battery Metals
  • Energy
  • Base Metals
  • Critical Metals
Tech
Life Science
MARKETS
COMMODITIES
CURRENCIES