Ero Copper Reports Second Quarter 2022 Operating and Financial Results Including Record Quarterly Copper and Gold Production

 

  (all amounts in US dollars, unless otherwise noted)  

 

Ero Copper Corp. (TSX: ERO, NYSE: ERO) ("Ero" or the "Company") is pleased to announce its operating and financial results for the three and six months ended June 30, 2022. Management will host a conference call tomorrow, Wednesday, August 3, 2022, at 11:30 a.m. Eastern time to discuss the results. Dial-in details for the call can be found near the end of this press release.

 

  HIGHLIGHTS  

 
  • Record quarterly copper production of 12,734 tonnes at C1 cash costs (*) of $1.24 per pound of copper produced;
  •  
  • Record quarterly gold production of 11,122 ounces at C1 cash costs (*) and All-in Sustaining Costs ("AISC") (*) of $643 and $1,169, respectively, per ounce of gold produced;
  •  
  • Adjusted EBITDA (*) of $55.8 million and adjusted net income attributable to owners of the Company (*) of $24.4 million ($0.27 per share on a diluted basis);
  •  
  • Financial results during the period were impacted by operational challenges at the Company's primary domestic customer that resulted in a higher allocation of sales to the international market. The timing of sales to, and longer quotational periods with, international customers, combined with a weakening copper price just prior to quarter- end, resulted in a reduction to revenue of approximately $13.0 million (see "Second Quarter Review" for more information);
  •  
  • Quarterly cash flows from operations of $22.4 million also reflect an increase in accounts receivable of $18.9 million due to the timing of concentrate shipments and longer payment terms with international customers. Absent this increase in accounts receivable, cash flows from operations during the quarter would have been over $40.0 million;
  •  
  • Available liquidity at quarter-end was $504.9 million, including cash and cash equivalents of $329.3 million, short-term investments of $100.6 million, and $75.0 million of undrawn availability under the Company's senior revolving credit facility;
  •  
  • Key organic growth projects advancing on schedule and on budget:
    • At the Tucumã Project (formerly referred to as the Boa Esperança Project), approximately 22% of planned capital expenditures were under contract as of August 1, 2022, with another 8% in the final phases of contracting. Capital commitments contracted and in the final phases of negotiation are within 6% of Feasibility Study estimates;
    •  
    • At the Caraíba Operations (formerly referred to as the MCSA Mining Complex), equipment packages and supply contracts totaling approximately 25% of planned capital expenditures for the new external shaft have been finalized as of August 1, 2022 at 10% below project capital estimates. The shaft sinking contract, the largest contributor to the project's total capital spend, is in the final negotiation phase. Upon execution of the sinking contract, capital secured under contract for the project is expected to be approximately 70% and align with the total project capital estimate; and,
    •  
    • In addition to ongoing construction activities, the Company is developing a sustainability strategy for the Tucumã Project and surrounding community. To date, approximately $1.0 million has been earmarked for projects designed to mitigate the environmental impact of project development and provide support for the local community.
    •  
  •  
  • Reaffirming full-year production guidance, lowering consolidated 2022 capital expenditure guidance, and raising operating cost guidance for the year:
    • Full-year copper production expected to be at the high-end of the 43,000 to 46,000 tonne guidance range;
    •  
    • Full-year gold production guidance range of 39,000 to 42,000 ounces reaffirmed;
    •  
    • Full-year consolidated capital expenditure guidance lowered by over $20 million, from $330-$375 million to $308-$354 million, as a result of capital replanning efforts resulting in deferrals at the Company's Caraíba Operations. The deferral of this capital spend is not expected to impact timelines for key growth projects;
    •  
    • Full-year C1 cash cost guidance has been increased for the Caraíba Operations to $1.20 to $1.35 (previously $1.05 to $1.15) per pound of copper produced to reflect elevated international concentrate sales, which are expected to continue through the remainder of the year, as well as the impact of inflation in the cost of key consumables and a strong BRL versus the US dollar in H1 2022; and,
    •  
    • Full-year cost guidance ranges for the Xavantina Operations (formerly referred to as the NX Gold Mine) have be updated to reflect the aforementioned impact of inflation and BRL strength in H1 2022:
      • C1 cash cost guidance revised to $600 to $700 (previously $500 to $600) per ounce of gold produced; and,
      •  
      • AISC guidance revised to $1,000 to $1,100 (previously $925 to $1,025) per ounce of gold produced.
      •  
    •  
  •  

  "Our second quarter delivered record operational performance across our assets and saw the successful execution of important milestones critical to our growth strategy," said David Strang, Chief Executive Officer. "Underpinning our record quarterly production results were new monthly records set for production rates, development rates, asset efficiency and availability, among others. Following a challenging first quarter operating environment, I want to congratulate our on-site teams for setting new high watermarks that showcase the capabilities of our assets and people.  

 

  "Across our key growth projects, construction and development activities are progressing on   schedule and well within contingency levels at this time. Our team's adherence to the original capital expenditure estimates for major equipment line items and work packages that have been secured on these projects to date is remarkable given the significant inflationary headwinds that the mining industry has faced since the beginning of 2022.  

 

  "Despite our record operating performance and outstanding project execution during the quarter, our financial results were impacted by operational challenges at our primary domestic smelting customer, which resulted in changes to our copper concentrate sales channels that are expected to continue through the balance of the year."  

 

  "Primarily as a result of higher allocation of sales to international customers and elevated input costs in the first half of the year across our business units, we have adjusted our full- year operating cost guidance ranges. Offsetting these increases, proactive capital management reviews with our team during the quarter identified over $20 million of capital deferrals that will not impact our business strategy yet will support continued balance sheet strength during this period of elevated market and copper price volatility."  

 

*These are non-IFRS measures and do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. Please refer to the Company's discussion of Non-IFRS measures in its Management's Discussion and Analysis for the three and six months ended June 30, 2022 and the Reconciliation of Non- GAAP Measures section at the end of this press release.

 

  SECOND QUARTER REVIEW  

 
  •   Mining & Milling Operations  
    • The Caraíba Operations processed 801,425 tonnes of ore grading 1.74% copper, producing a record 12,734 tonnes of copper in concentrate during the quarter after metallurgical recoveries of 91.2%.
    •  
    • The Xavantina Operations processed 57,291 tonnes grading 6.59 grams per tonne, producing a record 11,122 ounces of gold after metallurgical recoveries of 91.6% and 7,306 ounces of silver as a by-product.
    •  
  •  
  •   Organic Growth Projects  
    • At the Tucumã Project, the Company continued to advance critical-path workstreams during the period and subsequent to quarter-end. Highlights include:
      • Approximately 22% of planned capital expenditures under contract as of August 1, 2022, with another 8% in the final phases of contracting;
      •  
      • Capital commitments contracted and in the final phases of negotiation within 6% of Feasibility Study estimates;
      •  
      • Significant advances made on all road upgrades, including pit access and completion of community bypass road infrastructure;
      •  
      • Completion of approximately 75% of planned pre-production vegetation suppression required for pre-stripping activities to commence;
      •  
      • Purchase of the ball mill for the Project;
      •  
      • Site earth works initiated subsequent to quarter-end; and,
      •  
      • Installation of site drainage expected to be completed by end of October 2022, ahead of the rainy season.
      •  
    •  
    • At the Caraíba Operations, the Company made meaningful progress on its "Pilar 3.0" initiative, which encompasses various projects that jointly are designed to create a two-mine system at the Pilar Mine targeting higher sustained production levels. These projects include (i) construction of a new external shaft to access the Deepening Extension Zone, (ii) Project Honeypot, which is expected to support higher production volumes from the upper levels of the Pilar Mine, (iii) an expansion of the Caraíba Mill to 4.2 million tonnes per annum, and (iv) the recently completed Cooling Project. Select highlights include:
      • Equipment packages and supply contracts totaling approximately 25% of planned capital expenditures for the new external shaft finalized as of August 1, 2022 at 10% below budget;
      •  
      • Shaft sinking contract, which will bring estimated shaft capital secured under contract to approximately 70%, in the final negotiation phase. Upon execution, capital commitments under contract expected to align with original estimates;
      •  
      • Engineering and procurement related to shaft sinking were completed during the quarter with the shaft sinking contract anticipated to be finalized during the third quarter;
      •  
      • Completed construction of the concrete batch plant during the period and commenced commissioning activities subsequent to quarter-end;
      •  
      • Engineering and design work related to the expansion of the Caraíba Mill continued during the second quarter with the ball mill installation contract finalized subsequent to quarter-end;
      •  
      • Aggressively advanced drilling efforts within the Project Honeypot area, the results of which are expected to be included in the Company's year-end mineral reserve and resource estimates; and,
      •  
      • Completed the Cooling Project's second and final phase, with hand-over to operations occurring in April 2022 at better-than-design performance.
      •  
    •  
  •  
  •   Impact of Increased Sales of Copper Concentrate to International Market  
    • Historically, the Company has had limited exposure to movements in copper prices on provisional invoices due to its majority allocation of concentrate sales to domestic customers with which the Company has favorable payment terms. However, during the second quarter, operational challenges at the Company's primary domestic customer resulted in a higher allocation of sales to the international market. Longer quotational periods with international customers, combined with a weakening copper price just prior to quarter-end, resulted in a reduction to revenue of approximately $13.0 million during the period.
    •  
    • Quarterly cash flows from operations of $22.4 million were also impacted by an increase in accounts receivable of $18.9 million due to the timing of concentrate shipments and longer payment terms with international customers.
    •  
    • These concentrate sales changes, including related impacts on payment terms, are expected to continue through the end of 2022. Allocation of concentrate sales between domestic and international customers is expected to revert to historical levels in 2023 assuming competitive pricing terms.
    •  
  •  

  OPERATING AND FINANCIAL HIGHLIGHTS  

 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   
   3   months   ended     3   months   ended     3   months   ended     6   months   ended     6   months   ended  
   June 30, 2022       Mar. 31, 2022       June 30, 2021       June 30, 2022       June 30, 2021  
                  
  Operating   Highlights                   
  Copper   (Caraíba   Operations)                   
Ore Processed (tonnes)    801,425      596,230     553,992     1,397,655      1,151,586
Grade (% Cu)    1.74      1.78     2.13     1.76      2.22
Cu Production (tonnes)    12,734      9,784     10,898     22,518      23,536
Cu Production (000 lbs)    28,073      21,570     24,026     49,643      51,889
Cu Sold in Concentrate (tonnes)    12,948      10,045     10,094     22,993      22,562
Cu Sold in Concentrate (000 lbs)    28,546      22,145     22,253     50,691      22,253
C1 cash cost of Cu produced (per lb) (1)   $    1.24     $ 1.31    $ 0.72    $    0.63     $ 0.49
  Gold   (Xavantina   Operations)       
Au Production (oz)    11,122      8,796     10,377     19,918      19,828
C1 cash cost of Au Produced (per oz) (1)   $    643     $ 638    $ 499    $    641     $ 494
AISC of Au produced (per oz) (1)   $    1,169     $ 1,092    $ 660    $    1,135     $ 652
  Financial   Highlights   ($   in   millions,   except   per   share   amounts)  
Revenues   $    114.9     $ 108.9    $ 120.7    $    223.8     $ 243.2
Gross profit    50.7      61.0     83.7     111.7      166.5
EBITDA (1)    53.9      78.1     112.0     132.0      167.2
Adjusted EBITDA (1)    55.8      62.4     85.5     118.2      172.2
Cash flow from operations    22.4      44.0     85.1     66.4      147.2
Net income    24.1      52.5     84.0     76.6      116.0
Net income attributable to owners of the Company    23.8      52.1     83.4     75.9      115.2
Per share (basic)    0.26      0.58     0.95     0.84      1.31
Per share (diluted)    0.26      0.57     0.89     0.83      1.24
Adjusted net income attributable to owners of the Company (1)   

24.4  
    

33.0
    

53.5
   

57.3  
    

109.8
Per share (basic)    0.27      0.37     0.61     0.63      1.25
Per share (diluted)    0.27      0.36     0.57     0.62      1.18
Cash, cash equivalents, and short-term investments    429.9      365.5     137.7     429.9      137.7
Working capital (1)    417.7      443.7     118.9     417.7      118.9
Net (cash) debt (1)    (10.2    )     (54.4 )    19.2     (10.2    )     19.2
 

  (1) EBITDA, Adjusted EBITDA, Adjusted net income (loss) attributable to owners of the Company, Adjusted net income (loss) per share attributable to owners of the Company, Net (Cash) Debt, Working Capital, C1 cash cost of copper produced (per lb), C1 cash cost of gold produced (per ounce) and AISC of gold produced (per ounce) are non-IFRS measures. These measures do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. Please refer to the Company's discussion of Non-IFRS measures in its Management's Discussion and Analysis for the three and six months ended June 30, 2022 and the Reconciliation of Non-GAAP Measures section at the end of this press release.

 

  2022 GUIDANCE (*)  

 

The Company is reaffirming its full-year production guidance, lowering consolidated 2022 capital expenditure guidance, and raising operating cost guidance for the year.

 

At its Caraíba Operations, the Company continues to guide to the high-end of its reaffirmed 2022 copper production guidance range of 43,000 to 46,000 tonnes. As previously noted, copper production is expected to be roughly equally weighted between the first and second halves of the year with mining of the initial Project Honeypot stope (RC03) at the Pilar Mine expected to support a continuation of strong mined and processed copper grades into Q3 2022. At the Xavantina Operations, higher gold grades are expected to drive modestly higher gold production during the second half of the year.

 

The Company is lowering its consolidated 2022 capital expenditure guidance by over $20 million, from $330-$375 million to $308-$354 million, as a result of capital replanning efforts and deferrals at the Caraíba Operations. The deferral of this capital spend is not expected to impact timelines of the Company's key growth projects.

 

The Company is raising its full-year operating cost guidance ranges due to the impact of inflation in the cost of key consumables and a stronger BRL versus the US dollar during H1 2022 as well as an expected continuation of elevated copper concentrate sales to international markets in H2 2022. The Company's revised 2022 copper C1 cash cost guidance range is $1.20 to $1.35 (originally $1.05 to $1.15) per pound of copper produced. The Company is also increasing its 2022 gold C1 cash costs and AISC guidance ranges to
$600 to $700 (previously $500 to $600) and $1,000 to $1,100 (previously $925 to $1,025), respectively, per ounce of gold produced for its Xavantina Operations.

 

  2022 PRODUCTION AND COST GUIDANCE (*)  

 

The Company's cost guidance for 2022 assumes a USD:BRL foreign exchange rate of 5.30, a gold price of $1,725 per ounce and a silver price of $20.00 per ounce for H2 2022.

 
                              
   Original    Revised  
   
  Caraíba   Operations    
Copper Production (tonnes) 43,000 - 46,000 Unchanged
C1 Cash Cost Guidance (US$/lb) (1) $1.05 - $1.15 $1.20 - $1.35
   
  Xavantina   Operations    
Gold Production (ounces) 39,000 - 42,000 Unchanged
C1 Cash Cost Guidance (US$/oz) (1) $500 - $600 $600 - $700
All-in Sustaining Cost (AISC) Guidance (US$/oz) (1) $925 - $1,025 $1,000 - $1,100
 

  (1) These are non-IFRS measures and do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers.

 

  2022 CAPITAL EXPENDITURE GUIDANCE (*)  

 

The Company's capital expenditure guidance for 2022 assumes a USD:BRL foreign exchange rate of 5.30 for H2 2022 and has been presented below in USD millions.

 
                                                                      
   Original    Revised  
  
  Caraíba   Operations   
Growth $125 - $140 $95 - $110
Sustaining $80 - $90 $85 - $95
Exploration $25 - $30 Unchanged
  Total, Caraíba Operations    $230 - $260    $180 - $205  
   
  Tucumã   Project    
Growth $70 - $80 Unchanged
Exploration $5 - $6 Unchanged
  Total,   Tucumã   Project    $75 - $86    Unchanged  
   
  Xavantina   Operations    
Growth $0 - $1 $2 - $4
Sustaining $16 - $18 Unchanged
Exploration $9 - $10 $10 - $11
  Total,   Xavantina   Operations    $25 - $29    $28 - $33  
   
  Company   Total    
Growth $195 - $221 $167 - $194
Sustaining $96 - $108 $101 - $113
Exploration $39 - $46 $40 - $47
  Total, Company    $330 - $375    $308 - $354  
 

  (*) Guidance is based on certain estimates and assumptions, including but not limited to, mineral reserve estimates, grade and continuity of interpreted geological formations and metallurgical performance. Please refer to the Company's SEDAR and EDGAR filings, including the Company's most recent Annual Information Form ("AIF"), for complete risk factors.

 

  CONFERENCE CALL DETAILS  

 

The Company will hold a conference call on Wednesday, August 3, 2022 at 11:30 am Eastern time (8:30 am Pacific time) to discuss these results.

 
              
Date: Wednesday, August 3, 2022
Time: 11:30 am Eastern time (8:30 am Pacific time)
Dial in: North America: 1-800-319-4610, International: +1-604-638-5340
   please dial in 5-10 minutes prior and ask to join the call  
  
Replay: North America: 1-800-319-6413, International: +1-604-638-9010
Replay Passcode: 9222
 

  Reconciliation of Non-IFRS Measures  

 

The Company utilizes certain alternative performance (non-IFRS) measures to monitor its performance, including C1 cash cost of copper produced (per lb), C1 cash cost of gold produced (per ounce), AISC of gold produced (per ounce), EBITDA, adjusted EBITDA, adjusted net income attributable to owners of the Company, adjusted net income per share, net (cash) debt, working capital and available liquidity. These performance measures have no standardized meaning prescribed within generally accepted accounting principles under IFRS and, therefore, amounts presented may not be comparable to similar measures presented by other mining companies. These non-IFRS measures are intended to provide supplemental information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.

 

For additional details please refer to the Company's discussion of non-GAAP and other performance measures in its Management's Discussion and Analysis for the three and six months ended June 30, 2022 which is available on SEDAR at www.sedar.com and on EDGAR at www.sec.gov.  

 

  C1 cash cost of copper produced (per lb.)  

 

The following table provides a reconciliation of C1 cash cost of copper produced per pound to cost of production, its most directly comparable IFRS measure.

 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        
  Reconciliation:    2022 - Q2   
 
   2022 - Q1   
 
   2021 - Q2   
 
   2022 - YTD   
 
   2021 - YTD  
Cost of production   $    38,015     $ 29,163    $ 20,464     $    67,178     $ 42,266  
Add (less):                    
Transportation costs & other    2,579      (904 )    (569 )     (1,920    )     (1,382 )
Treatment, refining, and other    3,893      577     701      (1,330    )     (1,967 )
By-product credits    (6,438    )     1,869     1,516      4,448      2,491  
Incentive payments    (1,016    )     (4,812 )    (5,522 )     (11,250    )     (11,722 )
Net change in inventory    (1,907    )     2,046     392      5,939      1,171  
Foreign exchange translation and other    (178    )     386     352      208      199  
  C1 cash costs    $    34,948     $ 28,325    $ 17,334     $    63,273     $ 31,056  
      
Mining   $    23,933     $ 20,126    $ 13,732     $    44,059     $ 11,869  
Processing    7,988      6,447     5,132      14,435      4,010  
Indirect    5,572      4,518     3,600      10,090      3,264  
Production costs    37,493      31,091     22,464      68,584      19,143  
By-product credits    (6,438    )     (4,812 )    (5,522 )     (11,250    )     (6,200 )
Treatment, refining and other    3,893      2,046     392      5,939      779  
  C1 cash costs    $    34,948     $ 28,325    $ 17,334     $    63,273     $ 13,722  
      
Payable copper produced (lb, 000)    28,073      21,570     24,026      49,643      51,889  
      
Mining   $    0.85     $ 0.93    $ 0.57     $    0.89     $ 0.43  
Processing   $    0.28     $ 0.30    $ 0.21     $    0.29     $ 0.14  
Indirect   $    0.20     $ 0.21    $ 0.15     $    0.20     $ 0.12  
By-product credits   $    (0.23    )    $ (0.22 )   $ (0.23 )    $    (0.23    )    $ (0.22 )
Treatment, refining and other   $    0.14     $ 0.09    $ 0.02     $    0.12     $ 0.03  
  C1 cash costs   of   copper   produced   (per   lb)    $    1.24     $ 1.31    $ 0.72     $    1.27     $ 0.49  
 

  
C1 cash cost of gold produced and All-in Sustaining Cost of gold produced (per ounce)
 

 

The following table provides a reconciliation of C1 cash cost of gold produced per ounce and AISC of gold produced per ounce to cost of production, its most directly comparable IFRS measure.

 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    
  Reconciliation:    2022 - Q2   
 
   2022 - Q1   
 
   2021 - Q2   
 
   2022 - YTD   
 
   2021 - YTD  
Cost of production   $    7,225     $ 5,392    $ 5,080     $    12,617     $ 10,164  
Add (less):      
Incentive payments    (188    )     (585 )    (210 )     (773    )     (493 )
Net change in inventory    (73    )     727     292      654      165  
By-product credits    (145    )     (124 )    (157 )     (269    )     (305 )
Foreign exchange translation and other    327      206     176      533      257  
  C1 cash costs    $    7,146     $ 5,616    $ 5,181     $    12,762     $ 9,788  
Site general and administrative    882      559     369      1,441      676  
Accretion of mine closure and rehabilitation provision    112      112     (63 )     224      (112 )
Sustaining capital expenditure    3,690      2,296     527      5,986      1,012  
Sustaining leases    894      822     565      1,716      1,027  
Royalties and production taxes    277      204     271      481      540  
  AISC    $    13,001     $ 9,609    $ 6,850     $    22,610     $ 12,931  
      
   2022 - Q2   
 
   2022 - Q1   
 
   2021 - Q2   
 
   2022 - YTD   
 
   2021 - YTD  
  Costs       
Mining   $    3,929     $ 3,218    $ 2,481     $    7,147     $ 4,744  
Processing    2,285      1,698     1,937      3,983      3,617  
Indirect    1,077      824     920      1,901      1,732  
Production costs    7,291      5,740     5,338      13,031      10,093  
By-product credits    (145    )     (124 )    (157 )     (269    )     (305 )
  C1 cash costs    $    7,146     $ 5,616    $ 5,181     $    12,762     $ 9,788  
Site general and administrative    882      559     369      1,441      676  
Accretion of mine closure and rehabilitation provision    112      112     (63 )     224      (112 )
Sustaining capital expenditure    3,690      2,296     527      5,986      1,012  
Sustaining leases    894      822     565      1,716      1,027  
Royalties and production taxes    277      204     271      481      540  
  AISC    $    13,001     $ 9,609    $ 6,850     $    22,610     $ 12,931  
      
  Costs   per   ounce       
Payable gold produced (ounces)    11,122      8,796     10,377      19,918      19,828  
      
Mining   $    353     $ 366    $ 239     $    359     $ 239  
Processing   $    205     $ 193    $ 187     $    200     $ 182  
Indirect   $    97     $ 94    $ 89     $    95     $ 87  
By-product credits   $    (12    )    $ (15 )   $ (15 )    $    (13    )    $ (14 )
  C1   cash   costs of gold produced (per ounce)    $    643     $ 638    $ 499     $    641     $ 494  
  AISC   of   gold   produced   (per   ounce)    $    1,169     $ 1,092    $ 660     $    1,135     $ 652  
 

  
Earnings before interest, taxes, depreciation and amortization (EBITDA) and Adjusted EBITDA
 

 

The following table provides a reconciliation of EBITDA and Adjusted EBITDA to net income, its most directly comparable IFRS measure.

 
                                                                                                                                                                                                    
  Reconciliation:    2022 - Q2   
 
   2022 - Q1   
 
   2021 - Q2   
 
   2022 - YTD   
 
   2021 - YTD   
 
  Net Income    $    24,110     $ 52,486    $ 83,979     $    76,596     $ 116,036  
Adjustments:      
Finance expense    8,154      5,496     2,306      13,650      6,076  
Income tax expense    5,283      8,606     15,862      13,889      23,691  
Amortization and depreciation    16,360      11,504     9,871      27,865      21,382  
  EBITDA    $    53,907     $ 78,092    $ 112,018     $    132,000     $ 167,185  
Foreign exchange loss (gain)    3,303      (18,709 )    (30,718 )     (15,406    )     (2,093 )
Share based compensation    (2,333    )     1,990     2,480      (343    )     4,826  
Incremental COVID-19 costs    952      1,004     1,749      1,956      2,305  
  Adjusted   EBITDA    $    55,829     $ 62,377    $ 85,529     $    118,207     $ 172,223  
 

  
Adjusted net income attributable to owners of the Company and Adjusted net income per share attributable to owners of the Company
 

 

The following table provides a reconciliation of Adjusted net income attributable to owners of the Company and Adjusted EPS to net income attributable to the owners of the Company, its most directly comparable IFRS measure.

 
                                                                                                                                                                                                                                                                                                     
  Reconciliation:    2022 - Q2   
 
   2022 - Q1   
 
   2021 - Q2   
 
   2022 - YTD   
 
   2021 - YTD  
  Net income as reported attributable to the owners of the  
  Company    $    23,820     $ 52,107    $ 83,419     $    75,927     $ 115,168  
Adjustments:      
Share based compensation    (2,333    )     1,990     2,480      (343    )     4,826  
Unrealized foreign exchange loss (gain) on USD      
denominated balances in MCSA    1,038      (1,337 )    (8,712 )     (299    )     (912 )
Unrealized foreign exchange loss (gain) on foreign exchange derivative contracts    1,405      (24,615 )    (29,799 )     (23,210    )     (12,928 )
Incremental COVID-19 costs    946      998     1,735      1,944      2,291  
Unrealized (gain) loss on interest rate derivative      
contracts             6          (409 )
Tax effect on the above adjustments    (519    )     3,808     4,344      3,289      1,771  
  Adjusted net income attributable to owners of the Company    $    24,357     $ 32,951    $ 53,473     $    57,308     $ 109,807  
      
  Weighted   average   number   of   common   shares       
Basic    90,539,647      90,238,008     88,251,995      90,389,661      88,158,672  
Diluted    91,850,321      92,050,104     93,314,274      91,887,665      93,106,210  
      
  Adjusted   EPS       
Basic   $    0.27     $ 0.37    $ 0.61     $    0.63     $ 1.25  
Diluted   $    0.27     $ 0.36    $ 0.57     $    0.62     $ 1.18  
 

  
Net (Cash) Debt
 

 

The following table provides a calculation of net (cash) debt based on amounts presented in the Company's condensed consolidated interim financial statements as at the periods presented.

 
                                                                                                        
   June 30, 2022   
 
   March 31, 2022   
 
   December 31, 2021   
 
   June 30, 2021   
 
Current portion of loans and borrowings   $    16,219     $
8,740    $ 4,344    $ 4,461  
Long-term portion of loans and borrowings    403,492      402,345     54,906     152,404  
Less:                
Cash and cash equivalents    (329,292    )     (365,465 )    (130,129 )    (137,655 )
Short-term investments    (100,589    )     (100,018 )       (26,408 )
  Net (cash) debt    $    (10,170    )    $ (54,398 )   $ (70,879 )   $ (7,198 )
 

  
Working capital and Available liquidity
 

 

The following table provides a calculation for these based on amounts presented in the Company's condensed consolidated interim financial statements as at the periods presented.

 
                                                                                                                              
   June 30, 2022   
 
   March 31, 2022   
 
   December 31, 2021   
 
   June 30, 2021   
 
Current assets   $    523,201     $ 546,439    $ 208,686    $ 202,342  
Less: Current liabilities    (105,527    )     (102,743 )    (122,660 )    (83,453 )
  Working capital    $    417,674     $ 443,696    $ 86,026    $ 118,889  
     
Cash and cash equivalents    329,292      365,465     130,129     137,655  
Short-term investments    100,589      100,018     26,408     
Available undrawn revolving credit
facilities    75,000      75,000     100,000     
  Available liquidity    $    504,881     $ 540,483    $ 256,537    $ 137,655  
 

  
ABOUT ERO COPPER CORP
 

 

Ero is a high-margin, high-growth, clean copper producer with operations in Brazil and corporate headquarters in Vancouver, B.C. The Company's primary asset is a 99.6% interest in the Brazilian copper mining company, Mineração Caraíba S.A. ("MCSA"), 100% owner of the Company's Caraíba Operations (formerly known as the MCSA Mining Complex), which are located in the Curaçá Valley, Bahia State, Brazil and include the Pilar and Vermelhos underground mines and the Surubim open pit mine, and the Tucumã Project (formerly known as Boa Esperança), an IOCG-type copper project located in Pará, Brazil. The Company also owns 97.6% of NX Gold S.A. ("NX Gold") which owns the Xavantina Operations (formerly known as the NX Gold Mine), comprised of an operating gold and silver mine located in Mato Grosso, Brazil. Additional information on the Company and its operations, including technical reports on the Caraíba Operations, Xavantina Operations and Tucumã Project, can be found on the Company's website (www.erocopper.com), on SEDAR (www.sedar.com), and on EDGAR (www.sec.gov). The Company's shares are publicly traded on the Toronto Stock Exchange and the New York Stock Exchange under the symbol "ERO".

 

  ERO   COPPER   CORP.  

 
        
  /s/ David Strang    For further information contact:  
David Strang, CEO Courtney Lynn, VP, Corporate Development & Investor Relations
  (604) 335-7504
   info@erocopper.com  
 

CAUTION REGARDING FORWARD LOOKING INFORMATION AND STATEMENTS

 

This press release contains "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian securities legislation (collectively, "forward-looking statements"). Forward-looking statements include statements that use forward-looking terminology such as "may", "could", "would", "will", "should", "intend", "target", "plan", "expect", "budget", "estimate", "forecast", "schedule", "anticipate", "believe", "continue", "potential", "view" or the negative or grammatical variation thereof or other variations thereof or comparable terminology. Forward-looking statements may include, but are not limited to, statements with respect to mineral reserve and mineral resource estimates; targeting additional mineral resources and expansion of deposits; capital and operating cost estimates and economic analyses (including cash flow projections), including those from the Caraíba Operations Technical Report, the Xavantina Operations Technical Report and the Tucumã Project Technical Report; the Company's expectations, strategies and plans for the Caraíba Operations, the Xavantina Operations and the Tucumã Project, including the Company's planned organic growth, exploration, development, construction and production activities; the results of future exploration and drilling; estimated completion dates for certain milestones; successfully adding or upgrading mineral resources and successfully developing new deposits; the costs and timing of future exploration, development and construction including but not limited to the Deepening Extension Project at the Caraíba Operations and the Tucumã Project; the timing and amount of future production at the Caraíba Operations, the Xavantina Operations and the Tucumã Project; the impacts of COVID-19 on the Company's business and operations; expectations regarding the Company's ability to manage risks related to future copper price fluctuations and volatility; future financial or operating performance and condition of the Company and its business, operations and properties, including expectations regarding liquidity, capital structure, balance sheet strength and competitive position; expectations about sustainability efforts and strategies including the cost and ability to offset the environmental impact of operating and/or construction activities; expectations regarding future currency exchange rates; and any other statement that may predict, forecast, indicate or imply future plans, intentions, levels of activity, results, performance or achievements.

 

Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual results, actions, events, conditions, performance or achievements to materially differ from those expressed or implied by the forward-looking statements, including, without limitation, risks discussed in this press release and in the AIF under the heading "Risk Factors". The risks discussed in this press release and in the AIF are not exhaustive of the factors that may affect any of the Company's forward-looking statements. Although the Company has attempted to identify important factors that could cause actual results, actions, events, conditions, performance or achievements to differ materially from those contained in forward-looking statements, there may be other factors that cause results, actions, events, conditions, performance or achievements to differ from those anticipated, estimated or intended.

 

Forward-looking statements are not a guarantee of future performance. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements involves statements about the future and are inherently uncertain, and the Company's actual results, achievements or other future events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to herein and in the AIF under the heading "Risk Factors".

 

The Company's forward-looking statements are based on the assumptions, beliefs, expectations and opinions of management on the date the statements are made, many of which may be difficult to predict and beyond the Company's control. In connection with the forward-looking statements contained in this press release and in the AIF, the Company has made certain assumptions about, among other things: continued effectiveness of the measures taken by the Company to mitigate the possible impact of COVID-19 on its workforce and operations; favourable equity and debt capital markets; the ability to raise any necessary additional capital on reasonable terms to advance the production, development and exploration of the Company's properties and assets; future prices of copper, gold and other metal prices; the timing and results of exploration and drilling programs; the accuracy of any mineral reserve and mineral resource estimates; the geology of the Caraíba Operations, the Xavantina Operations and the Tucumã Project being as described in the respective technical report for each property; production costs; the accuracy of budgeted exploration, development and construction costs and expenditures; the price of other commodities such as fuel; future currency exchange rates and interest rates; operating conditions being favourable such that the Company is able to operate in a safe, efficient and effective manner; work force continuing to remain healthy in the face of prevailing epidemics, pandemics or other health risks (including COVID-19), political and regulatory stability; the receipt of governmental, regulatory and third party approvals, licenses and permits on favourable terms; obtaining required renewals for existing approvals, licenses and permits on favourable terms; requirements under applicable laws; sustained labour stability; stability in financial and capital goods markets; availability of equipment; positive relations with local groups and the Company's ability to meet its obligations under its agreements with such groups; and satisfying the terms and conditions of the Company's current loan arrangements. Although the Company believes that the assumptions inherent in forward-looking statements are reasonable as of the date of this press release, these assumptions are subject to significant business, social, economic, political, regulatory, competitive and other risks and uncertainties, contingencies and other factors that could cause actual actions, events, conditions, results, performance or achievements to be materially different from those projected in the forward-looking statements. The Company cautions that the foregoing list of assumptions is not exhaustive. Other events or circumstances could cause actual results to differ materially from those estimated or projected and expressed in, or implied by, the forward-looking statements contained in this press release.

 

Forward-looking statements contained herein are made as of the date of this press release and the Company disclaims any obligation to update or revise any forward-looking statement, whether as a result of new information, future events or results or otherwise, except as and to the extent required by applicable securities laws.

 

CAUTIONARY NOTES REGARDING MINERAL RESOURCE AND MINERAL RESERVE ESTIMATES

 

In accordance with applicable Canadian securities regulatory requirements, all mineral reserve and mineral resource estimates of the Company disclosed or incorporated by reference in this press release have been prepared in accordance with NI 43-101 and are classified in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definition Standards for Mineral Resources and Mineral Reserves, adopted by the CIM Council on May 10, 2014 (the "CIM Standards"). NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. NI 43-101 differs significantly from the disclosure requirements of the Securities and Exchange Commission (the "SEC") generally applicable to U.S. companies. For example, the terms "mineral reserve", "proven mineral reserve", "probable mineral reserve", "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" are defined in NI 43-101. These definitions differ from the definitions in the disclosure requirements promulgated by the SEC. Accordingly, information contained in this press release may not be comparable to similar information made public by U.S. companies reporting pursuant to SEC disclosure requirements.

 

Mineral resources which are not mineral reserves do not have demonstrated economic viability. Pursuant to the CIM Standards, mineral resources have a higher degree of uncertainty than mineral reserves as to their existence as well as their economic and legal feasibility. Inferred mineral resources, when compared with measured or indicated mineral resources, have the least certainty as to their existence, and it cannot be assumed that all or any part of an inferred mineral resource will be upgraded to an indicated or measured mineral resource as a result of continued exploration. Pursuant to NI 43-101, inferred mineral resources may not form the basis of any economic analysis. Accordingly, readers are cautioned not to assume that all or any part of a mineral resource exists, will ever be converted into a mineral reserve, or is or will ever be economically or legally mineable or recovered.

 

 

 

  Primary Logo 

 

News Provided by GlobeNewswire via QuoteMedia

ERO:CA
The Conversation (0)
Loyal Metals Limited

Loyal to Acquire the High-Grade Highway Reward Copper Gold Mine

Loyal Metals Limited (ASX:LLM) (Loyal, LLM, or the Company) is pleased to announce that it has acquired a binding option to purchase the Highway Reward Copper Gold Mine in Queensland, Australia, one of the highest-grade copper mines worldwide, with past production totalling 3.65 million tonnes at 5.7% Cu and 260,000 tonnes at 4.5 g/t Au 1-9. This acquisition is the first step in Loyal’s 2025 Strategic Plan to broaden its critical minerals portfolio into copper. No exploration has been conducted on the mining leases since mining ceased in July 2005, despite a ~680% increase in copper prices and a ~1,256% increase in gold prices since the 1997 feasibility study 3,4. With over $4.4 million in funding, Loyal is well-positioned to revisit the high-grade Highway Reward Copper Gold Mine by deploying modern exploration techniques11.

Keep reading...Show less
Textured copper ribbons weave over a black background.

​Copper​ Market Hit by Major Supply Squeeze as LME Inventories Drop

One of the sharpest copper supply crunches in recent memory is rattling global commodities markets, as inventories at the London Metal Exchange (LME) plummet and the spot price soars.

Bloomberg reported that as of Monday (June 23), copper for immediate delivery was trading at a premium of US$345 per metric ton over three month futures, the widest spread since a record squeeze in 2021.

That dramatic price divergence reflects the market’s acute concerns over access to physical copper, with readily available inventories on the LME falling by around 80 percent this year alone.

Keep reading...Show less
Many copper bobbins and warehouse copper pipes.

Top 10 Copper-producing Companies

Copper miners with productive assets have much to gain as supply and demand tighten.

In May 2024, the copper price hit a new all-time high of US$10,954 per metric ton (MT) on the London Metal Exchange and US$5.20 per pound on the COMEX on the back of increasing demand and growing supply concerns.

Copper is one of the most important resources for the energy transition. However, in recent years, demand for the red metal has outpaced mining supply. While construction and electrical grids have long been major markets for copper, today the rise in demand for electric vehicles, EV charging infrastructure and energy storage applications are emerging drivers of copper consumption.

Another trend driving future copper demand is the rapid urbanization in the Global South, as rural populations migrate to cities, putting pressure on electricity grids.

Keep reading...Show less
White Cliff Minerals

John Hancock to join White Cliff Minerals Board

Astrotricha Capital SEZC appointed Advisors

White Cliff Minerals Limited (“WCN” or the “Company”) (ASX: WCN; OTCQB: WCMLF) is pleased to announce that John Hancock will join the Board of White Cliff Minerals effective 1 August 2025.

Keep reading...Show less
Gavel on books with "5 Top Canadian Mining Stocks This Week" text overlay.

Top 5 Canadian Mining Stocks This Week: Royalties Jumps 183 Percent on Legal Win

Welcome to the Investing News Network's weekly look at the best-performing Canadian mining stocks on the TSX, TSXV and CSE, starting with a round-up of Canadian and US news impacting the resource sector.

Friday (June 20) was the last day for the spring session of Canada’s parliament before its summer break.

On the agenda for the day was a vote on bill C-5, “The One Canadian Economy Act,” which was introduced on June 5.

Keep reading...Show less
Cyprium Metals

Nifty Copper Project Virtual Site Visit

Cyprium Metals Limited (ASX: CYM, OTC: CYPMF) (Cyprium or the Company) invites shareholders to join an investor webinar and live Q&A hosted by Executive Chairman Matt Fifield on Tuesday 24th June 2025. Investors will be guided on a virtual site visit of the Nifty Copper Complex showcasing the sulphide and heap leach resources and extensive brownfield infrastructure.

Keep reading...Show less