New High-Grade Cobalt-Nickel Discovered at Michael Lake

(TheNewswire)



Hole grades 2.08% Co and 3.58% Ni over 4.5 metres within broader interval

UEX Corporation (TSX:UEX ) ( OTC:UEXCF) ("UEX" or the "Company") is pleased to announce that a new zone of cobalt-nickel mineralization was intersected at Michael Lake with the fourth hole of its 2021 winter uranium-cobalt exploration drill program on the West Bear Property (see Figure 1) . Drill hole MIC-004 intersected mineralization that grades 0.52% Co and 1.01% Ni over 23.5 m from 44.0 to 67.5 m within intensely altered basement rocks. Two separate subintervals within this mineralized zone returned assay grades of 2.08% Co and 3.58% Ni over 4.5 m (from 46.5 m to 51.0 m) and 0.93% Co and 0.79% Ni over 3.5 m (from 54.5 m to 58.0 m). The mineralization in MIC-004 occurs at a relatively shallow depth, from about 38 to 58 m below the surface and is located approximately 7 km east-northeast of the West Bear Cobalt-Nickel Deposit along the eastern flank of the prospective West Bear Dome (See Figure 2

Table 1 - Assay Results from Drill Hole MIC-004 at Michael Lake on the West Bear Project

Hole

Depth

Core Length

Cobalt

Nickel

From (m)

To (m)

(m*)

(wt% t )

(wt% t )

MIC-004

44.0

67.5

23.5

0.52

1.01

including

46.5

51.0

4.5

2.08

3.58

including

54.5

58.0

3.5

0.93

0.79

* True widths are estimated to be >90% of core length

t Composite assays calculated using a cut-off grade of 0.023% CoEq where CoEq=Co%+(Ni%x0.2)

The actual dip of the mineralization has yet to be confirmed.  However, mineralized core lengths reported in this news release are expected to be greater than 90% of the core length based on core measurements and the dip of the drill hole.

In the Company's news release of January 27, 2021, UEX announced that Phase I of the Company's winter 2021 exploration drill program testing targets in the Michael Lake and Huggins Lake areas on the West Bear Project was underway.  The Michael Lake and Huggins Lake areas are considered prospective for both uranium and cobalt-nickel deposits in basement rocks. The Company has re-allocated resources from the other planned target areas on both the West Bear and Hidden Bay Projects scheduled for drilling testing during the winter drill program in order to further evaluate the potential of this exciting new high-grade unconformity related Cobalt-Nickel prospect.

The assay interval returned by hole MIC-004 is impressive both in its length and grade and is the second location of high-grade cobalt-nickel mineralization found to date on the West Bear Project.   To have encountered high grade cobalt-nickel mineralization at Michael Lake, being only the second target area drill tested by the Company on the prospective West Bear Dome, validates the approach and understanding our Exploration Team has developed to explore for this emerging and previously unknown style of cobalt-nickel deposit . We are excited to see what the potential is of the Michael Lake Target as we drill more holes in the area.

  • -- Roger Lemaitre, President & CEO

Sample Collection and Compositing

Samples for assaying are selected using a portable X-Ray Fluorescence ("XRF") Spectrometer to aid in the identification of mineralized intervals. Selected drill core is then split in half sections on site and one half is collected for analysis with the other half core remaining on site for reference. Where possible, samples are collected at a standardized 0.5 m interval through zones of mineralization but respect geological units and intervals.

The samples are shipped to the Geoanalytical Laboratory at the Saskatchewan Research Council ("SRC") in Saskatoon, Saskatchewan. Analysis at the SRC laboratory for Cobalt and Nickel was completed using the ICP-OES method with an Aqua Regia digestion. The SRC Geoanalytical Laboratory is an ISO/IEC 17025:2005 accredited facility (#537) by the Standards Council of Canada.

Assay intervals were composited using a cut-off grade of 0.023% Cobalt equivalent (CoEq) using the equation CoEq = Co + (Ni x 0.2). All depth measurements and sample intervals reported are down-hole measurements from drill core.

Qualified Persons and Data Acquisition

The technical information in this news release has been reviewed and approved by Roger Lemaitre, P.Eng., P.Geo., UEX's President and CEO, and Chris Hamel, P.Geo., UEX's Exploration Manager, who are each considered to be a Qualified Person as defined by National Instrument 43-101.

About the West Bear Cobalt-Nickel Project

The West Bear Property is an advanced exploration project located in the eastern Athabasca Basin of northern Saskatchewan, Canada that contains both the West Bear Cobalt-Nickel Deposit and the West Bear Uranium Deposit. The Property is approximately 740 kilometres north of Saskatoon, west of Wollaston Lake and measures approximately 11,104 hectares comprising of 27 contiguous areas to which UEX has 100% ownership, with the exception of Mineral Lease 5424 in which UEX owns a 77.575% interest. The Deposit is located within an area of the Athabasca Basin that has excellent infrastructure and is situated within 10 kilometres of an existing all-weather road and power lines that service Cameco Corporation's nearby Cigar Lake Mine and Rabbit Lake Operation, as well as Orano's McClean Lake Operation.

The West Bear Cobalt-Nickel Deposit currently has a strike length of over 600 metres and a dip length of over 100 metres. On April 15, 2020, the Company announced an updated indicated resource estimate for the Deposit of 1,223,000 tonnes grading 0.19% cobalt and 0.21% nickel, which equates to 5,122,000 pounds of cobalt and 5,662,000 pounds of nickel The West Bear Cobalt-Nickel Deposit mineral resources were determined using a cutoff grade of 0.023 percent cobalt equivalent ("CoEq"), using the equation CoEq = Co + (Ni x 0.2).

About UEX

UEX (TSX:UEX, OTCQB:UEXCF, UXO.F) is a Canadian uranium and cobalt exploration and development company involved in an exceptional portfolio of uranium projects, including a number that are 100% owned and operated by UEX, one joint venture with Orano Canada Inc. ("Orano") and ALX Uranium Corp. ("ALX") that is 51.43% owned by UEX, as well as eight joint ventures with Orano, one joint venture with Orano and JCU (Canada) Exploration Company Limited, which are operated by Orano, and one project (Christie Lake), that is 65.55% owned by UEX with JCU (Canada) Exploration Company Limited which is operated by UEX.

The Company is also leading the discovery of cobalt in Canada, with three cobalt-nickel exploration projects located in the Athabasca Basin of northern Saskatchewan, including the only primary cobalt deposit in Canada.  The 100% owned West Bear Project was formerly part of UEX's Hidden Bay Project and contains the West Bear Cobalt-Nickel Deposit and the West Bear Uranium Deposit.  UEX also owns 100% of two early stage cobalt exploration projects, the Axis Lake and Key West Projects.

Our portfolio of projects is located in the eastern, western and northern perimeters of the Athabasca Basin, the world's richest uranium belt, which in 2019 accounted for approximately 12.6% of the global primary uranium production.  UEX is currently advancing several uranium deposits in the Athabasca Basin which include the Christie Lake deposits, the Kianna, Anne, Colette and 58B deposits at its currently 49.1%-owned Shea Creek Project (located 50 kilometres north of Fission's Triple R Deposit and Patterson Lake South Project, and NexGen's Arrow Deposit), the Horseshoe and Raven deposits located on its 100%-owned Horseshoe-Raven Development Project and the West Bear Uranium Deposit located at its 100%-owned West Bear Project.

FOR FURTHER INFORMATION PLEASE CONTACT

Roger Lemaitre

President & CEO

(306) 979-3849

Forward-Looking Information

This news release contains statements that constitute "forward-looking information" for the purposes of Canadian securities laws. Such statements are based on UEX's current expectations, estimates, forecasts and projections. Such forward-looking information includes statements regarding the West Bear Co-Ni Property, the Christie Lake Property drill program, the Hidden Bay Property, the Shea Creek Property, UEX's drill hole results, uranium, cobalt and nickel prices, outlook for our future operations, plans and timing for exploration activities, and other expectations, intentions and plans that are not historical fact. Such forward-looking information is based on certain factors and assumptions and is subject to risks, uncertainties and other factors that could cause actual results to differ materially from future results expressed or implied by such forward-looking information. Important factors that could cause actual results to differ materially from UEX's expectations include uncertainties relating to the, interpretation of drill results and geology, assay confirmation, additional drilling results, continuity and grade of deposits, fluctuations in uranium, cobalt and nickel prices and currency exchange rates, changes in environmental and other laws affecting uranium, cobalt and nickel exploration and mining, and other risks and uncertainties disclosed in UEX's Annual Information Form and other filings with the applicable Canadian securities commissions on SEDAR. Many of these factors are beyond the control of UEX. Consequently, all forward-looking information contained in this news release is qualified by this cautionary statement and there can be no assurance that actual results or developments anticipated by UEX will be realized. For the reasons set forth above, investors should not place undue reliance on such forward-looking information. Except as required by applicable law, UEX disclaims any intention or obligation to update or revise forward-looking information, whether as a result of new information, future events or otherwise.


Click Image To View Full Size

Copyright (c) 2021 TheNewswire - All rights reserved.

News Provided by TheNewsWire via QuoteMedia

The Conversation (0)
  Boss Energy

2024 Infill Drilling on Satellite Uranium Growth Deposits Complete

Resource update underway in preparation for bringing significant satellite deposits into the mine plan

Boss Energy Limited (ASX: BOE; OTCQX: BQSSF) is pleased to announce the conclusion of a successful infill drilling program at the Gould's Dam and Jason's satellite deposits within its Honeymoon Uranium project in South Australia.

Keep reading...Show less

NexGen Achieves Major Permitting Milestone

  • The Canadian Nuclear Safety Commission ("CNSC") has notified NexGen of successful completion of final Federal technical review.
  • This is the key requirement to scheduling a Federal Commission Hearing date and subsequent Federal Project approval decision.
  • The Federal Environmental Assessment ("EA") and License represent the final major approval steps after having received Provincial EA approval in November 2023 .
  • In production, the Rook I Project is poised to make NexGen one of the world's largest and most environmentally conscious mining companies.

NexGen Energy Ltd. ("NexGen" or the "Company") (TSX: NXE) (NYSE: NXE) (ASX: NXG) is excited and proud to announce a major milestone in the Federal EA process for its 100%owned Rook I Project ("the Project"). The CNSC has provided NexGen formal confirmation that the Company has successfully addressed all information requests received as part of the Federal technical review. With completion of the CNSC technical review, the next and final steps in the Federal approval process include scheduling a Commission Hearing Date for the Project, subject to which the CNSC will render an approval decision on the Project.

NexGen Energy Ltd. Logo (CNW Group/NexGen Energy Ltd.)

This historic milestone marks a crucial step forward for the Project that has been undergoing Canada's robust and rigorous regulatory process since 2019. Completion of the Federal EA technical review stage follows the CNSC having deemed NexGen's Federal licence application sufficient in September 2023 , and receipt of Provincial EA approval in November 2023 . This development reinforces Canada's path to re-establish itself as the leader in global uranium supply and partner of choice.

Leigh Curyer, Chief Executive Officer, commented: "This exciting outcome is a testament to the exceptional efforts of our entire NexGen team, the collaborative support of our valued Indigenous Nation partners, and our transparent approach with the CNSC to ensure a robust and thorough review that meets the highest standards of environmental protection for the sustainable development of the Rook I Project. Since inception, our honest and innovative holistic approach to the successful development of this generational project has set new industry standards as to what is possible, whilst positively impacting all our valued stakeholders.

Together with the Clearwater River Dene Nation, Métis Nation – Saskatchewan Northern Region 2 and Métis Nation – Saskatchewan , Buffalo River Dene Nation, and Birch Narrows Dene Nation, we are construction ready to deliver transformative and unprecedented social, economic and environmental benefits to local communities, the Province of Saskatchewan, Canada , and the world.

We're not just developing a mine - we're building strong communities while shaping a sustainable and secure global energy future. With over $800 million in cash and liquid assets, we are ready pending a positive Commission decision with all activities required to immediately commence major site works in place."

NexGen is poised to propel Canada back to the forefront of global clean energy fuel production. The Rook I Project embodies NexGen's commitment to elite environmental performance, unprecedented community inclusion, and responsible alignment with global net-zero goals.

About NexGen

NexGen Energy is a Canadian company focused on delivering clean energy fuel for the future. The Company's flagship Rook I Project is being optimally developed into the largest, low-cost producing uranium mine globally, incorporating the most elite standards in environmental and social governance. The Rook I Project is supported by a NI 43-101 compliant Feasibility Study which outlines the elite environmental performance and industry leading economics. NexGen is led by a team of experienced uranium and mining industry professionals with expertise across the entire mining life cycle, including exploration, financing, project engineering and construction, operations, and closure. NexGen is leveraging its proven experience to deliver a Project that leads the entire mining industry socially, technically, and environmentally. The Project and prospective portfolio in northern Saskatchewan will provide generational long-term economic, environmental, and social benefits for Saskatchewan, Canada , and the world.

NexGen is listed on the Toronto Stock Exchange and the New York Stock Exchange under the ticker symbol "NXE," and on the Australian Securities Exchange under the ticker symbol "NXG," providing access to global investors to participate in NexGen's mission of solving three major global challenges in decarbonization, energy security, and access to power. The Company is headquartered in Vancouver, British Columbia , with its primary operations office in Saskatoon , Saskatchewan.

Cautionary Note to U.S. Investors

This news release includes Mineral Reserves and Mineral Resources classification terms that comply with reporting standards in Canada and the Mineral Reserves and the Mineral Resources estimates are made in accordance with NI 43-101. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. These standards differ from the requirements of the Securities and Exchange Commission ("SEC") set by the SEC's rules that are applicable to domestic United States reporting companies. Consequently, Mineral Reserves and Mineral Resources information included in this news release is not comparable to similar information that would generally be disclosed by domestic U.S. reporting companies subject to the reporting and disclosure requirements of the SEC Accordingly, information concerning mineral deposits set forth herein may not be comparable with information made public by companies that report in accordance with U.S. standards.

Forward-Looking Information

The information contained herein contains "forward-looking statements" within the meaning of applicable United States securities laws and regulations and "forward-looking information" within the meaning of applicable Canadian securities legislation. "Forward-looking information" includes, but is not limited to, statements with respect to estimates for CapEx, OpEx and a payback period of 12 months, the appointment of a lead lender group, the availability of financing for the Project, the advancement of detailed engineering and contract negotiations, bolstering the globe's uranium supply chains to meet the rising demand for nuclear energy, the timing and cost of reclamation, including as part of the UGTMF and after-tax free cash flow remaining materially consistent with the FS, Free Cash Flow, Payback Period and IRR relative to various uranium prices, the delivery of clean energy fuel for the future, the development of the largest low cost producing uranium mine globally and incorporating elite standards in environmental and social governance, delivering a project that leads the entire mining industry socially, technically and environmentally, providing generational long-term economic, environmental and social benefits for Saskatchewan, Canada and the world, planned exploration and development activities and budgets, the interpretation of drill results and other geological information, mineral reserve and resource estimates (to the extent they involve estimates of the mineralization that will be encountered if a project is developed), requirements for additional capital, capital costs, operating costs, cash flow estimates, production estimates, the future price of uranium and similar statements relating to the economics of a project, including the Rook I Project. Generally, forward-looking information and statements can be identified by the use of forward-looking terminology such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connotation thereof.

Forward-looking information and statements are based on NexGen's current expectations, beliefs, assumptions, estimates and forecasts about its business and the industry and markets in which it operates. Forward-looking information and statements are made based upon numerous assumptions, including, among others, that financing for the Project will be available in a timely manner and on terms acceptable to the Company, the results of planned exploration and development activities will be as anticipated and on time; the price of uranium; the cost of planned exploration and development activities; that, as plans continue to be refined for the development of the Rook I Project, there will be no changes in costs, engineering details or specifications that would materially adversely affect its viability; that financing will be available if and when needed and on reasonable terms; that third-party contractors, equipment, supplies and governmental and other approvals required to conduct NexGen's planned exploration and development activities will be available on reasonable terms and in a timely manner; that there will be no revocation of government approvals; that general business, economic, competitive, social and political conditions will not change in a material adverse manner; the assumptions underlying the Company's mineral reserve and resource estimates and updated/revised CapEx, OpEx, SusEx, and pay back period; assumptions made in the interpretation of drill results and other geological information; the ability to achieve production on the Rook I Project; and other estimates, assumptions and forecasts disclosed in the Feasibility Study for the Rook I Project. Although the assumptions made by the Company in providing forward-looking information or making forward-looking statements were considered reasonable by management at the time they were made, there can be no assurance that such assumptions will prove to be accurate.

Forward-looking information and statements also involve known and unknown risks and uncertainties and other factors, which may cause actual results, performances and achievements of NexGen to differ materially from any projections of results, performances and achievements of NexGen expressed or implied by such forward-looking information or statements, including, among others, negative operating cash flow and dependence on third-party financing, uncertainty of additional financing, the risk that pending assay results will not confirm previously announced preliminary results, the imprecision of mineral reserve and resource estimates, the price and appeal of alternate sources of energy, sustained low uranium prices, aboriginal title and consultation issues, development risks, climate change, uninsurable risks, reliance upon key management and other personnel, risks related to title to its properties, information security and cyber threats, failure to manage conflicts of interest, failure to obtain or maintain required permits and licences, changes in laws, regulations and policy, competition for resources, political and regulatory risks, general inflationary pressures, industry and economic factors that may affect the business, and other factors discussed or referred to in the Company's most recent Annual Information Form under "Risk Factors" and management's discussion and analysis under "Other Risks Factors" filed on SEDAR+ at www.sedarplus.ca and 40-F filed on Edgar at www.sec.gov   .

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or statements or implied by forward-looking information or statements, there may be other factors that cause results not to be as anticipated, estimated or intended.

There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers are cautioned not to place undue reliance on forward-looking information or statements due to the inherent uncertainty thereof. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/nexgen-achieves-major-permitting-milestone-302309673.html

SOURCE NexGen Energy Ltd.

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/November2024/19/c8458.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
The word "uranium" beside green up arrow.

Russia Restricts US Uranium Exports, Retaliating to American Ban

The Russian government has imposed temporary restrictions on enriched uranium exports to the US.

Announced on November 15, the move follows the US' decision toban imports of Russian uranium.

While the US legislation went into effect in August, it allows for waivers to address potential supply disruptions through 2027. The new Russian policy introduces uncertainty during this time period.

Keep reading...Show less

Foremost Clean Energy Announces Strategic Engagement with Red Cloud Financial Services

Foremost Clean Energy Ltd. ( NASDAQ: FMST ) ( CSE: FAT ) (" Foremost " or the " Company "), an emerging North American uranium and lithium exploration company, is pleased to announce today that it has entered into a strategic agreement (the " Agreement ") with Red Cloud Financial Services Inc. (" RCFS" or " Red Cloud "), an arms-length independent contractor, to provide promotional services, including advice on marketing, communications and social media activities. Under the engagement, Red Cloud will be paid a fee of $10,000 per month effective October 14, 2024, for a twelve-month term which automatically renews month-to-month thereafter unless either party provides written notice of termination to the other party thirty (30) days prior to the date of termination.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Nuclear reactors and a stock chart.

US Plans to Triple Nuclear Power Capacity by 2050

The Biden administration has announced a strategic roadmap to significantly expand the United States' nuclear energy capacity, setting a target to triple capacity by 2050.

In a new nine pillar framework, the Biden-Harris administration has laid out its plans to add 200 gigawatts (GW) of new nuclear energy through new reactor builds, reactivations and upgrades to existing facilities.

The initiative seeks to meet a growing demand for reliable, carbon-free power as the nation transitions away from fossil fuels and toward cleaner energy sources.

Keep reading...Show less
Red graph and arrow pointing down.

Paladin Cuts Uranium Production Forecast, Share Price Declines

Shares of Paladin Energy (ASX:PDN,OTCQX:PALAF) declined this week after the company shared an update on its Langer Heinrich mine and revised its 2025 fiscal year production guidance.

The company now expects the mine to produce 3 million to 3.6 million pounds of U3O8, lower than its earlier prediction of 4 million to 4.5 million pounds. According to Paladin, the drop is the result of lower-than-expected output in October, which was caused by water supply disruptions, as well as continued variability in stockpiled ore.

Production from Langer Heinrich amounted to 186,667 pounds during the month.

Keep reading...Show less

Latest Press Releases

Related News

×