UEX Commences Trading on the OTCQB Venture Market

(TheNewswire)



Saskatoon, SK TheNewswire - December 23, 2020 UEX Corporation (TSX:UEX, OTC:UEXCF) ("UEX" or the "Company") is pleased to announce that it has received approval from the OTC Market Group Inc. to commence trading on the OTCQB Venture Market under the OTCQB ticker symbol "UEXCF" at the opening of the trading day on December 23, 2020.  UEX's shares will continue to trade on the Toronto Stock Exchange .

The OTCQB offers transparent trading in entrepreneurial and development stage companies that have met a minimum bid price test, are current in their financial reporting and have undergone an annual verification and management certification process. These standards provide a strong baseline of transparency, as well as the technology and regulation to improve the information and trading experience for investors.

"UEX is excited to be listing on the OTCQB Venture Market. We believe a secondary listing on the OTCQB will provide the Company with increased access to US institutional and retail investors and a broader shareholder base. U.S. investors will have the opportunity to share in the Company's growth as investor interest in clean-air benefits of nuclear power and the uranium industry gain momentum," said Roger Lemaitre, President and CEO of UEX Corporation. "U.S. investors can find Real-Time quotes and market information for UEX at www.otcmarkets.com and access current company news and developments."

About UEX

UEX (TSX:UEX, OTCQB:UEXCF, UXO.F) is a Canadian uranium and cobalt exploration and development company involved in an exceptional portfolio of uranium projects, including a number that are 100% owned and operated by UEX, one joint venture with Orano Canada Inc. ("Orano") and ALX Uranium Corp. ("ALX") that is 51.43% owned by UEX, as well as eight joint ventures with Orano, one joint venture with Orano and JCU (Canada) Exploration Company Limited, which are operated by Orano, and one project (Christie Lake), that is 64.34% owned by UEX with JCU (Canada) Exploration Company Limited which is operated by UEX.

The Company is also leading the discovery of cobalt in Canada, with three cobalt-nickel exploration projects located in the Athabasca Basin of northern Saskatchewan, including the only primary cobalt deposit in Canada.  The 100% owned West Bear Project was formerly part of UEX's Hidden Bay Project and contains the West Bear Cobalt-Nickel Deposit and the West Bear Uranium Deposit.  UEX also owns 100% of two early-stage cobalt exploration projects, the Axis Lake and Key West Projects.

Our portfolio of projects is located in the eastern, western and northern perimeters of the Athabasca Basin, the world's richest uranium belt.  UEX is currently advancing several uranium deposits in the Athabasca Basin which include the Christie Lake deposits, the Kianna, Anne, Colette and 58B deposits at its currently 49.1%-owned Shea Creek Project (located 50 kilometres north of Fission's Triple R Deposit and Patterson Lake South Project, and NexGen's Arrow Deposit), the Horseshoe and Raven deposits located on its 100%-owned Horseshoe-Raven Development Project and the West Bear Uranium Deposit located at its 100%-owned West Bear Project.

FOR FURTHER INFORMATION PLEASE CONTACT

Roger Lemaitre

President & CEO

(306) 979-3849

Forward-Looking Information and Cautionary Language

This news release contains statements that constitute "forward-looking information" for the purposes of Canadian securities laws. Such statements are based on UEX's current expectations, estimates, forecasts and projections. Such forward-looking information includes statements regarding the West Bear Co-Ni Property, the Christie Lake Property drill program, the Hidden Bay Property, the Shea Creek Property, UEX's drill hole results, uranium, cobalt and nickel prices, outlook for our future operations, plans and timing for exploration activities, and other expectations, intentions and plans that are not historical fact. Such forward-looking information is based on certain factors and assumptions and is subject to risks, uncertainties and other factors that could cause actual results to differ materially from future results expressed or implied by such forward-looking information. Important factors that could cause actual results to differ materially from UEX's expectations include uncertainties relating to the, interpretation of drill results and geology, assay confirmation, additional drilling results, continuity and grade of deposits, fluctuations in uranium, cobalt and nickel prices and currency exchange rates, changes in environmental and other laws affecting uranium, cobalt and nickel exploration and mining, and other risks and uncertainties disclosed in UEX's Annual Information Form and other filings with the applicable Canadian securities commissions on SEDAR. Many of these factors are beyond the control of UEX. Consequently, all forward-looking information contained in this news release is qualified by this cautionary statement and there can be no assurance that actual results or developments anticipated by UEX will be realized. For the reasons set forth above, investors should not place undue reliance on such forward-looking information. Except as required by applicable law, UEX disclaims any intention or obligation to update or revise forward-looking information, whether as a result of new information, future events or otherwise.

Copyright (c) 2020 TheNewswire - All rights reserved.

News Provided by TheNewsWire via QuoteMedia

The Conversation (0)

Cameco Announces 2024 Results; Strong Performance Across All Segments; Westinghouse Distribution; Strategy Centered on Marketing, Production, Financial Discipline Expected to Generate Full-Cycle Value; Positive Outlook for Nuclear Energy

Cameco( TSX: CCO; NYSE: CCJ) today reported its consolidated financial and operating results for the fourth quarter and year ended December 31, 2024, in accordance with International Financial Reporting Standards (IFRS).

�Our 2024 full-year financial performance benefitted from strong fourth quarter results delivered by our uranium and Westinghouse segments," said Tim Gitzel, Cameco's president and CEO. "Although both net earnings and adjusted net earnings in 2024 were lower than in 2023 primarily due to the impact of purchase accounting related to the Westinghouse acquisition, our other key financial metrics improved significantly. We expect our strong financial performance to continue in 2025, driven by the supportive market conditions we are seeing throughout the fuel cycle and across the nuclear sector, and through the continued benefits flowing from our investment in Westinghouse. Over the coming year, we expect to continue investing to help ensure reliability and sustainability of our existing operations, while positioning ourselves for future production flexibility and growth growth that will be strategic, deliberate, disciplined, and with a focus on generating full-cycle value.

News Provided by Business Wire via QuoteMedia

Keep reading...Show less
High-Grade Mineralisation Identified at North Sweden Project

High-Grade Mineralisation Identified at North Sweden Project

Basin Energy (BSN:AU) has announced High-Grade Mineralisation Identified at North Sweden Project

Download the PDF here.

Global Atomic Provides Corporate Update

Global Atomic Corporation (" Global Atomic " or the " Company ") (TSX: GLO) (OTCQX: GLATF) (FRANKFURT: G12) is pleased to provide an update on recent activities at the Company and the Dasa Uranium Project in the Republic of Niger .

Global Atomic Corporation Logo (CNW Group/Global Atomic Corporation)

NIGER UPDATE

At the African Mining Indaba Conference held in Cape Town last week, the Company held several important meetings with Niger's Mines Minister Abarchi, who was present at the largest mining conference in Africa , promoting his Country to attract potential investors interested in the mining sector. The Minister emphasized the Government's strong support for Global Atomic and the Dasa Project, and confirmed his government has no intention to nationalize the Dasa Project.

In various meetings attended by Minister Abarchi at the Conference, he stated that Niger welcomes and encourages investment by foreign mining companies specifically including those from Canada , the United States and Australia.  Further, at the end of last week the Niger government announced plans to hold a major conference in mid-February to establish a process that will govern the transition to a democratic election.

The Company held additional meetings in Cape Town , including with new groups interested in financing the Dasa Project, as well as suppliers and contractors who are currently working with Global Atomic and SOMIDA.

PROJECT DEVELOPMENT

The advancement of the Dasa underground has progressed on the first two levels along the footwall of the ore body.  Five-meter diameter ventilation raises have been completed and commissioned enabling continued underground development while maintaining safe working conditions and efficiency.

Plant construction is proceeding on schedule with earthworks nearing completion and civil works underway and the concrete batch plant now under construction.  Large pieces of processing equipment such as the SAG mill shell, crusher and acid plant are now on site.  The camp that will house the plant construction crew is well underway with a large percentage of housing now ready for occupation.

FINANCING

Since the inauguration of President Trump in the United States of America , the market reaction has been that debt funding for the Dasa Project is unlikely to come from the USA .  However, these discussions continue as well as the advancement of the Joint Venture final documentation. It is important to remember that the Company has entered into off-take agreements for 8.8 million pounds U 3 O 8 over the first 7 years of the Mine; 90% of which has been sold to US utilities.  As a result of the many successful meetings at the Indaba Conference, new parties have indicated a willingness to participate in the final funding solution for Dasa. Management is confident that these initiatives will continue to progress, and we reiterate our belief that prior to the end of Q1, 2025, further clarity can be shared with the market.

Stephen Roman , President & CEO of Global Atomic, stated, " By advancing the development of the mine, processing plant and infrastructure, we have significantly moved the Dasa Project closer to production while continuously adding to the intrinsic value of the Dasa Project.  This is the basis of appraisal for all our financing discussions and not the current value of our shares."

A recent video of our progress in Niger is available at https://www.youtube.com/watch?v=ITl8r104-MA .

About Global Atomic

Global Atomic Corporation ( www.globalatomiccorp.com ) is a publicly listed company that provides a unique combination of high-grade uranium mine development and cash-flowing zinc concentrate production.

The Company's Uranium Division is currently developing the fully permitted, large, high grade Dasa Deposit, discovered in 2010 by Global Atomic geologists through grassroots field exploration.  The "First Blast Ceremony" occurred on November 5, 2022 , and commissioning of the processing plant is scheduled for Q1, 2026.  Global Atomic has also identified 3 additional uranium deposits in Niger that can be advanced with further assessment work.

Global Atomic's Base Metals Division holds a 49% interest in the Befesa Silvermet Turkey, S.L. (BST) Joint Venture, which operates a modern zinc recycling plant, located in Iskenderun, Türkiye. The plant recovers zinc from Electric Arc Furnace Dust (EAFD) to produce a high-grade zinc oxide concentrate which is sold to zinc smelters around the world. The Company's joint venture partner, Befesa Zinc S.A.U. (Befesa) holds a 51% interest in and is the operator of the BST Joint Venture.  Befesa is a market leader in EAFD recycling, with approximately 50% of the European EAFD market and facilities located throughout Europe , Asia and the United States of America .

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS:

The information in this release may contain forward-looking information under applicable securities laws.  Forward-looking information includes, but is not limited to, statements with respect to completion of any financings; Global Atomics' development potential and timetable of its operations, development and exploration assets; Global Atomics' ability to raise additional funds necessary; the future price of uranium; the estimation of mineral reserves and resources; conclusions of economic evaluation; the realization of mineral reserve estimates; the timing and amount of estimated future production, development and exploration; cost of future activities; capital and operating expenditures; success of exploration activities; mining or processing issues; currency exchange rates; government regulation of mining operations; and environmental and permitting risks.   Generally, forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "is expected", "estimates", variations of such words and phrases or statements that certain actions, events or results "could", "would", "might", "will be taken", "will begin", "will include", "are expected", "occur" or "be achieved".  All information contained in this news release, other than statements of current or historical fact, is forward-looking information.   Statements of forward-looking information are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Global Atomic to be materially different from those expressed or implied by such forward-looking statements, including but not limited to those risks described in the annual information form of Global Atomic and in its public documents filed on SEDAR from time to time.

Forward-looking statements are based on the opinions and estimates of management at the date such statements are made.  Although management of Global Atomic has attempted to identify important factors that could cause actual results to be materially different from those forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended.  There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.  Accordingly, readers should not place undue reliance upon forward-looking statements.  Global Atomic does not undertake to update any forward-looking statements, except in accordance with applicable securities law.  Readers should also review the risks and uncertainties sections of Global Atomics' annual and interim MD&As.

The Toronto Stock Exchange has not reviewed and does not accept responsibility for the adequacy and accuracy of this news release.

Global Atomic - TSX 30 - OTX 50 (CNW Group/Global Atomic Corporation)

SOURCE Global Atomic Corporation

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/February2025/12/c0271.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Global Atomic Provides Corporate Update

Global Atomic Corporation (" Global Atomic " or the " Company ") (TSX: GLO) (OTCQX: GLATF) (FRANKFURT: G12) is pleased to provide an update on recent activities at the Company and the Dasa Uranium Project in the Republic of Niger .

Global Atomic Corporation Logo (CNW Group/Global Atomic Corporation)

NIGER UPDATE

At the African Mining Indaba Conference held in Cape Town last week, the Company held several important meetings with Niger's Mines Minister Abarchi, who was present at the largest mining conference in Africa , promoting his Country to attract potential investors interested in the mining sector. The Minister emphasized the Government's strong support for Global Atomic and the Dasa Project, and confirmed his government has no intention to nationalize the Dasa Project.

In various meetings attended by Minister Abarchi at the Conference, he stated that Niger welcomes and encourages investment by foreign mining companies specifically including those from Canada , the United States and Australia.  Further, at the end of last week the Niger government announced plans to hold a major conference in mid-February to establish a process that will govern the transition to a democratic election.

The Company held additional meetings in Cape Town , including with new groups interested in financing the Dasa Project, as well as suppliers and contractors who are currently working with Global Atomic and SOMIDA.

PROJECT DEVELOPMENT

The advancement of the Dasa underground has progressed on the first two levels along the footwall of the ore body.  Five-meter diameter ventilation raises have been completed and commissioned enabling continued underground development while maintaining safe working conditions and efficiency.

Plant construction is proceeding on schedule with earthworks nearing completion and civil works underway and the concrete batch plant now under construction.  Large pieces of processing equipment such as the SAG mill shell, crusher and acid plant are now on site.  The camp that will house the plant construction crew is well underway with a large percentage of housing now ready for occupation.

FINANCING

Since the inauguration of President Trump in the United States of America , the market reaction has been that debt funding for the Dasa Project is unlikely to come from the USA .  However, these discussions continue as well as the advancement of the Joint Venture final documentation. It is important to remember that the Company has entered into off-take agreements for 8.8 million pounds U 3 O 8 over the first 7 years of the Mine; 90% of which has been sold to US utilities.  As a result of the many successful meetings at the Indaba Conference, new parties have indicated a willingness to participate in the final funding solution for Dasa. Management is confident that these initiatives will continue to progress, and we reiterate our belief that prior to the end of Q1, 2025, further clarity can be shared with the market.

Stephen Roman , President & CEO of Global Atomic, stated, " By advancing the development of the mine, processing plant and infrastructure, we have significantly moved the Dasa Project closer to production while continuously adding to the intrinsic value of the Dasa Project.  This is the basis of appraisal for all our financing discussions and not the current value of our shares."

A recent video of our progress in Niger is available at https://www.youtube.com/watch?v=ITl8r104-MA .

About Global Atomic

Global Atomic Corporation ( www.globalatomiccorp.com ) is a publicly listed company that provides a unique combination of high-grade uranium mine development and cash-flowing zinc concentrate production.

The Company's Uranium Division is currently developing the fully permitted, large, high grade Dasa Deposit, discovered in 2010 by Global Atomic geologists through grassroots field exploration.  The "First Blast Ceremony" occurred on November 5, 2022 , and commissioning of the processing plant is scheduled for Q1, 2026.  Global Atomic has also identified 3 additional uranium deposits in Niger that can be advanced with further assessment work.

Global Atomic's Base Metals Division holds a 49% interest in the Befesa Silvermet Turkey, S.L. (BST) Joint Venture, which operates a modern zinc recycling plant, located in Iskenderun, Türkiye. The plant recovers zinc from Electric Arc Furnace Dust (EAFD) to produce a high-grade zinc oxide concentrate which is sold to zinc smelters around the world. The Company's joint venture partner, Befesa Zinc S.A.U. (Befesa) holds a 51% interest in and is the operator of the BST Joint Venture.  Befesa is a market leader in EAFD recycling, with approximately 50% of the European EAFD market and facilities located throughout Europe , Asia and the United States of America .

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS:

The information in this release may contain forward-looking information under applicable securities laws.  Forward-looking information includes, but is not limited to, statements with respect to completion of any financings; Global Atomics' development potential and timetable of its operations, development and exploration assets; Global Atomics' ability to raise additional funds necessary; the future price of uranium; the estimation of mineral reserves and resources; conclusions of economic evaluation; the realization of mineral reserve estimates; the timing and amount of estimated future production, development and exploration; cost of future activities; capital and operating expenditures; success of exploration activities; mining or processing issues; currency exchange rates; government regulation of mining operations; and environmental and permitting risks.   Generally, forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "is expected", "estimates", variations of such words and phrases or statements that certain actions, events or results "could", "would", "might", "will be taken", "will begin", "will include", "are expected", "occur" or "be achieved".  All information contained in this news release, other than statements of current or historical fact, is forward-looking information.   Statements of forward-looking information are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Global Atomic to be materially different from those expressed or implied by such forward-looking statements, including but not limited to those risks described in the annual information form of Global Atomic and in its public documents filed on SEDAR from time to time.

Forward-looking statements are based on the opinions and estimates of management at the date such statements are made.  Although management of Global Atomic has attempted to identify important factors that could cause actual results to be materially different from those forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended.  There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.  Accordingly, readers should not place undue reliance upon forward-looking statements.  Global Atomic does not undertake to update any forward-looking statements, except in accordance with applicable securities law.  Readers should also review the risks and uncertainties sections of Global Atomics' annual and interim MD&As.

The Toronto Stock Exchange has not reviewed and does not accept responsibility for the adequacy and accuracy of this news release.

Global Atomic - TSX 30 - OTX 50 (CNW Group/Global Atomic Corporation)

SOURCE Global Atomic Corporation

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/February2025/12/c0271.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Positive Uranium Leach Test Results at Lo Herma

Positive Uranium Leach Test Results at Lo Herma

GTI Energy (GTR:AU) has announced Positive Uranium Leach Test Results at Lo Herma

Download the PDF here.

Nuclear reactors.

Uranium Boom: Experts See Stock Opportunities as Strong Demand Meets Supply Gap

After rising 190 percent over the last five years, the uranium spot price and the broader uranium market remain poised for further growth, fueled by short supply and a slew of positive demand catalysts.

At this year's Vancouver Resource Investment Conference (VRIC), panelists Rick Rule, Nick Hodge, Fabi Lara and Jordan Trimble offered an overview of key market catalysts, both for the near term and long term.

Moderated by Jesse Day of Commodity Culture, the discussion started with a look at the state of the sector.

Keep reading...Show less

Latest Press Releases

Related News

×