June 2022 Quarterly Activities Report

Valor Resources Limited (Valor) or (the Company) (ASX: VAL) is pleased to provide its activities report for the quarter ended 30 June 2022. Exploration activities in both Canada and Peru uncovered significant mineralisation in Uranium and Copper/Silver.


HIGHLIGHTS

CANADIAN URANIUM – ATHABASCA BASIN:

  • Surprise Creek Project historical data review highlights high grade uranium and copper targets including drilling results of 2.1m @ 4.37% U3O8.
    • Historical drilling on the Surprise Creek Fault target highlighted by 2.1m @ 4.37% U3O8 from 57m (VT20) including 0.9m @ 7.5% U3O8
    • Other significant historical drilling results at Surprise Creek Fault target include 1.5m @ 0.1% U3O8 (VT13), 0.43m @ 0.49% U3O8 (VT05) and 0.15m @ 0.83% U3O8 (VT02)
    • Surprise Creek Fault target comprises a uranium geochemical anomaly (>25ppm U) in soils over 500m in strike length and including rock chips up to 6.37% U3O8, associated with a north-northwest striking fault system
    • Uranium soil geochemical anomaly was partially drill tested and remains open in several directions
    • Data review also highlights several copper targets in the southwest of the project area with soil and rock chip anomalies (>150ppm Cu) over a strike length of 1.5km and open to the north and south
    • Copper target areas include several rock chip samples >0.25% Cu, up to 5.9% Cu and soil samples up to 3,300ppm Cu
    • No modern exploration for uranium or copper in the project area for over 20 years
  • Highly prospective Uranium targets identified at Cluff Lake Project near Historical Uranium Mine
    • Seven high-priority targets defined based on historical data and geophysical interpretation
    • Highlighted by surface geochemical anomalies up to 0.15% U3O8
    • Airborne gravity gradiometry (AGG) survey completed to identify further targets – 2,755 line kms at 150m line spacing
    • Project located 7km east of Orano’s Cluff Lake Mine which produced 62.5 Mlbs @ 0.92% U3O8
    • Potential for both Athabasca basement-hosted and unconformity-style uranium deposits
  • Extensive airborne gravity survey completed at Hook Lake and Hidden Bay
    • Airborne Gravity Gradiometry (AGG) Survey has been completed on the Hook Lake and Hidden Bay Uranium Projects
    • Total 2,080 line kilometres at 150m line spacing at Hook Lake and 416 line kms at 150m spacing at Hidden Bay

PERUVIAN COPPER SILVER:

  • Extensive Copper assays highlight Ichucollo as significant new drill target
    • Channel sample results from Ichucollo target at the Picha Project include:
      • 12m @ 1.1% Cu and 5.3g/t Ag;
      • 30m @ 0.79% Cu and 7.56g/t Ag;
      • 16m @ 0.60% Cu and 9.1g/t Ag; and
      • 18m long zone of stratabound or “manto-type” mineralisation averaging 1.45% Cu
    • Channel sampling results highlight an area over 350m in extent with significant copper mineralisation and open to the north and south
    • Evidence of intrusive activity in the Ichucollo area in the form of magmatic breccias with intrusive clasts – suggests proximity to porphyry body
    • Ground geophysics comprising IP/Resistivity survey planned for Ichucollo in August and further surface sampling and mapping
    • High grade rock chip sample of 6.78% Cu and 25g/t Ag indicates a potential new target area 4.5km west of Cobremani
  • Rock chip and channel samples confirm two new targets
    • Occsani Target with channel samples (0.5m x 0.2m) up to 2.14% Cu and rock chip samples up to 2.48% Cu, 92g/t Ag and 200ppm Mo.
    • Chullunquiani Target with channel samples (0.5m x 0.2m) up to 5.57% Pb and 5.33% Zn.
  • Further channel samples at the Huancune target returned assays of 2.82%, 2.03% and 1.72% Cu
  • New tenure applied for comprising 6,000 hectares (60km2) – Charaque Project
    • Charaque Project – located 30km northeast of Picha Project, along a regional northwest-southeast geological trend hosting several deposits and prospects
      • Huallatani Target with a channel sample (0.3m x 0.2m) of 538g/t Ag and 19.5% Pb and dump samples, from historical artisanal mining, up to 43.2g/t Ag and 7.74% Pb
      • Arco Target with channel samples (2.0m x 0.2m) up to 929g/t Ag and another up to 0.98% Cu, with five channel samples returning assays greater than 60g/t Ag.

Figure 1: Picha Project Conceptual Exploration model

The June Quarter saw the completion of historical data reviews at the Cluff Lake and Surprise Creek Projects which has highlighted a number of significant drill targets that are currently being followed up with a field reconnaissance program. During the quarter, work also advanced on the completion of historical data reviews at the Hidden Bay, Lorado, Smitty, Pendleton Lake and MacPherson Lake projects which will be finalised and released to the market in the September Quarter.


Click here for the full ASX Release

This article includes content from Valor Resources Limited , licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.


VAL:AU
The Conversation (0)
Firetail Resources Limited

Shareholders Approve Firetail Resources’ Acquisition of Peruvian Assets

Firetail received strong shareholder approval with 88 percent of votes in favor of the transaction

Firetail Resources (ASX:FTL) shareholders have approved the acquisition of up to 80 percent interest in Valor Resources’ (ASX:VAL) Picha and Charaque projects in Peru, according to an article published by The West Australian.

Keep reading...Show less

Laramide Releases Final Results from 2024 Drill Campaign at Westmoreland; Updated Resource Estimate on Track for Q1 Delivery

Highlights:

  • Laramide's largest program ever with 106 holes completed
  • Multiple targets tested including infill and extensional drilling of known zones and greenfield targets in both Queensland and the Northern Territory
  • Consistent observation from results demonstrates the potential and scope for broad mineralisation styles enveloping narrow high-grade intercepts
  • The consistency and scalability underscore economic viability and reinforce Westmoreland's position as a potentially important future source of global uranium supply
  • Resource expansion potential is largely wide open with many follow-up targets warranting large-scale future exploration campaigns

Laramide Resources Ltd. ( "Laramide" or the "Company" ) (TSX: LAM) (ASX: LAM) (OTCQX: LMRXF), a uranium mine development and exploration company with globally significant projects in the United States Australia and Kazakhstan is pleased to report a summary of the 2024 drilling campaign completed at the Westmoreland Uranium Project in Queensland, Australia ( "Westmoreland" ). The 2024 drill program has concluded with successful results confirming the high-quality of the Westmoreland uranium deposit and supporting a Global Mineral Resource Estimate Update expected by the end of Q1 2025.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Cameco Announces 2024 Results; Strong Performance Across All Segments; Westinghouse Distribution; Strategy Centered on Marketing, Production, Financial Discipline Expected to Generate Full-Cycle Value; Positive Outlook for Nuclear Energy

Cameco( TSX: CCO; NYSE: CCJ) today reported its consolidated financial and operating results for the fourth quarter and year ended December 31, 2024, in accordance with International Financial Reporting Standards (IFRS).

�Our 2024 full-year financial performance benefitted from strong fourth quarter results delivered by our uranium and Westinghouse segments," said Tim Gitzel, Cameco's president and CEO. "Although both net earnings and adjusted net earnings in 2024 were lower than in 2023 primarily due to the impact of purchase accounting related to the Westinghouse acquisition, our other key financial metrics improved significantly. We expect our strong financial performance to continue in 2025, driven by the supportive market conditions we are seeing throughout the fuel cycle and across the nuclear sector, and through the continued benefits flowing from our investment in Westinghouse. Over the coming year, we expect to continue investing to help ensure reliability and sustainability of our existing operations, while positioning ourselves for future production flexibility and growth growth that will be strategic, deliberate, disciplined, and with a focus on generating full-cycle value.

News Provided by Business Wire via QuoteMedia

Keep reading...Show less
High-Grade Mineralisation Identified at North Sweden Project

High-Grade Mineralisation Identified at North Sweden Project

Basin Energy (BSN:AU) has announced High-Grade Mineralisation Identified at North Sweden Project

Download the PDF here.

Global Atomic Provides Corporate Update

Global Atomic Corporation (" Global Atomic " or the " Company ") (TSX: GLO) (OTCQX: GLATF) (FRANKFURT: G12) is pleased to provide an update on recent activities at the Company and the Dasa Uranium Project in the Republic of Niger .

Global Atomic Corporation Logo (CNW Group/Global Atomic Corporation)

NIGER UPDATE

At the African Mining Indaba Conference held in Cape Town last week, the Company held several important meetings with Niger's Mines Minister Abarchi, who was present at the largest mining conference in Africa , promoting his Country to attract potential investors interested in the mining sector. The Minister emphasized the Government's strong support for Global Atomic and the Dasa Project, and confirmed his government has no intention to nationalize the Dasa Project.

In various meetings attended by Minister Abarchi at the Conference, he stated that Niger welcomes and encourages investment by foreign mining companies specifically including those from Canada , the United States and Australia.  Further, at the end of last week the Niger government announced plans to hold a major conference in mid-February to establish a process that will govern the transition to a democratic election.

The Company held additional meetings in Cape Town , including with new groups interested in financing the Dasa Project, as well as suppliers and contractors who are currently working with Global Atomic and SOMIDA.

PROJECT DEVELOPMENT

The advancement of the Dasa underground has progressed on the first two levels along the footwall of the ore body.  Five-meter diameter ventilation raises have been completed and commissioned enabling continued underground development while maintaining safe working conditions and efficiency.

Plant construction is proceeding on schedule with earthworks nearing completion and civil works underway and the concrete batch plant now under construction.  Large pieces of processing equipment such as the SAG mill shell, crusher and acid plant are now on site.  The camp that will house the plant construction crew is well underway with a large percentage of housing now ready for occupation.

FINANCING

Since the inauguration of President Trump in the United States of America , the market reaction has been that debt funding for the Dasa Project is unlikely to come from the USA .  However, these discussions continue as well as the advancement of the Joint Venture final documentation. It is important to remember that the Company has entered into off-take agreements for 8.8 million pounds U 3 O 8 over the first 7 years of the Mine; 90% of which has been sold to US utilities.  As a result of the many successful meetings at the Indaba Conference, new parties have indicated a willingness to participate in the final funding solution for Dasa. Management is confident that these initiatives will continue to progress, and we reiterate our belief that prior to the end of Q1, 2025, further clarity can be shared with the market.

Stephen Roman , President & CEO of Global Atomic, stated, " By advancing the development of the mine, processing plant and infrastructure, we have significantly moved the Dasa Project closer to production while continuously adding to the intrinsic value of the Dasa Project.  This is the basis of appraisal for all our financing discussions and not the current value of our shares."

A recent video of our progress in Niger is available at https://www.youtube.com/watch?v=ITl8r104-MA .

About Global Atomic

Global Atomic Corporation ( www.globalatomiccorp.com ) is a publicly listed company that provides a unique combination of high-grade uranium mine development and cash-flowing zinc concentrate production.

The Company's Uranium Division is currently developing the fully permitted, large, high grade Dasa Deposit, discovered in 2010 by Global Atomic geologists through grassroots field exploration.  The "First Blast Ceremony" occurred on November 5, 2022 , and commissioning of the processing plant is scheduled for Q1, 2026.  Global Atomic has also identified 3 additional uranium deposits in Niger that can be advanced with further assessment work.

Global Atomic's Base Metals Division holds a 49% interest in the Befesa Silvermet Turkey, S.L. (BST) Joint Venture, which operates a modern zinc recycling plant, located in Iskenderun, Türkiye. The plant recovers zinc from Electric Arc Furnace Dust (EAFD) to produce a high-grade zinc oxide concentrate which is sold to zinc smelters around the world. The Company's joint venture partner, Befesa Zinc S.A.U. (Befesa) holds a 51% interest in and is the operator of the BST Joint Venture.  Befesa is a market leader in EAFD recycling, with approximately 50% of the European EAFD market and facilities located throughout Europe , Asia and the United States of America .

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS:

The information in this release may contain forward-looking information under applicable securities laws.  Forward-looking information includes, but is not limited to, statements with respect to completion of any financings; Global Atomics' development potential and timetable of its operations, development and exploration assets; Global Atomics' ability to raise additional funds necessary; the future price of uranium; the estimation of mineral reserves and resources; conclusions of economic evaluation; the realization of mineral reserve estimates; the timing and amount of estimated future production, development and exploration; cost of future activities; capital and operating expenditures; success of exploration activities; mining or processing issues; currency exchange rates; government regulation of mining operations; and environmental and permitting risks.   Generally, forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "is expected", "estimates", variations of such words and phrases or statements that certain actions, events or results "could", "would", "might", "will be taken", "will begin", "will include", "are expected", "occur" or "be achieved".  All information contained in this news release, other than statements of current or historical fact, is forward-looking information.   Statements of forward-looking information are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Global Atomic to be materially different from those expressed or implied by such forward-looking statements, including but not limited to those risks described in the annual information form of Global Atomic and in its public documents filed on SEDAR from time to time.

Forward-looking statements are based on the opinions and estimates of management at the date such statements are made.  Although management of Global Atomic has attempted to identify important factors that could cause actual results to be materially different from those forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended.  There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.  Accordingly, readers should not place undue reliance upon forward-looking statements.  Global Atomic does not undertake to update any forward-looking statements, except in accordance with applicable securities law.  Readers should also review the risks and uncertainties sections of Global Atomics' annual and interim MD&As.

The Toronto Stock Exchange has not reviewed and does not accept responsibility for the adequacy and accuracy of this news release.

Global Atomic - TSX 30 - OTX 50 (CNW Group/Global Atomic Corporation)

SOURCE Global Atomic Corporation

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/February2025/12/c0271.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Global Atomic Provides Corporate Update

Global Atomic Corporation (" Global Atomic " or the " Company ") (TSX: GLO) (OTCQX: GLATF) (FRANKFURT: G12) is pleased to provide an update on recent activities at the Company and the Dasa Uranium Project in the Republic of Niger .

Global Atomic Corporation Logo (CNW Group/Global Atomic Corporation)

NIGER UPDATE

At the African Mining Indaba Conference held in Cape Town last week, the Company held several important meetings with Niger's Mines Minister Abarchi, who was present at the largest mining conference in Africa , promoting his Country to attract potential investors interested in the mining sector. The Minister emphasized the Government's strong support for Global Atomic and the Dasa Project, and confirmed his government has no intention to nationalize the Dasa Project.

In various meetings attended by Minister Abarchi at the Conference, he stated that Niger welcomes and encourages investment by foreign mining companies specifically including those from Canada , the United States and Australia.  Further, at the end of last week the Niger government announced plans to hold a major conference in mid-February to establish a process that will govern the transition to a democratic election.

The Company held additional meetings in Cape Town , including with new groups interested in financing the Dasa Project, as well as suppliers and contractors who are currently working with Global Atomic and SOMIDA.

PROJECT DEVELOPMENT

The advancement of the Dasa underground has progressed on the first two levels along the footwall of the ore body.  Five-meter diameter ventilation raises have been completed and commissioned enabling continued underground development while maintaining safe working conditions and efficiency.

Plant construction is proceeding on schedule with earthworks nearing completion and civil works underway and the concrete batch plant now under construction.  Large pieces of processing equipment such as the SAG mill shell, crusher and acid plant are now on site.  The camp that will house the plant construction crew is well underway with a large percentage of housing now ready for occupation.

FINANCING

Since the inauguration of President Trump in the United States of America , the market reaction has been that debt funding for the Dasa Project is unlikely to come from the USA .  However, these discussions continue as well as the advancement of the Joint Venture final documentation. It is important to remember that the Company has entered into off-take agreements for 8.8 million pounds U 3 O 8 over the first 7 years of the Mine; 90% of which has been sold to US utilities.  As a result of the many successful meetings at the Indaba Conference, new parties have indicated a willingness to participate in the final funding solution for Dasa. Management is confident that these initiatives will continue to progress, and we reiterate our belief that prior to the end of Q1, 2025, further clarity can be shared with the market.

Stephen Roman , President & CEO of Global Atomic, stated, " By advancing the development of the mine, processing plant and infrastructure, we have significantly moved the Dasa Project closer to production while continuously adding to the intrinsic value of the Dasa Project.  This is the basis of appraisal for all our financing discussions and not the current value of our shares."

A recent video of our progress in Niger is available at https://www.youtube.com/watch?v=ITl8r104-MA .

About Global Atomic

Global Atomic Corporation ( www.globalatomiccorp.com ) is a publicly listed company that provides a unique combination of high-grade uranium mine development and cash-flowing zinc concentrate production.

The Company's Uranium Division is currently developing the fully permitted, large, high grade Dasa Deposit, discovered in 2010 by Global Atomic geologists through grassroots field exploration.  The "First Blast Ceremony" occurred on November 5, 2022 , and commissioning of the processing plant is scheduled for Q1, 2026.  Global Atomic has also identified 3 additional uranium deposits in Niger that can be advanced with further assessment work.

Global Atomic's Base Metals Division holds a 49% interest in the Befesa Silvermet Turkey, S.L. (BST) Joint Venture, which operates a modern zinc recycling plant, located in Iskenderun, Türkiye. The plant recovers zinc from Electric Arc Furnace Dust (EAFD) to produce a high-grade zinc oxide concentrate which is sold to zinc smelters around the world. The Company's joint venture partner, Befesa Zinc S.A.U. (Befesa) holds a 51% interest in and is the operator of the BST Joint Venture.  Befesa is a market leader in EAFD recycling, with approximately 50% of the European EAFD market and facilities located throughout Europe , Asia and the United States of America .

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS:

The information in this release may contain forward-looking information under applicable securities laws.  Forward-looking information includes, but is not limited to, statements with respect to completion of any financings; Global Atomics' development potential and timetable of its operations, development and exploration assets; Global Atomics' ability to raise additional funds necessary; the future price of uranium; the estimation of mineral reserves and resources; conclusions of economic evaluation; the realization of mineral reserve estimates; the timing and amount of estimated future production, development and exploration; cost of future activities; capital and operating expenditures; success of exploration activities; mining or processing issues; currency exchange rates; government regulation of mining operations; and environmental and permitting risks.   Generally, forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "is expected", "estimates", variations of such words and phrases or statements that certain actions, events or results "could", "would", "might", "will be taken", "will begin", "will include", "are expected", "occur" or "be achieved".  All information contained in this news release, other than statements of current or historical fact, is forward-looking information.   Statements of forward-looking information are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Global Atomic to be materially different from those expressed or implied by such forward-looking statements, including but not limited to those risks described in the annual information form of Global Atomic and in its public documents filed on SEDAR from time to time.

Forward-looking statements are based on the opinions and estimates of management at the date such statements are made.  Although management of Global Atomic has attempted to identify important factors that could cause actual results to be materially different from those forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended.  There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.  Accordingly, readers should not place undue reliance upon forward-looking statements.  Global Atomic does not undertake to update any forward-looking statements, except in accordance with applicable securities law.  Readers should also review the risks and uncertainties sections of Global Atomics' annual and interim MD&As.

The Toronto Stock Exchange has not reviewed and does not accept responsibility for the adequacy and accuracy of this news release.

Global Atomic - TSX 30 - OTX 50 (CNW Group/Global Atomic Corporation)

SOURCE Global Atomic Corporation

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/February2025/12/c0271.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Positive Uranium Leach Test Results at Lo Herma

Positive Uranium Leach Test Results at Lo Herma

GTI Energy (GTR:AU) has announced Positive Uranium Leach Test Results at Lo Herma

Download the PDF here.

Latest Press Releases

Related News

×