Highlights

  • Most recent 2021 annual production guidance was achieved for all metals. Production of 262,884 t of copper was above the midpoint of guidance and an increase of 14% over 2020. Zinc production of 143,797 t was above the midpoint of guidance and an increase over the prior year. Gold production of 167,000 oz exceeded annual guidance.
  • Candelaria copper production of 151,719 t achieved guidance and gold production of 91,000 oz exceeded guidance. Fourth quarter operations were particularly strong, producing 45,573 t of copper and 26,000 oz of gold, the most since the third quarter of 2017. With focus on operational practices, the positive trend of improvement in grade discrepancy continued progressively each month in the fourth quarter and averaged approximately 4%.
  • Chapada copper production of 52,019 t exceeded guidance and gold production of 76,000 oz achieved the top end of annual guidance. The state of Goiás and regions around Chapada have experienced greater than typical precipitation during the rainy season in 2022. Chapada is managing the rainfall well and continues to operate safely.
  • Eagle achieved strong and consistent operating performance again in 2021. Nickel production of 18,353 t and copper production of 18,419 t both achieved annual guidance.
  • Neves-Corvo copper production of 37,941 t achieved the top end of annual guidance and zinc production of 66,031 t was within 1kt of guidance. Fourth quarter operations were the strongest of the year. Construction of the Zinc Expansion Project (ZEP), to double current zinc production capacity and improve per unit operating cost, was substantially completed at the end of 2021 with the commencement of commissioning of the mine materials handling system and the expanded zinc processing plant.
  • Zinkgruvan production of 77,766 t of zinc exceeded annual production guidance.
  • Continuing the trend of annual improvement, Lundin Mining achieved a new best-ever Total Recordable Injury Frequency (TRIF) rate in 2021 with a rate of 0.54 per 200,000 person hours worked. This excellent safety result was realized during a year that saw an increase in our operational activities, particularly project related activities at the Neves-Corvo ZEP, and during a period of continuing stressors and distractions stemming from the ongoing COVID-19 pandemic.

Summary of 2021 Production



Q4 2021

Production


Full Year 2021

Production


2021 Production

Guidance 1


Copper (t)













Candelaria (100% basis)

45,573


151,719


150,000

-

155,000



Chapada

14,870


52,019


48,000

-

50,000



Eagle

3,636


18,419


18,000

-

20,000



Neves-Corvo

12,100


37,941


36,000

-

38,000



Zinkgruvan

817


2,786


3,000

-

4,000



Total Copper

76,996


262,884


255,000

-

267,000
















Zinc (t)














Neves-Corvo

18,750


66,031


67,000

-

70,000



Zinkgruvan

18,080


77,766


73,000

-

76,000



Total Zinc

36,830


143,797


140,000

-

146,000












Gold (oz)










Candelaria (100% basis)

26,000


91,000


85,000

-

90,000



Chapada

20,000


76,000


73,000

-

76,000



Total Gold

46,000


167,000


158,000

-

166,000
















Nickel (t)














Eagle

4,101


18,353


18,000

-

20,000



Total Nickel

4,101


18,353


18,000

-

20,000


Fourth Quarter and Full Year 2021 Results Date

Results for the fourth quarter and full year ended December 31, 2021 will be published on Thursday February 17, 2022.

The Company will hold a telephone conference call and webcast at 08:00 ET , 14:00 CET on Friday February 18, 2022. Conference call details are provided below. Please call in 10 minutes before the conference starts.

Call-in number for the conference call ( North America ): +1 647 788 4922
Call-in number for the conference call (North America Toll Free): +1 877 223 4471
Call-in number for the conference call ( Sweden ): 02 00 123 522

To view the live webcast presentation, please log on using this direct link: https://onlinexperiences.com/Launch/QReg/ShowUUID=5FC47C1B-ED4D-4F01-B238-3CEBD68F4298 .

The presentation slideshow will also be available in PDF format on the Lundin Mining website www.lundinmining.com before the conference call.

A replay of the telephone conference will be available after the completion of the call until March 18, 2022.

_____________________________________

1 Guidance as most recently disclosed in the Company's Management Discussion and Analysis for the three and nine months ended September 30, 2021.

Call-in numbers for the replay are ( North America ): +1 800 585 8367 or +1 416 621 4642

The passcode for the replay is: 8270928

A replay of the webcast will be available by clicking on the direct link above.

About Lundin Mining

Lundin Mining is a diversified Canadian base metals mining company with operations in Brazil , Chile , Portugal , Sweden and the United States of America , primarily producing copper, zinc, gold and nickel.

The information in this release is subject to the disclosure requirements of Lundin Mining under the EU Market Abuse Regulation. The information was submitted for publication, through the agency of the contact persons set out below on January 14, 2022 at 02:00 Eastern Time .

Cautionary Statement on Forward-Looking Information

Certain of the statements made and information contained herein is "forward-looking information" within the meaning of applicable Canadian securities laws. All statements other than statements of historical facts included in this document constitute forward-looking information, including but not limited to statements regarding the Company's plans, prospects and business strategies; the Company's guidance on the timing and amount of future production and its expectations regarding the results of operations; expected costs; permitting requirements and timelines; timing and possible outcome of pending litigation; the results of any Preliminary Economic Assessment, Feasibility Study, or Mineral Resource and Mineral Reserve estimations, life of mine estimates, and mine and mine closure plans; anticipated market prices of metals, currency exchange rates, and interest rates; the development and implementation of the Company's Responsible Mining Management System; the Company's ability to comply with contractual and permitting or other regulatory requirements; anticipated exploration and development activities at the Company's projects; and the Company's integration of acquisitions and any anticipated benefits thereof. Words such as "believe", "expect", "anticipate", "contemplate", "target", "plan", "goal", "aim", "intend", "continue", "budget", "estimate", "may", "will", "can", "could", "should", "schedule" and similar expressions identify forward-looking statements.

Forward-looking information is necessarily based upon various estimates and assumptions including, without limitation, the expectations and beliefs of management, including that the Company can access financing, appropriate equipment and sufficient labor; assumed and future price of copper, nickel, zinc, gold and other metals; anticipated costs; ability to achieve goals; the prompt and effective integration of acquisitions; that the political environment in which the Company operates will continue to support the development and operation of mining projects; and assumptions related to the factors set forth below. While these factors and assumptions are considered reasonable by Lundin Mining as at the date of this document in light of management's experience and perception of current conditions and expected developments, these statements are inherently subject to significant business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements and undue reliance should not be placed on such statements and information. Such factors include, but are not limited to: risks inherent in mining including but not limited to risks to the environment, industrial accidents, catastrophic equipment failures, unusual or unexpected geological formations or unstable ground conditions, and natural phenomena such as earthquakes, flooding or unusually severe weather; uninsurable risks; global financial conditions and inflation; changes in the Company's share price, and volatility in the equity markets in general; volatility and fluctuations in metal and commodity prices; the threat associated with outbreaks of viruses and infectious diseases, including the COVID-19 virus; changing taxation regimes; reliance on a single asset; delays or the inability to obtain, retain or comply with permits; risks related to negative publicity with respect to the Company or the mining industry in general; health and safety risks; exploration, development or mining results not being consistent with the Company's expectations; unavailable or inaccessible infrastructure and risks related to ageing infrastructure; actual ore mined and/or metal recoveries varying from Mineral Resource and Mineral Reserve estimates, estimates of grade, tonnage, dilution, mine plans and metallurgical and other characteristics; risks associated with the estimation of Mineral Resources and Mineral Reserves and the geology, grade and continuity of mineral deposits including but not limited to models relating thereto; ore processing efficiency; community and stakeholder opposition; information technology and cybersecurity risks; potential for the allegation of fraud and corruption involving the Company, its customers, suppliers or employees, or the allegation of improper or discriminatory employment practices, or human rights violations; regulatory investigations, enforcement, sanctions and/or related or other litigation; uncertain political and economic environments, including in Brazil and Chile ; risks associated with the structural stability of waste rock dumps or tailings storage facilities; estimates of future production and operations; estimates of operating, cash and all-in sustaining cost estimates; civil disruption in Chile ; the potential for and effects of labor disputes or other unanticipated difficulties with or shortages of labor or interruptions in production; risks related to the environmental regulation and environmental impact of the Company's operations and products and management thereof; exchange rate fluctuations; reliance on third parties and consultants in foreign jurisdictions; climate change; risks relating to attracting and retaining of highly skilled employees; compliance with environmental, health and safety laws; counterparty and credit risks and customer concentration; litigation; risks inherent in and/or associated with operating in foreign countries and emerging markets; risks related to mine closure activities and closed and historical sites; changes in laws, regulations or policies including but not limited to those related to mining regimes, permitting and approvals, environmental and tailings management, labor, trade relations, and transportation; internal controls; challenges or defects in title; the estimation of asset carrying values; historical environmental liabilities and ongoing reclamation obligations; the price and availability of key operating supplies or services; competition; indebtedness; compliance with foreign laws; existence of significant shareholders; liquidity risks and limited financial resources; funding requirements and availability of financing; enforcing legal rights in foreign jurisdictions; dilution; risks relating to dividends; risks associated with acquisitions and related integration efforts, including the ability to achieve anticipated benefits, unanticipated difficulties or expenditures relating to integration and diversion of management time on integration; activist shareholders and proxy solicitation matters; and other risks and uncertainties, including but not limited to those described in the "Risk and Uncertainties" section of the Annual Information Form and the "Managing Risks" section of the Company's MD&A for the year ended December 31, 2020 , which are available on SEDAR at www.sedar.com under the Company's profile. All of the forward-looking statements made in this document are qualified by these cautionary statements. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated, forecast or intended and readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking information. Accordingly, there can be no assurance that forward-looking information will prove to be accurate and forward-looking information is not a guarantee of future performance. Readers are advised not to place undue reliance on forward-looking information. The forward-looking information contained herein speaks only as of the date of this document. The Company disclaims any intention or obligation to update or revise forward    looking information or to explain any material difference between such and subsequent actual events, except as required by applicable law.

Lundin Mining Announces 2021 Production Guidance Achieved for All Metals; Fourth Quarter and Full Year 2021 Results to be Released February 17, 2022 (CNW Group/Lundin Mining Corporation)

SOURCE Lundin Mining Corporation

Cision View original content to download multimedia: https://www.newswire.ca/en/releases/archive/January2022/14/c0481.html

News Provided by Canada Newswire via QuoteMedia

LUN:CA,LUNMF
The Conversation (0)
Copper wire.

Lobo Tiggre: Copper is My Highest-Confidence Trade for 2025 — Here's Why

Lobo Tiggre, CEO of IndependentSpeculator.com, gave the Investing News Network his updated thoughts on the US economy, as well as his outlook for gold, silver and uranium in 2025.

However, he said his highest-confidence trade for next year is copper.

"I think that it's easier to see — and highly likely to see — copper moving higher next year," Tiggre explained.

Keep reading...Show less
Large chunk of copper.

29Metals Shares Feasibility Study and Final Investment Decision for Gossan Valley Project

29Metals (ASX:29M) has announced a feasibility study and final investment decision for the Gossan Valley project at its Golden Grove volcanic-hosted massive sulphide mine in Western Australia.

The feasibility study is an update to the 2022 version of the document. It outlines production of 4,000 tonnes of copper and 20,000 tonnes of zinc annually at Gossan Valley over an initial mine life of seven years.

CEO James Palmer said the development of Gossan Valley is the "next logical development option" when it comes to moving forward at Golden Grove, which was first discovered in 1971.

Keep reading...Show less
Somerset Minerals Logo

Acquisition of High-Grade Copper Project Adjacent to White Cliff Minerals

Somerset Minerals Ltd (“Somerset” or the “Company”) (ASX:SMM) is pleased to advise that it has entered into a conditional agreement to acquire 100% of the issued capital of Sentinel Resources Pty Ltd (“Sentinel”), which, through its local subsidiary, holds the Coppermine Project (the “Project”) in Nunavut, Canada.

Importantly, the Coppermine Project hosts 1,055 km2 of the prospective Copper Creek Formation basalts, and is interpreted to include the strike extensions to White Cliff’s high priory targets of Vision, Stark, Thor and Rocket (Figure 2 & 3), with the prospectivity of the wider project area also supported by extensive surface sampling and historic exploration (Table 1). Importantly, Somerset holds the ground entirely around and along strike from White Cliff’s recently acquired Danvers prospect which contains a non-JORC or NI 43-101 resource of 4.16Mt @ 2.96% Cu.

Keep reading...Show less
US$100 bills.

Lundin Mining to Divest Neves-Corvo and Zinkgruvan Operations for US$1.52 Billion

Lundin Mining (TSX:LUN,OTC Pink:LUNMF) has entered a definitive agreement to sell its Neves-Corvo operation in Portugal and Zinkgruvan operation in Sweden to Boliden (STO:BOL) for up to US$1.52 billion.

The sale, announced by the company on Monday (December 9), will see Boliden acquire full ownership of Somincor, the company operating Neves-Corvo, as well as Zinkgruvan Mining Aktiebolag and its associated entities.

Lundin expects to receive upfront cash consideration of US$1.37 billion at closing, based on financial conditions as of August 31, 2024. Interest will accrue at 5 percent annually until the closing date.

Keep reading...Show less

Lundin Mining Announces Sale of Neves-Corvo and Zinkgruvan for Total Consideration of up to $1.52 Billion

Lundin Mining logo (CNW Group/Lundin Mining Corporation)

TSX: LUN) (Nasdaq Stockholm: LUMI) Lundin Mining Corporation ("Lundin Mining" or the "Company") announces today it has signed a definitive agreement to sell its Neves-Corvo operation in Portugal and Zinkgruvan operation in Sweden to Boliden AB (OM: BOL) ("Boliden") for up to $1.52 billion in total consideration (the "Transaction"). Unless otherwise stated, all numbers are presented in United States dollars.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Business handshake.

Rio Tinto and Sumitomo Partner to Advance Winu Copper-Gold Project

Rio Tinto (ASX:RIO,NYSE:RIO,LSE:RIO) has signed a term sheet with Sumitomo Metal Mining (TSE:5713) for a joint venture to advance the Winu copper-gold project in Western Australia.

The partnership, announced on Wednesday (December 4), seeks to develop both companies’ exploration initiatives.

Sumitomo will acquire a 30 percent equity stake in the Winu project for US$399 million, including an initial payment of US$195 million and US$204 million in deferred considerations tied to project milestones and other conditions.

Keep reading...Show less

Latest Press Releases

Related News

×