CanAlaska Identifies Three Priority Targets at Key Extension Project

CanAlaska Identifies Three Priority Targets at Key Extension Project

New Gravity Targets Defined Along the Key Lake Fault Structure

Surface Samples With Up To 0.13% U

Planned Summer Work Program Includes Drilling Priority Targets

CanAlaska Uranium Ltd. (TSXV: CVV) (OTCQB: CVVUF) (FSE: DH7N) ("CanAlaska" or the "Company") is pleased to announce successful results from the new ground gravity geophysical survey at its Key Extension project (the "Project" - Figure 1). The survey has identified multiple gravity lows associated with interpreted structural corridors and domain boundaries in the southeast Athabasca Basin region, adjacent to the Key Lake uranium mine and milling complex.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/2864/120990_84273c7ca4ed9908_002.jpg

Figure 1 – Key Extension Property Map

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/2864/120990_84273c7ca4ed9908_002full.jpg

The most prominent gravity low anomaly is located at the intersection of two structural lineaments, the important boundary between the Wollaston and Mudjatik domains and the interpreted Key Lake Fault (Figure 2). A coincident historical north to northeast-trending VTEM conductor is mapped with this broad gravity low anomaly. The Key Lake fault is host to the Key Lake deposits and associated zones approximately 10 km from the northeastern project boundary. The Key Lake deposits consist of a series of southwest-northeast striking pods of unconformity associated uranium mineralization, which have historically produced over 150 million lbs U3O8 from the Gaertner and Deilmann open pits.

Two additional priority gravity anomalies are identified along strike in both directions from the main gravity anomaly associated with the interpreted Key Lake fault and the Wollaston-Mudjatik boundary location. This includes immediately to the northeast of the main anomaly where a gravity low is developed along the main Key Lake fault structure and a coincident conductor. West of this area, historical boulder and outcrop samples taken in the Orchid Lake area returned up to 0.13% U in weakly to strongly altered pegmatite boulders, some of which contained graphite (Figure 2). In addition, in the southwestern part of the survey area, where the Key Lake fault is interpreted to exist parallel to the Wollaston-Mudjatik boundary, a significant gravity low has been identified. This series of gravity low anomalies running through the project area associated with conductors and fault structures generate multiple high-priority target areas that will require drill testing.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/2864/120990_84273c7ca4ed9908_003.jpg

Figure 2Ground gravity survey results show multiple anomalies associated with structural corridors.

To view an enhanced version of Figure 2, please visit:
https://orders.newsfilecorp.com/files/2864/120990_84273c7ca4ed9908_003full.jpg

The ground gravity survey, consisting of 3,100 stations on 200 m x 50 m grid was completed in March by MWH Geophysics Ltd. Processing of the data resulted in the identification of several residual Bouguer anomalies corrected at 1.9 g/cm3, represented by several prominent gravity lows. Hydrothermal fluids associated with high-grade basement-hosted uranium deposits cause extensive clay alteration of the host rock, resulting in reduced density relative to the surrounding country rocks. This density contrast will be expressed as a gravity low and is a priority drill target when coincident with other indicators of uranium mineralization. Similar gravity lows are associated with recent discoveries of basement-hosted uranium deposits in the Athabasca Basin, most notably the discovery of the Arrow Uranium Deposit which is host to 337.4 million pounds U3O8 in measured, indicated, and inferred categories.

The Company is completing work on the Project under a Property Option Agreement with Durama Enterprises Limited ("Durama"), a private company, which allows CanAlaska to earn up to 100% interest in the Project (Figure 1) (See News Release Dated October 6th, 2021).

Planned Work Programs

Work permit applications have submitted to the Saskatchewan Ministry of Environment for a 2022 drilling program on the Key Extension project. A fully-permitted regional geological prospecting program is planned for the summer of 2022 in advance of the drilling program. In addition, the Company plans to complete a high-resolution airborne radiometrics survey and a re-interpretation of the historical VTEM survey data.

CanAlaska CEO, Cory Belyk, comments, "The results of this gravity survey and initial compilation work are incredibly encouraging and provide multiple drill targets for immediate follow-up along a previously untested portion of the prolific Key Lake structure. The presence of nearby historical uranium in boulders and outcrop highlight the potential of this property to host significant basement-hosted uranium mineralization. Multiple datasets are pointing directly to these three priority target areas which are likely to be the focus of CanAlaska's inaugural drill program at Key Extension."

About CanAlaska Uranium

CanAlaska Uranium Ltd. (TSXV: CVV) (OTCQB: CVVUF) (FSE: DH7N) holds interests in approximately 300,000 hectares (750,000 acres), in Canada's Athabasca Basin - the "Saudi Arabia of Uranium." CanAlaska's strategic holdings have attracted major international mining companies. CanAlaska is currently working with Cameco and Denison at two of the Company's properties in the Eastern Athabasca Basin. CanAlaska is a project generator positioned for discovery success in the world's richest uranium district. The Company also holds properties prospective for nickel, copper, gold and diamonds. For further information visit www.canalaska.com.

The qualified technical person for this news release is Nathan Bridge, MSc., P.Geo., CanAlaska's Vice President, Exploration.

On behalf of the Board of Directors

"Peter Dasler"
Peter Dasler, M.Sc.
President
CanAlaska Uranium Ltd.

Contacts:

Cory Belyk, Executive VP and CEO
Tel: +1.604.688.3211 x 306
Email: cbelyk@canalaska.com

Peter Dasler, President
Tel: +1.604.688.3211 x 138
Email: info@canalaska.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-looking information

All statements included in this press release that address activities, events or developments that the Company expects, believes or anticipates will or may occur in the future are forward-looking statements. These forward-looking statements involve numerous assumptions made by the Company based on its experience, perception of historical trends, current conditions, expected future developments and other factors it believes are appropriate in the circumstances. In addition, these statements involve substantial known and unknown risks and uncertainties that contribute to the possibility that the predictions, forecasts, projections and other forward-looking statements will prove inaccurate, certain of which are beyond the Company's control. Readers should not place undue reliance on forward-looking statements. Except as required by law, the Company does not intend to revise or update these forward-looking statements after the date hereof or revise them to reflect the occurrence of future unanticipated events.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/120990

News Provided by Newsfile via QuoteMedia

CVV:CA
CanAlaska Uranium

CanAlaska Uranium Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
CanAlaska Uranium (TSXV:CVV)

CanAlaska Uranium


Keep reading...Show less
CanAlaska Announces Mobilization To Moon Lake South For Drill Program

CanAlaska Announces Mobilization To Moon Lake South For Drill Program

Program is Focused on Testing Extensions of New High-Grade Uranium Mineralization

Two Drill Program Continues at Pike Zone Discovery on West McArthur JV Project

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
CanAlaska Stakes 11,143 Hectare Constellation Project in Eastern Athabasca Basin

CanAlaska Stakes 11,143 Hectare Constellation Project in Eastern Athabasca Basin

18 Kilometres of Priority Basement Uranium Target Corridors Identified

60 Kilometres from the Key Lake Uranium Mine and Mill

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
CanAlaska Announces Spinout of 5 Nickel Properties and other Assets and Sets Date for Annual General & Special Meeting

CanAlaska Announces Spinout of 5 Nickel Properties and other Assets and Sets Date for Annual General & Special Meeting

CanAlaska Uranium Ltd. (TSXV: CVV) (OTCQX: CVVUF) (FSE: DH7N) ("CanAlaska" or the "Company") is pleased to announce that its board of directors has unanimously approved a spinout of the Company's Halfway Lake, Resting Lake, Hunter, Odei River and Mel properties (collectively, the "Nickel Properties") totalling 36,174 hectares (Figure 1), and $1,000,000 cash (together with the Nickel Properties, the "Assets"), to its shareholders by way of a share capital reorganization effected through a statutory plan of arrangement (the "Arrangement"). Under the Arrangement, CanAlaska will transfer the Assets to its wholly-owned subsidiary, Core Nickel Corp. ("Core Nickel"), in consideration for approximately 25,000,000 Core Nickel common shares. The Core Nickel shares will then be distributed to CanAlaska's shareholders pro rata their interest in CanAlaska. Upon completion of the Arrangement, CanAlaska's shareholders will own shares in two reporting companies: Core Nickel, which will focus on developing the Nickel Properties, and CanAlaska, which will continue to retain an interest in over 25 separate property packages and will focus on the development of its uranium properties.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
CanAlaska Completes Key Extension Uranium Project Earn-In to Consolidate 100% Ownership

CanAlaska Completes Key Extension Uranium Project Earn-In to Consolidate 100% Ownership

Geochemical Assay Results Confirm Uranium Enrichment Present in Faults

Geikie Uranium Project Advancing to Stage 3 of Earn-In Agreement

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
CanAlaska Commences Airborne Gravity Survey at Geikie Project in Athabasca Basin

CanAlaska Commences Airborne Gravity Survey at Geikie Project in Athabasca Basin

Falcon Airborne Survey to Extend Existing Targets and Generate New Targets for Drilling

Two Drill Program Underway at Pike Zone Discovery on West McArthur JV Project

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
GTI Energy

Uranium Exploration Update And Carbon Neutral Certification

GTI Energy Ltd (ASX: GTR) (GTI or Company) provides the following activities update.

Keep reading...Show less
justin huhn, uranium periodic symbol

Justin Huhn: Uranium Facing "Supply Black Hole," Price Spike Likely

With aboveground mobile inventory now snapped up by the likes of the Sprott Physical Uranium Trust (TSX:U.U), Justin Huhn, founder and publisher at Uranium Insider, believes the uranium market has reached an inflection point.

"The only inventory that exists right now in the world is strategic — this is held by nuclear utilities, and their inventories historically speaking are relatively low, and by nation states," he said, adding that he sees a "supply black hole" emerging in the mid-term. That could have major consequences for prices moving forward, as well as for uranium equities.

"I honestly think at this point the likelihood of a price spike is very high," he told the Investing News Network in an interview. "It's entirely possible in the next year or two we see a spike, and it comes back down to incentive prices, and then we kind of continue on with the bull market. That's very likely to happen — that's what happened last time."

Keep reading...Show less

NexGen Closes US$110 Million Strategic Convertible Debenture Financing

NexGen Energy Ltd. ("NexGen" or the "Company") (TSX: NXE) (NYSE: NXE) (ASX: NXG) is pleased to announce that it has closed its previously announced non-brokered private placement (the " Offering ") of US$110 million aggregate principal amount of unsecured convertible debentures (the " Debentures ") with Queen's Road Capital Investment Ltd. (" QRC ") and Washington H Soul Pattinson and Company Limited (" WHSP ").

NexGen currently has cash reserves of C$330 million .

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
GTI Energy

GTI Enters Into At-The-Market Finance Facility

GTI Energy Ltd (ASX: GTR) (GTI or Company) is pleased to advise finalisation and entry into an At- the-Market (ATM) Financing Deed with 8 Equity Pty Ltd (Financier). The ATM facility provides the Company with up to $2,000,000 of standby equity capital over the coming 3-year term (Term).

Keep reading...Show less

Global Atomic Corporation Included in the TSX30

Global Atomic Corporation ("Global Atomic" or the "Company"), (TSX: GLO) (OTCQX: GLATF) (FRANKFURT: G12) is pleased to announce that the Company has been included on the Toronto Stock Exchange ("TSX") rankings for the 30 best stock price performances over the last three years. The TSX30, established in 2019, is an annual ranking of the 30 top-performing stocks over a three-year period ending June 30, 2023 based on share price appreciation.

Global Atomic President and CEO, Stephen G. Roman commented "We are very proud of our Team and the work we have done to advance the Dasa Project since its discovery in 2010. Receiving this acknowledgement from the Toronto Stock Exchange and being included in the TSX30 is a major recognition of all the hard work our Team has accomplished over the past 3 years advancing this world class asset. While more recent share price performance has reflected the uncertainty about the outcome of political issues in Niger , the fundamentals of the Dasa Project continue to improve as we advance our production milestones.  We are confident the Dasa Mine will soon become the highest-grade and lowest-cost uranium mine in Africa . We thank all shareholders who have supported us over the last three years and continued to do so during these recent events."

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
laptop with graph and the acronym "etf"

Uranium ETFs: An Emerging Market Opportunity (Updated 2023)

Exchange-traded funds (ETFs) are one of the fastest-growing investment vehicles, and as uranium's rebound continues to build, investors are becoming increasingly interested in uranium ETFs and related products.

The uranium spot price has climbed in Q2 and Q3 on supply risks and a bullish outlook for long-term demand. Whether it will continue to strengthen is uncertain, but those with a positive view of the market think it will happen — supporting factors include the lack of new uranium mines coming online, Russia’s dominance in uranium conversion and enrichment, rising demand for low-carbon energy sources and the continued development and deployment of small modular reactors.

There is also increasing demand for uranium from China and India as both these countries grapple with air pollution in the face of growing electricity demand. China is working to expand its nuclear power capacity, and although it ranks among the top 10 uranium-producing countries, the Asian nation relies heavily on uranium imports to meet its nuclear fuel demand.

Keep reading...Show less
CanAlaska Uranium

CanAlaska Uranium Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×