Skyharbour Commences its 2025 Drilling Campaign with Winter Drilling Program at its Russell Lake Uranium Project, Saskatchewan

Skyharbour Commences its 2025 Drilling Campaign with Winter Drilling Program at its Russell Lake Uranium Project, Saskatchewan

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQX: SYHBF ) (Frankfurt: SC1P ) ("Skyharbour" or the "Company") is pleased to announce the commencement of its winter phase of diamond drilling at the 73,314 hectare Russell Lake Uranium Project ("Russell" or the "Project"). The Project is 57.7% owned by Skyharbour as operator with joint-venture partner Rio Tinto Exploration Canada Inc. ("RTEC") owning the other 42.3%. It is strategically located in the central core of the Eastern Athabasca Basin of northern Saskatchewan, with access to regional infrastructure, including an all-weather road and powerline. Skyharbour plans to complete an initial 5,000-metre diamond drilling program in 10 to 12 holes at the project, building on the successful results from the drilling campaign completed last year. The Company's geologists, along with a contracted drilling crew, are based at Skyharbour's exploration camp on the McArthur River-Key Lake haul road, situated within five kilometres of Denison Mines' Phoenix deposit at the Wheeler River Project.

Russell Lake and Moore Projects Location Map:  
https://www.skyharbourltd.com/_resources/images/SKY_RussellLake.jpg

Skyharbour is fully-funded for its upcoming drill programs at its co-flagship Russell Lake and Moore Uranium Projects in 2025 starting with this first phase of drilling at Russell. The Company has plans to drill approx. 16,000 – 18,000 metres in 35 – 45 holes across its co-flagship projects representing the largest annual drill campaign ever carried out by the Company.

Jordan Trimble, President and CEO of Skyharbour, stated: "We are thrilled to commence the 2025 drill campaign which will consist of 16-18,000 metres in multiple phases of drilling at Russell and Moore throughout the year. This will provide steady news flow as we follow up on the 2024 programs with the benefit of low-cost drilling and relatively shallow target depths at our co-flagship projects. This first phase of drilling at Russell will continue to test the exploration upside at the project, which hosts widespread uranium mineralization and has the geology necessary for larger, high-grade, Athabasca Basin uranium deposits."

Winter Phase of Diamond Drilling at Russell Lake:

Skyharbour has commenced its 2025 drilling program at the Russell Lake Project with plans for a first phase consisting of approx. 5,000 metres to follow up on notable recent exploration success and to test new targets developed by the geological team . The focus for this phase of drilling will be on the Fork and Sphinx targets within the broader Grayling target area, as well as the M-Zone Extension ("MZE") target and the Fox Lake Trail target. This initial winter program will consist of 10 to 12 drill holes, with most of the targets being road accessible and near the exploration camp, bringing the drill costs down. Furthermore, details on the geochemical assay results are pending from the drilling carried out in late 2024 at Russell.

Russell Lake Project Target Areas:  
https://www.skyharbourltd.com/_resources/images/20240110-MainTargetsRussellLake2024.jpg

The Fork target is a newly identified target to the southwest of the Grayling Zone and is on strike with Denison's M-Zone at their adjacent Wheeler River Project. Last year, high-grade uranium was discovered at the Fork target in hole RSL24-02, which returned a 2.5-metre wide intercept of 0.721% U 3 O 8 at a relatively shallow depth of 338.1 metres, including approx. 3.0% U 3 O 8 over 0.5 metres just above the unconformity in the sandstone (see news release dated July 19 th , 2024, titled: "Skyharbour Drills New Discovery at Russell Project with High-Grade Uranium Mineralization Up to 3.0% U 3 O 8 at Newly Identified Fork Zone"). This high-grade intercept is a new discovery which had very limited historical exploration due to a lack of reliable geophysical data and drill targets hampered by interference from nearby powerlines. The mineralization remains open in most directions, including along strike and up-dip, and will be a high-priority target for this drill program. The potential for basement-hosted mineralization at the Fork target remains virtually untested.

Grayling and Fork Target Areas:  
https://skyharbourltd.com/_resources/images/2024-Fork-East-Grayling-Drill-Hole-Location-Map_NR.jpg

Skyharbour also plans to drill targets in the M-Zone Extension area along trend from the Grayling Zone and Denison's M-Zone at Wheeler River, where historical drilling intersected basement-hosted uranium mineralization. More recent drilling by Denison in 2020 at the M-Zone encountered uranium mineralization with significant faulting, core loss, geochemical anomalies, and radioactivity encountered in other drill holes. Like the Grayling Zone, the mineralization at the MZE target is hosted by a graphitic thrust fault within a significant magnetic low. It is also noted that cross structures associated with Denison's Phoenix and Gryphon uranium deposits potentially trend onto the Russell Lake property within the M-Zone Extension target area, further enhancing the prospectivity of this target.

M-Zone Extension Drill Targets:  
https://www.skyharbourltd.com/_resources/images/20240110-M-ZoneExtensionTargetsRussellLake.jpg

The Fox Lake Trail ("FLT") area is located in the northwestern section of the Russell Lake project. This area encompasses a broad conductive corridor with a strike length exceeding 12 km, which hosts multiple parallel conductors identified by both airborne and ground geophysical surveys, subsequently confirmed by drilling, as graphitic fault zones. Limited historical drilling in the area shows significant alteration and disruption in both sandstone and basement rocks, along with elevated radioactivity and highly anomalous pathfinder geochemistry in drill core samples. These findings indicate the presence of a significant hydrothermal system in the area, which is often associated with the formation of high-grade, unconformity-type uranium deposits in the Athabasca Basin.

Skyharbour to Participate in Red Cloud's 13th Annual Pre-PDAC Mining Showcase:

Skyharbour is pleased to announce that the Company will be presenting at Red Cloud's 13th Annual Pre-PDAC Mining Showcase. We invite our shareholders, and all interested parties to join us. The annual conference will take place in-person at The Omni King Edward Hotel in Toronto on February 27 th and 28 th , 2025. President and CEO Jordan Trimble will be presenting on February 28 th at 10:00AM Eastern Standard time.

For more information and to register for the conference please visit:
https://redcloudfs.com/prepdac2025/ .

Russell Lake Uranium Project Overview:

The Russell Lake Project is a large, advanced-stage uranium exploration property totalling 73,314 hectares strategically located between Cameco's Key Lake and McArthur River Projects, and adjoining Denison's Wheeler River Project to the west and Skyharbour's Moore Uranium Project to the east. The northern extension of Highway 914 between Key Lake and McArthur River runs through the western extent of the property and greatly enhances accessibility, while a high-voltage powerline is situated alongside this road. Skyharbour's acquisition of a majority interest in Russell Lake creates a large, nearly contiguous block of highly prospective uranium claims totalling 109,019 hectares between the Russell Lake and the Moore uranium projects. Several notable exploration targets exist on Russell, including the Grayling Zone, the M-Zone Extension target, the Little Man Lake target, the Christie Lake target, the Fox Lake Trail target and the newly identified Fork Zone target. More than 35 kilometres of largely untested prospective conductors in areas of low magnetic intensity also exist on the Property. Skyharbour is the operator and owns a majority interest in Russell Lake, having formed a joint venture partnership with RTEC at the project.

Qualified Person:

The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed and approved by Serdar Donmez, P.Geo., VP of Exploration for Skyharbour as well as a Qualified Person.

About Skyharbour Resources Ltd.:

Skyharbour holds an extensive portfolio of uranium exploration projects in Canada's Athabasca Basin and is well positioned to benefit from improving uranium market fundamentals with interest in thirty-six projects covering over 614,000 hectares (over 1.5 million acres) of land. Skyharbour has acquired from Denison Mines, a large strategic shareholder of the Company, a 100% interest in the Moore Uranium Project, which is located 15 kilometres east of Denison's Wheeler River project and 39 kilometres south of Cameco's McArthur River uranium mine. Moore is an advanced-stage uranium exploration property with high-grade uranium mineralization in several zones at the Maverick Corridor. Adjacent to the Moore Project is the Russell Lake Uranium Project, in which Skyharbour is operator with joint-venture partner RTEC. The project hosts widespread uranium mineralization in drill intercepts over a large property area with exploration upside potential. The Company is actively advancing these projects through exploration and drilling programs.

Skyharbour also has joint ventures with industry leader Orano Canada Inc., Azincourt Energy, and Thunderbird Resources at the Preston, East Preston, and Hook Lake Projects, respectively. The Company also has several active earn-in option partners, including CSE-listed Basin Uranium Corp. at the Mann Lake Uranium Project; TSX-V listed North Shore Uranium at the Falcon Project; UraEx Resources at the South Dufferin and Bolt Projects; Hatchet Uranium at the Highway Project; CSE-listed Mustang Energy at the 914W Project; and TSX-V listed Terra Clean Energy at the South Falcon East Project. In aggregate, Skyharbour has now signed earn-in option agreements with partners that total to over $36 million in partner-funded exploration expenditures, over $20 million worth of shares being issued, and $14 million in cash payments coming into Skyharbour, assuming that these partner companies complete their entire earn-ins at the respective projects.

Skyharbour's goal is to maximize shareholder value through new mineral discoveries, committed long-term partnerships, and the advancement of exploration projects in geopolitically favourable jurisdictions.

Skyharbour's Uranium Project Map in the Athabasca Basin:  
https://www.skyharbourltd.com/_resources/images/SKY_SaskProject_Locator_2024-11-21_v1.jpg

To find out more about Skyharbour Resources Ltd. (TSX-V: SYH) visit the Company's website at www.skyharbourltd.com .

Skyharbour Resources Ltd.

"Jordan Trimble"
_________________________________
Jordan Trimble
President and CEO

For further information contact myself or:
Nicholas Coltura
Investor Relations Manager
Skyharbour Resources Ltd.
‎Telephone: 604-558-5847
‎Toll Free: 800-567-8181
‎Facsimile: 604-687-3119
‎Email: info@skyharbourltd.com

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

Forward-Looking Information

This news release contains "forward‐looking information or statements" within the meaning of applicable securities laws, which may include, without limitation, completing ongoing and planned work on its projects including drilling and the expected timing of such work programs, other statements relating to the technical, financial and business prospects of the Company, its projects and other matters. All statements in this news release, other than statements of historical facts, that address events or developments that the Company expects to occur, are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which the Company will operate in the future, including the price of uranium, the ability to achieve its goals, that general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed and on reasonable terms. Such forward-looking information reflects the Company's views with respect to future events and is subject to risks, uncertainties and assumptions, including the risks and uncertainties relating to the interpretation of exploration results, risks related to the inherent uncertainty of exploration and cost estimates and the potential for unexpected costs and expenses, and those filed under the Company's profile on SEDAR+ at www.sedarplus.ca. Factors that could cause actual results to differ materially from those in forward looking statements include, but are not limited to, continued availability of capital and financing and general economic, market or business conditions, adverse weather or climate conditions, failure to obtain or maintain all necessary government permits, approvals and authorizations, failure to obtain or maintain community acceptance (including First Nations), decrease in the price of uranium and other metals, increase in costs, litigation, and failure of counterparties to perform their contractual obligations. The Company does not undertake to update forward‐looking statements or forward‐looking information, except as required by law.


Primary Logo

News Provided by GlobeNewswire via QuoteMedia

SYH:CA
Skyharbour Resources

Skyharbour Resources Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Skyharbour Resources (TSXV:SYH)

Skyharbour Resources


Keep reading...Show less

Pre-eminent uranium explorer and prospect generator in Canada’s Athabasca Basin

Skyharbour Partner Company Terra Clean Energy Completes First Three Drill Holes on Fraser Lakes Uranium Deposit at the South Falcon East Uranium Project

Skyharbour Partner Company Terra Clean Energy Completes First Three Drill Holes on Fraser Lakes Uranium Deposit at the South Falcon East Uranium Project

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQX: SYHBF ) (Frankfurt: SC1P ) ( " Skyharbour " or the " Company ") is pleased to announce that partner company Terra Clean Energy Corp. ("Terra", previously Tisdale Clean Energy) has completed its first three drill holes at the South Falcon East Uranium Project (the "Property") which hosts the Fraser Lakes B Uranium Deposit. The program will continue throughout March and is expected to consist of over 2,000 metres of drilling. The South Falcon East Project lies 18 km outside the edge of the Athabasca Basin, approximately 50 km East of the Key Lake uranium mill and former mine. Skyharbour optioned the Project to Terra and under the Option Agreement assuming the 75% interest is earned, Terra will fund exploration expenditures totaling CAD $10,500,000, as well as pay Skyharbour CAD $11,100,000 in cash of which $6,500,000 can be settled for shares in the capital of Terra over the earn-in period.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Skyharbour's Partner North Shore Provides Exploration Update at Falcon Uranium Project

Skyharbour's Partner North Shore Provides Exploration Update at Falcon Uranium Project

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQX: SYHBF ) (Frankfurt: SC1P ) ("Skyharbour" or the "Company"), is pleased to announce that its partner company, North Shore Uranium ("North Shore"), has provided an update on its Falcon property ("Falcon") regarding the prioritization of target generation efforts. Falcon is located at the eastern margin of the Athabasca Basin in northern Saskatchewan. In its September 17, 2024, October 10, 2024, and November 13, 2024 news releases, North Shore summarized work being done at the West Bear and Falcon properties with three priority areas established at Falcon, Zones 1, 2 and 3. North Shore may acquire an initial 80% interest in Falcon by issuing common shares having an aggregate value of CAD $1,225,000, making aggregate cash payments of $525,000 to Skyharbour, and incurring an aggregate of $3,550,000 in exploration expenditures on the property over a three-year period.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Skyharbour Partner Company Terra Clean Energy Begins Extensive Drill Program at the South Falcon East Uranium Project

Skyharbour Partner Company Terra Clean Energy Begins Extensive Drill Program at the South Falcon East Uranium Project

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQX: SYHBF ) (Frankfurt: SC1P ) ( " Skyharbour " or the " Company ") is pleased to announce that partner company Terra Clean Energy Corp. ("Terra", previously Tisdale Clean Energy) has announced the mobilization of crew and equipment at the South Falcon East Uranium Project which hosts the Fraser Lakes B Uranium Deposit. The South Falcon Project lies 18km outside the edge of the Athabasca Basin, approximately 50 km East of the Key Lake uranium mill and former mine. Skyharbour optioned the Project to Terra and under the Option Agreement assuming the 75% interest is earned, Terra will fund exploration expenditures totaling CAD $10,500,000, as well as pay Skyharbour CAD $11,100,000 in cash of which $6,500,000 can be settled for shares in the capital of Terra ("Shares") over the five-year earn-in period.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Skyharbour Announces Closing of Option and Purchase Agreements with Hatchet Uranium for Several of its Uranium Projects Located in the Athabasca Basin

Skyharbour Announces Closing of Option and Purchase Agreements with Hatchet Uranium for Several of its Uranium Projects Located in the Athabasca Basin

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQX: SYHBF ) (Frankfurt: SC1P ) ("Skyharbour" or the "Company"), is pleased to announce that, further to its news release dated November 4 th 2024, closing has occurred on the option agreement (the "Agreement") with Hatchet, whereby Hatchet Uranium Corp. ("Hatchet") may acquire an 80% interest in the Company's 17,606 ha Highway Uranium Property (the "Optioned Property") and a 100% interest, subject to a claw-back provision for Skyharbour, in the Company's Genie, Usam and CBXShoe Uranium Projects (the "Purchased Property"). The properties total 66,358 ha and are all located in the Athabasca Basin of Northern Saskatchewan, Canada. The Agreement on the Optioned Property provides Hatchet an opportunity to earn an 80% interest in the claims over a three-year period by fulfilling combined cash, share issuance and exploration expenditure commitments of CAD $3,345,000. For the Purchased Property, Skyharbour will also receive units in the capital of Hatchet consisting of a share and a warrant ("Hatchet Units") equal to 9.9% of the issued and outstanding shares of Hatchet.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Skyharbour and JV Partner Orano Announces Extensive Exploration and Drilling Program in 2025 at Preston Uranium Project

Skyharbour and JV Partner Orano Announces Extensive Exploration and Drilling Program in 2025 at Preston Uranium Project

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQX: SYHBF ) (Frankfurt: SC1P ) ("Skyharbour" or the "Company"), is pleased to announce that its joint-venture partner, Orano Canada Inc. ("Orano"), is planning a substantial 2025 exploration and drilling program at the 49,635 hectare Preston Uranium Project ("Preston" or the "Property") located in the western Athabasca Basin, Saskatchewan, Canada. The drilling program will consist of approximately 6,000 to 7,000 metres of drilling during the summer of 2025. Orano is the majority owner and operator at the project with Skyharbour owning a minority interest of approximately 25.6%.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Purepoint Uranium Commences Initial Drill Program Along Groomes Lake Conductive Corridor, Smart Lake JV Project

Purepoint Uranium Commences Initial Drill Program Along Groomes Lake Conductive Corridor, Smart Lake JV Project

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) ("Purepoint" or the "Company") is pleased to announce the commencement of a first-pass drill program along the high-priority Groomes Lake Conductive Corridor at the Smart Lake Joint Venture (JV) project in Saskatchewan's Athabasca Basin. The program will include four drill holes, totalling approximately 1,400 metres, to test the conductive belt of rocks refined by the 2024 ground electromagnetic (EM) survey.

The Smart Lake Project is a joint venture between Cameco Corporation (73%) and Purepoint (27%) and is located approximately 60 km south of the former Cluff Lake uranium mine and 18 km west-northwest of Purepoint's Hook Lake JV project.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
SOURCE ROCK ROYALTIES ANNOUNCES RECORD ANNUAL ROYALTY PRODUCTION & REVENUE

SOURCE ROCK ROYALTIES ANNOUNCES RECORD ANNUAL ROYALTY PRODUCTION & REVENUE

/NOT FOR DISTRIBUTION TO U.S. NEWS WIRE SERVICES OR DISSEMINATION IN THE U.S./

Source Rock Logo (CNW Group/Source Rock Royalties Ltd.)

Source Rock Royalties Ltd. ("Source Rock") (TSXV: SRR), a pure-play oil and gas royalty company with an established portfolio of oil royalties, announces unaudited (1) operational and financial highlights for fiscal 2024 and the fourth quarter of 2024 ("Q4 2024"). Annual royalty production and revenue were the highest results in Source Rock's 12-year history.

Unaudited (1) annual results for fiscal 2024 were:

  • Royalty Production - 251 boe/d (95% oil & NGLs), an increase of 21% compared to 2023.

  • Royalty Revenue - $7.68 million , an increase of 16% compared to 2023.

Unaudited (1) results for Q4 2024 were:

  • Royalty Production - 256 boe/d (97% oil & NGLs), an increase of 17% compared to Q4 2023.

  • Royalty Revenue - $1.87 million , an increase of 9% compared to Q4 2023.

Audited Annual and Q4 2024 Financial Statements and Management Discussion and Analysis, as well as oil and gas reserves information as of December 31, 2024, will be filed on SEDAR+ ( www.sedarplus.ca ) and announced by news release on or before April 30, 2025.

President's Message

2024 was a record year for Source Rock as a result of acquisitions completed in 2023 and record drilling activity. In 2024, 43 new horizontal wells began producing on our royalty lands: 20 Frobisher wells in S.E. Saskatchewan , 18 Clearwater wells in central Alberta , 3 Viking wells in west-central Saskatchewan , 1 Dina well in east-central Alberta and 1 Amaranth well in Manitoba .

Source Rock's working capital as of February 28, 2025 was approximately $5 million ( $0.11 per share), a 120% increase from February 2024 . We are actively pursuing additional accretive royalty acquisitions with the goal of expanding and diversifying our base royalty production, as well as increasing exposure to undeveloped royalty lands and ongoing drilling activity. We continue to be focused on acquiring high netback oil royalties.

Brad Docherty , President & CEO

About Source Rock Royalties Ltd.

Source Rock is a pure-play oil and gas royalty company with an existing portfolio of oil royalty interests concentrated in southeast Saskatchewan , central Alberta and west-central Saskatchewan . Source Rock targets a balanced growth and yield business model, using funds from operations to pursue accretive royalty acquisitions and to pay dividends. By leveraging its niche industry relationships, Source Rock identifies and acquires both existing royalty interests and newly created royalties through collaboration with industry partners. Source Rock's strategy is premised on maintaining a low-cost corporate structure and achieving a sustainable and scalable business, measured by growing funds from operations per share and maintaining a strong netback on its royalty production.

www.sourcerockroyalties.com

(1)

Unaudited Information: All financial information contained in this news release for the year ended and fourth quarter of December 31, 2024, such as royalty revenue, is based on estimated unaudited financial information which has been disclosed in accordance with generally accepted accounting principles in Canada and has not been reviewed by Source Rock's auditor. These estimated results are subject to change upon completion of the audited financial statements for the year ended December 31, 2024, and changes could be material. Source Rock anticipates filing its audited financial statements and related management's discussion and analysis for the year ended December 31, 2024 on SEDAR+ on or before April 30, 2025.

Forward-Looking Statements

This news release includes forward-looking statements and forward-looking information within the meaning of Canadian securities laws. Often, but not always, forward-looking information can be identified by the use of words such as "plans", "is expected", "expects", "scheduled", "intends", "contemplates", "anticipates", "believes", "proposes" or variations (including negative and grammatical variations) of such words and phrases, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking statements in this news release include statements regarding Source Rock's dividend strategy and the amount and timing of future dividends (and the sustainability thereof), the potential for future drilling on Source Rock's royalty lands, expectations regarding commodity prices, Source Rock's growth strategy and expectations with respect to future royalty acquisition and partnership opportunities, the ability to complete such acquisitions and establish such partnerships, and the estimated costs for Source Rock to run its business. Such statements and information are based on the current expectations of Source Rock's management and are based on assumptions and subject to risks and uncertainties. Although Source Rock's management believes that the assumptions underlying these statements and information are reasonable, they may prove to be incorrect. The forward-looking events and circumstances discussed in this news release may not occur by certain dates or at all and could differ materially as a result of known and unknown risk factors and uncertainties affecting Source Rock. Although Source Rock has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements and information, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended. No forward-looking statement or information can be guaranteed. Except as required by applicable securities laws, forward-looking statements and information speak only as of the date on which they are made and Source Rock undertakes no obligation to publicly update or revise any forward-looking statement or information, whether as a result of new information, future events or otherwise.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy of this release.

SOURCE Source Rock Royalties Ltd.

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/March2025/10/c0058.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
GoviEx Uranium Files Feasibility Study for Muntanga Uranium Project

GoviEx Uranium Files Feasibility Study for Muntanga Uranium Project

GoviEx Uranium Inc. (TSXV: GXU) (OTCQB: GVXXF) ("GoviEx" or "the Company") is pleased to announce the filing of a Feasibility Study ("FS") for its Muntanga Uranium Project ("Muntanga" or "the Project") in Zambia. The FS, prepared in accordance with National Instrument 43-101 ("NI 43-101"), represents a significant milestone in the advancement of Muntanga as one of the few near-term uranium projects positioned to address the growing supply deficit in the nuclear fuel market.

The technical report titled, "NI 43-101 Technical Report: Muntanga Uranium Project in the Southern Province of Zambia" , dated March 7, 2025, has been filed under GoviEx's profile on SEDAR+ (www.sedarplus.ca) and is also available on the Company's website www.goviex.com.

Feasibility Study Highlights:

Solid Project Economics

  • After tax NPV8% of USD 243 million1
  • Internal rate of return (IRR) of 20.8%
  • Operating costs of USD 32.2 /lb U3O8
  • Significant leverage to higher uranium prices, with an additional USD 45 million added to NPV for every USD 5 /lb increase in U3O8 prices
  • Production averaging 2.2 million pounds U3O8 per annum over 12 years
  • LOM of 12 years based on Probable Mineral Reserves in two deposits, and further potential for upgrading Inferred Resources, exploration, and mining of three satellite deposits

Low Technical Risk

  • Shallow open pit mine and heap leaching with industry-standard, conventional processing methods
  • Excellent local infrastructure with road access, water and grid power
  • Well-established export routes through Namibia; able to supply Western and non-Western markets
  • No tailings storage required, reducing the environmental impact

Cost-Efficient Operations

  • Soft rock reduces powder factor and lowers mining costs
  • Optimized ore processing: High liberation of minerals; only requires crushing to 25 mm for agglomeration
  • LOM average recovery rates of at least 90% with rapid uranium recoveries within 21 days from start of heap irrigation
  • Low acid consumption, averaging less than 16.5 kg H₂SO₄ per tonne of ore treated, with Zambia's position as a net surplus acid producer ensuring reliable local supply
  • Low energy requirements: Soft rock minimizes crushing costs, with a total grid power draw requirement of just 7 MWp
  • Quick start up: uranium production expected within 4 months of mining
  • Rapid payback estimated at 3.8 years from start of production

Daniel Major, CEO of GoviEx Uranium said,

"The FS confirms Muntanga as a robust, shallow open-pit, heap leach operation in a mining-friendly jurisdiction, with an after-tax NPV of USD 243 million and an IRR of 20.8%. The Project is highly leveraged to uranium prices, adding USD 45 million in NPV for every USD 5/lb increase in U₃O₈. We have already appointed financial advisers to assist the Company in securing funding, and with production targeted just two years after financing, I am looking forward to progressing with one of the few uranium projects that can help address the increasing uranium demand in a tight market."

With the Feasibility Study now completed, GoviEx will focus on securing project financing, evaluating options including debt, royalties, streaming, and offtake agreements. In this regard the Company announced on February 20, 2025, the appointment of Endeavour Financial as its financial advisor. The Company is also actively engaging with utilities and strategic partners to align with growing demand for uranium.

Qualified Persons

The scientific and technical information in this release has been reviewed and approved by:

Jacobus Johannes Lotheringen, B Eng (Mining Engineering), South African Institute of Mining and Metallurgy (SAIMM) - Member (Reg no 701237) and Professional Engineer registered at the Engineering Council of South Africa (ECSA) (Reg no 20030022), employed by Ukwazi Transaction Advisory (Pty) Ltd as a principal mining engineer, who is an independent Qualified Person under the terms of NI 43-101 for uranium deposits.

Robert J. Bowell, BSc (Geochemistry), Hons, PhD (Geochemistry), Royal Society of Chemistry - Chartered Chemist (Memb. no 332782), Professional Geologist for the province of Newfoundland and Labrador. (Reg no 10809), Geological Society of London - Chartered Geologist (Reg no 1007245), Institute of Mining, Metallurgy and Materials - Fellow, emploted by SRK Consulting (UK) Ltd as a principal geochemist.

Mr. Lotheringen and Dr. Bowell have reviewed, verified and approved the data disclosed in this news release.

Neither the TSX Venture Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility for the adequacy or accuracy of this release.

About GoviEx Uranium Inc.

GoviEx (TSXV: GXU) (OTCQB: GVXXF), is a mineral resource company focused on the exploration and development of uranium properties in Africa. GoviEx's principal objective is to become a significant uranium producer through the continued exploration and development of its mine-permitted Muntanga Project in Zambia.

Contact Information

Isabel Vilela, Head of Corporate Communications
Daniel Major, Chief Executive Officer
Tel: +1-604-681-5529 Email: info@goviex.com Web: www.goviex.com

Disclaimers & Cautionary Statements

This news release does not contain all the information that may be required to evaluate, and does not constitute a recommendation with respect to, any transaction or matter. Any recipient of this news release should conduct their own independent analysis of the matters referred to herein.

Cautionary Statement Regarding Forward-Looking Statements

This news release may contain forward-looking information within the meaning of applicable securities laws. All information and statements other than statements of current or historical facts contained in this news release are forward-looking information.

Forward-looking statements are subject to various risks and uncertainties concerning the specific factors disclosed here and elsewhere in GoviEx's periodic filings with Canadian securities regulators. When used in this news release, words such as "will", "could", "plan", "estimate", "expect", "intend", "may", "potential", "should," and similar expressions, are forward- looking statements. Information provided in this document is necessarily summarized and may not contain all available material information.

Forward-looking statements include those in relation to, (i) the Company's ability in securing funding for the development of the Project; (ii) Muntanga being one of the few uranium projects that can help address the increasing uranium demand in a tight market; (iii) the strength of the Project and its ability to deliver good economic results; (iv) the focus of the Company going forward on securing project financing, evaluating options including debt, royalties, streaming, and offtake agreements (v) that FS will advance the Project towards Project financing and development; (vi) the method and timing of any development and mining operations at the Project; (vii) the continued engagement program with utilities and potential strategic partners to align with growing demand for uranium; and (viii) Muntanga emerging as one of the few near-term uranium projects capable of helping to address the uranium supply gap with an excellent potential to supply both Western and Chinese markets.

Although the Company believes the expectations reflected in such forward-looking statements are based on reasonable assumptions, it can give no assurances that its expectations will be achieved. Such assumptions, which may prove incorrect, include the following: (i) that the current uranium upcycle will continue and expand; (iii) that the integration of nuclear power into power grids world-wide will continue as a clean energy alternative; (iv) Zambia continuing to be a mining-friendly jurisdiction promoting the development of other critical minerals, such as uranium; and (v) that the price of uranium will remain sufficiently high and the costs of advancing the Company's mining projects will remain sufficiently low so as to permit GoviEx to implement its business plans in a profitable manner. Factors that could cause actual results to differ materially from expectations include: (i) a regression in the uranium market price; (iii) inability or unwillingness of include or increase nuclear power generation by major markets; (iv) potential delays due to potential new health restrictions; (v) the failure of the Company's projects, for technical, logistical, labour-relations, political or other reasons; (vi) a decrease in the price of uranium below what is necessary to sustain the Company's operations; (vii) an increase in the Company's operating costs above what is necessary to sustain its operations; (viii) accidents, labour disputes, or the materialization of similar risks; (ix) a deterioration in capital market conditions that prevents the Company from raising the funds it requires on a timely basis; (x) political instability in the jurisdictions where the Company operates; (xi) the Company not being able to secure acceptable financing for the Project; and (xii) generally, the Company's inability to develop and implement a successful business plan for any reason. In addition, the factors described or referred to in the section entitled "Risk Factors" in the MD&A for the year ended December 31, 2023, as well as the Annual Information Form for the year ended December 31, 2023, of GoviEx, which are available on the SEDAR+ website at www.sedarplus.ca, should be reviewed in conjunction with the information found in this news release. Although GoviEx has attempted to identify important factors that could cause actual results, performance, or achievements to differ materially from those contained in the forward- looking statements, there can be other factors that cause results, performance, or achievements not to be as anticipated, estimated, or intended. There can be no assurance that such information will prove to be accurate or that management's expectations or estimates of future developments, circumstances, or results will materialize. As a result of these risks and uncertainties, no assurance can be given that any events anticipated by the forward-looking information in this news release will transpire or occur, or, if any of them do so, what benefits that GoviEx will derive therefrom. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements in this news release are made as of the date of this news release, and GoviEx disclaims any intention or obligation to update or revise such information, except as required by applicable law.

Cautionary Note to United States Persons:

The disclosure contained herein does not constitute an offer to sell or the solicitation of an offer to buy securities of GoviEx.

Safe Harbor Statement under the United States Private Securities Litigation Reform Act of 1995: Except for the statements of historical fact contained herein, the information presented constitutes "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements including but not limited to those referenced above collectively as "forward-looking statements" under the "Cautionary Statement Regarding Forward-Looking Information" involve known and unknown risks, uncertainties and other factors which may cause the actual results, the performance or achievements of GoviEx to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. There can be no assurance that such statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Nuclear Fuels Acquires TenSleep Uranium Project with Athabasca Basin-Style Mineralization in Wyoming's Powder River Basin

Nuclear Fuels Acquires TenSleep Uranium Project with Athabasca Basin-Style Mineralization in Wyoming's Powder River Basin

CSE:NF
OTCQX:NFUNF

Nuclear Fuels Inc. (CSE: NF) (OTCQX: NFUNF) ("Nuclear Fuels" or the "Company") announced today the acquisition of the TenSleep Uranium Project, located approximately 10 miles (16 kilometers) west of the town of Kaycee in Johnson County Wyoming.  The TenSleep Project is a unique uranium project in Wyoming displaying geological characteristics similar to the deposits in Saskatchewan's prolific Athabasca Basin rather than the typical roll front sandstone-hosted uranium deposits of the United States. Athabasca or "unconformity" uranium deposits occur along the contact of two different rock types in the vicinity of one or more high-angle faults providing the pathway for the mineralizing fluids to deposit uranium along the contact. These deposits are typically larger and higher grade than roll-front types. The Company is currently developing an exploration program with drilling planned for late 2025 or early 2026.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Forum Energy Metals to Attend PDAC Convention March 2nd- 5th

Forum Energy Metals to Attend PDAC Convention March 2nd- 5th

 Forum Energy Metals Corp. (TSXV: FMC) (OTCQB: FDCFF) ("Forum" or the "Company") will be attending the Prospectors and Developers Association of Canada's ("PDAC") Convention at the Metro Toronto Convention Centre, at Booth 2825 from Sunday March 2 to Wednesday March 5. Rick Mazur, President & CEO and Dr. Rebecca Hunter, Vice-President Exploration will be available to discuss the recently released drill results from the Company's Aberdeen Uranium project in Nunavut, Canada as well as plans for the upcoming 2025 exploration program. Allison Rippon-Armstrong, Vice-President Nunavut Affairs, and Richard Aksawnee, Manager of Nunavut Affairs will also be available to discuss our community relations outreach programs in Nunavut and upcoming events in the region.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Skyharbour Resources

Skyharbour Resources Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×