
February 04, 2025
Sitka Gold Corp. (TSXV: SIG) (FSE: 1RF) (OTCQB: SITKF) ("Sitka" or the "Company") is pleased to announce that preparations are currently underway for a winter diamond drilling program scheduled to begin this month at its flagship RC Gold Project ("RC Gold" or the "Project"), located in the prolific Tombstone Gold Belt in Yukon. The winter drilling campaign will mark the start of a fully funded 30,000 metre diamond drilling program planned for RC Gold this year.
The Company recently announced an updated mineral resource estimate ("MRE") at RC Gold of 1.3 million ounces of gold indicated and 1.5 million ounces of gold inferred (see news release dated January 21, 2025 and Table 1). The MRE includes updated gold resource estimates at its 100% owned Blackjack deposit comprised of an indicated resource of 1.29 million ounces at a grade of 1.01 g/t gold and an inferred resource of 1.04 million ounces at a grade of 0.94 g/t gold using a 0.30 g/t gold cut-off grade. The primary focus of drilling this year will be to continue upgrading and expanding the Blackjack deposit, which remains open in all directions, and further test gold mineralization within the Clear Creek Intrusive Complex (CCIC), including at the Eiger Deposit, which also remains open in all directions, and at the Saddle, Rhosgobel, Contact and Pukelman targets (see Figures 1 and 2). In late 2024, the Company completed the first ever diamond drill holes at Rhosgobel which significantly increased the depth of known gold mineralization at the target area with gold mineralization now extending from surface to a depth of at least 300 metres. Two holes were completed and returned multiple observations of visible gold and impressive intervals of strong gold mineralization with assays of up to 119.0 m of 1.05 g/t gold including 37.9 m of 2.05 g/t gold and 11.5 m of 4.32 g/t gold (see news release dated November 25, 2024).
"We are very excited to begin preparations for our 2025 diamond drilling program at RC Gold where we plan to get a significant jump on this year's drilling season with a winter drilling program", stated Cor Coe, Director and CEO of Sitka. "Since 2022, and with limited drilling, we have taken RC Gold from an initial discovery hole to a very impressive gold resource that has the potential to grow considerably. With 30,000 metres of drilling planned for 2025, which is more than double the total amount of drilling that we have completed to date at the Project, we are on track to rapidly advance RC Gold this year with significant expansion drilling at the Blackjack and Eiger deposits as well as follow up drilling at the other intrusion-related gold targets within the Clear Creek Intrusive Complex, including the Rhosgobel and Pukelman intrusions where drilling last year confirmed robust gold mineralization is present similar to that observed at the Blackjack deposit."
Figure 1 - Plan map showing the multiple high-priority target areas within the Clear Creek Intrusive Complex. 30,000 metres of drilling is planned in this area for 2025 with a proposed allocation of approximately 15,000 metres across the Blackjack - Eiger target area, 10,000 metres at Rhosgobel - Bear Paw and 5,000 metres at Pukelman.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6144/239538_5865d4ae54fad868_002full.jpg
Figure 2 - Long Section showing target areas from the Blackjack deposit to the Rhosgobel target and the proposed drilling allocated as part of the 30,000 metre diamond drilling program planned for 2025.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6144/239538_sitkafig2.jpg
About the flagship RC Gold Project
The RC Gold Project consists of a 431 square kilometre contiguous district-scale land package located in the heart of Yukon's Tombstone Gold Belt. The project is located approximately 100 kilometres east of Dawson City, which has a 5,000 foot paved runway, and is accessed via a secondary gravel road from the Klondike Highway which is usable year-round and is an approximate 2 hour drive from Dawson City. It is the largest consolidated land package strategically positioned mid-way between the Eagle Gold Mine and the past producing Brewery Creek Gold Mine.
The RC Gold Project now has pit-constrained mineral resources prepared in accordance with National Instrument 43-101 ("NI 43-101") guidelines that are contained in two zones: the Blackjack and Eiger deposits with 1,291,000 ounces of gold grading 1.01 g/t gold in an indicated category and 1,044,000 grading 0.94 g/t in an inferred category at Blackjack and 440,000 ounces grading 0.50 g/t gold in an inferred category at Eiger. Both of these deposits are at/near surface, are potentially open pit minable and amenable to heap leaching, with initial bottle roll tests indicating that the gold is not refractory and has high gold recoveries of up to 94% with minimal NaCN consumption (see News Release July 13, 2022). The Mineral Resource Estimate is presented in the following table:
Table 1: Current pit-constrained gold resources at the RC Gold Project*
Deposit | Gold Cut-off (g/t Au) | Mineral Resource Category | Tonnes (000's) | Gold Grade (Au g/t) | Oz Au (000's) |
Blackjack | 0.30 | Indicated | 39,962 | 1.01 | 1,291 |
Blackjack | 0.30 | Inferred | 34,603 | 0.94 | 1,044 |
Eiger | 0.25 | Inferred | 27,362 | 0.50 | 440 |
* For details of the resource estimate please see Company news release dated January 21, 2025.
To date, 72 diamond drill holes have been drilled into this system by the Company for a total of approximately 25,136 metres. Other targets drilled to date include the Saddle, Josephine, Rhosgobel and Pukelman zones. The resource expansion drilling in 2023 at Blackjack produced results of up to 219.0 m of 1.34 g/t gold Including 124.8 m of 2.01 g/t gold and 55.0 m of 3.11 g/t gold in drill hole DDRCCC-23-047 (see news release dated September 26, 2023) and in 2024 results of up to 678.1 metres of 1.04 g/t gold starting from surface in DDRCCC-24-068, Including 409.5 metres of 1.36 g/t gold, 93.0 metres of 2.57 g/t gold and 5.5 metres of 17.59 g/t gold (see news release dated October 21, 2024).
RC Gold Deposit Model
Exploration on the Property has mainly focused on identifying an intrusion-related gold system ("IRGS"). The property is within the Tombstone Gold Belt which is the prominent host to IRGS deposits within the Tintina Gold Province in Yukon and Alaska. Notable deposits from the belt include: Fort Knox Mine in Alaska with current Proven and Probable Reserves of 230 million tonnes at 0.3 g/t Au (2.471 million ounces; Sims 2018)(1); Eagle Gold Mine with current Measured and Indicated Resources of 233 million tonnes at a grade of 0.57 g/t Au at the Eagle Main Zone (4.303 million ounces; Harvey et al, 2022)(2); the Brewery Creek deposit with current Indicated Mineral Resource of 22.2 million tonnes at a gold grade of 1.11 g/t (0.789 million ounces; Hulse et al. 2020)(3); the Florin Gold deposit with a current Inferred Mineral Resource of 170.99 million tonnes grading 0.45 g/t (2.47 million ounces; Simpson 2021)(4); the AurMac Project with an Inferred Mineral Resource of 347.49 million tonnes grading 0.63 gram per tonne gold (7.00 million ounces)(5) and the Valley Deposit, with a current Indicated Mineral Resource of 4.05 million oz gold at 1.66 g/t and an additional Inferred Mineral Resource of 3.26 million oz at 1.25 g/t gold(6).
- Sims J. Fort Knox Mine Fairbanks North Star Borough, Alaska, USA National Instrument 43-101 Technical Report. June 11, 2018. https://s2.q4cdn.com/496390694/files/doc_downloads...
- Harvey N., Gray P., Winterton J., Jutras M., Levy M.,Technical Report for the Eagle Gold Mine, Yukon Territory, Canada. Victoria Gold Corp. December 31, 2022. https://vgcx.com/site/assets/files/6534/vgcx_-_202...
- Hulse D, Emanuel C, Cook C. NI 43-101 Technical Report on Mineral Resources. Gustavson Associates. May 31, 2020. https://minedocs.com/22/Brewery-Creek-PEA-01182022...
- Simpson R. Florin Gold Project NI 43-101 Technical Report. Geosim Services Inc. April 21, 2021. https://sedar.com/GetFile.do?lang=EN&docClass=24&i... d=4984158
- Thornton T., Jutras M., Malhotra D. Technical Report Aurmac Property Mayo Mining District, Yukon Territory, Canada. JDS Energy and Mining Inc. February 6, 2024. https://banyangold.com/site/assets/files/5251/bany...
- Burrell H., Redmond D.J., Haggarty P., Rogue Gold Project: NI 43-101 Technical Report and Mineral Resource Estimate, Yukon Territory, Canada. Snowline Gold Corp. May 15, 2024. https://snowlinegold.com
Upcoming Events
Sitka Gold will be attending and/or presenting at the following events*:
- PDAC - Toronto, ON: March 2 - 5, 2025
- Swiss Mining Institute - Zurich, Switzerland: March 18 - 19, 2025
- 121 Mining Investment - London, England: May 12 - 13, 2025
- Canaccord Global Metals and Mining Conference - Henderson, NV: May 20 - 22, 2025
- Yukon Mining Alliance - Dawson City, Yukon: July 9 - 14, 2025
*All events are subject to change.
About Sitka Gold Corp.
Sitka Gold Corp. is a well-funded mineral exploration company headquartered in Canada with approximately $15 million in its treasury and no debt. The Company is managed by a team of experienced industry professionals and is focused on exploring for economically viable mineral deposits with its primary emphasis on gold, silver and copper mineral properties of merit. Sitka is currently advancing its 100% owned, 431 square kilometre flagship RC Gold Project located within the Tombstone Gold Belt in the Yukon Territory. The Company is also advancing the Alpha Gold Project in Nevada and currently has drill permits for its Burro Creek Gold and Silver Project in Arizona and the Coppermine River Project in Nunavut.
*For more detailed information on the Company's properties please visit our website at www.sitkagoldcorp.com
The scientific and technical content of this news release has been reviewed and approved by Cor Coe, P.Geo., Director and CEO of the Company, and a Qualified Person (QP) as defined by National Instrument 43-101.
ON BEHALF OF THE BOARD OF DIRECTORS OF
SITKA GOLD CORP.
"Donald Penner"
President and Director
For more information contact:
Donald Penner
President & Director
778-212-1950
dpenner@sitkagoldcorp.com
or
Cor Coe
CEO & Director
604-817-4753
ccoe@sitkagoldcorp.com
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary and Forward-Looking Statements
This release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements relate to future events or future performance and reflect the expectations or beliefs of management of the Company regarding future events. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as "intends" or "anticipates", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should", "would" or "occur". This information and these statements, referred to herein as "forward‐looking statements", are not historical facts, are made as of the date of this news release and include without limitation, statements regarding discussions of future plans, estimates and forecasts and statements as to management's expectations and intentions and the Company's anticipated work programs.
These forward‐looking statements involve numerous risks and uncertainties and actual results might differ materially from results suggested in any forward-looking statements. These risks and uncertainties include, among other things, market uncertainty and the results of the Company's anticipated work programs.
Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward-looking information. Readers are cautioned that reliance on such information may not be appropriate for other purposes. The Company does not undertake to update any forward-looking statement, forward-looking information or financial out-look that are incorporated by reference herein, except in accordance with applicable securities laws. We seek safe harbor.
The Conversation (0)
10h
High grade gold in early stage drilling at Sandstone
11h
David Erfle: Silver Staging "Powerful" Breakout; Plus Gold Stocks and Copper Squeeze
David Erfle, editor and founder of Junior Miner Junky, shares his short-term outlook for gold, saying it could see a healthy test of US$3,200 per ounce — or even US$2,950 to US$3,000.
Erfle also shares his thoughts on what's coming for silver and copper prices.
Don't forget to follow us @INN_Resource for real-time updates!
Securities Disclosure: I, Charlotte McLeod, hold no direct investment interest in any company mentioned in this article.
Keep reading...Show less
11h
Meeka Metals Reports First Gold Pour at Murchison Project
Meeka Metals (ASX:MEK) has poured the first gold at its flagship Murchison project in Western Australia.
The pour happened on Tuesday (July 1), and in a Wednesday (July 2) press release, the company said the project’s production is in line with schedule, happening within 12 months of breaking ground.
Murchison sits near several multimillion-ounce gold mines and hosts a large, high-grade resource of 1.2 million ounces at 3 grams per tonne (g/t) gold on granted mining leases.
Meeka released a definitive feasibility study in December 2024, outlining a 10 year production plan for the project. Up to 76,000 ounces per annum are targeted, with an average of 65,000 ounces approximated for the first seven years.
The study also focused on restarting the Andy Well mill, with site activity commencing during Q1 2025. Process plant commissioning followed in the next quarter, with the first gold pour following its projected schedule of mid 2025.
“It is an impressive achievement by the team to deliver first gold on time and within 12 months of breaking ground at the Murchison,” said Managing Director Tim Davidson. “We are now focused on ramping up gold production toward our targeted 80 kilo ounces per annum with the arrival of the third dig fleet and expanded open pit mining plan underway.”
Drilling at Turnberry Central, part of Murchison, was announced on June 10. Results include 30 metres at 1.09 g/t gold from 29 meters, including 9 meters at 2.45 g/t gold.
The company announced in mid-June that process plant commissioning was underway at Murchison.
Underground mining at Murchison’s Andy Well mill is set to begin in the third quarter of 2025. As per a company presentation shared by Meeka on June 19, Andy Well hosts a mineral resource of 505,000 ounces at 8.6 g/t gold.
First ore from Andy Well is expected in the third quarter of this year.
Don’t forget to follow us @INN_Australia for real-time news updates!
Securities Disclosure: I, Gabrielle de la Cruz, hold no direct investment interest in any company mentioned in this article.
Keep reading...Show less
12h
Sun Summit Minerals
Investor Insight
Sun Summit Minerals is targeting the delineation of a multi-million-ounce gold-silver resource at its flagship JD project. With strategic positioning in an emerging consolidation hotspot, compelling valuation metrics, and a track record of discovery, Sun Summit is primed to deliver substantial value creation in the coming quarters.
Overview
Sun Summit Minerals (TSXV:SMN,OTCQB:SMREF) is a Canadian mineral exploration company focused on developing its district-scale gold and copper projects in British Columbia. The company’s flagship JD Project, located in the Toodoggone district, is undergoing an aggressive 5,000-meter drill campaign in 2025 aimed at delineating a multi-million-ounce epithermal gold-silver system.
Complementing JD is the company’s Buck project, a large, bulk-tonnage gold-silver system near Houston, BC, with an initial NI 43-101 resource estimate and significant exploration upside.
With capital in hand, a five-year exploration permit secured, and a camp established at JD, Sun Summit is executing a focused strategy to build scale, unlock resource potential and drive shareholder value. The company has taken lessons from its past and re-emerged with a sharpened vision, an overhauled team and assets that are not only high-grade but strategically located to create shareholder value.
Company Highlights
- Aggressive Discovery Strategy: Sun Summit Minerals is actively advancing the JD and Buck projects in BC, targeting epithermal gold-silver and porphyry copper-gold systems. A fully funded 5,000-meter drill program at JD underway in 2025, aiming to define a multi-million-ounce resource.
- Strategic Location: Both assets are situated in prolific and mining-friendly regions of British Columbia. The flagship JD project lies in the Toodoggone district—home to Thesis Gold and Centerra’s Kemess Mine, while Buck is near the Blackwater, Huckleberry, and Equity Silver mines in central BC.
- Re-rate Potential Opportunity: Trading at just ~$7/oz gold equivalent (EV/oz) based on Buck alone, with no value currently ascribed to JD, the company represents a deep value opportunity compared to the next-door neighbour Thesis Gold trading at ~$50/oz. Success at the drill bit from the ongoing drill program at JD could drive the potential re-rating.
- Fully Funded for 2025: A recent C$10M raise (May 2025) enables a robust exploration program, including drilling, geophysics, and soil sampling. The company is well-positioned to achieve its 2025 and 2026 exploration milestones without further dilution.
- Experienced, Capital Markets-Savvy Leadership: CEO Niel Marotta brings capital markets acumen from Fidelity and Orezone. The broader team includes senior geologists and advisors with decades of success in gold discoveries and mine development in BC.
- Positioned for Consolidation: With majors like Freeport, Centerra, and Skeena investing heavily in adjacent properties, Sun Summit is strategically located and advancing at the right time in the Lassonde Curve to benefit from industry-wide M&A and consolidation trends.
Key Projects
JD & Theory Projects
The JD & Theory projects span more than 25,000 hectares in the heart of the Toodoggone mining district in north-central BC, one of Canada’s most prospective belts for epithermal gold-silver and porphyry copper-gold systems. The district is home to Thesis Gold’s Ranch and Lawyers deposits (4.7 Moz gold equivalent, C$250 million market cap), Centerra’s Kemess underground development, and TDG Gold’s Shasta-Baker project. Infrastructure around the project includes hydroelectric grid access, the nearby Sturdee airstrip and all-season roads.
The JD project hosts a 4.5 km mineralized corridor, known as Creek-Finn, with multiple underexplored targets showing evidence of both high-grade veins and broad disseminated gold systems. Historic and recent drill highlights include:
- 2.1 grams per ton (g/t) gold over 122.5 m including 121 g/t gold over 1.5 m (CZ-24-004)
- 11.7 g/t gold over 22 m including 61.2 g/t gold over 4 m (CZ97-008)
- 7.3 g/t gold over 35.7 m including 215.4 g/t gold over 1 m (JD95-0472)
The Creek Zone features high-grade epithermal veins within broader disseminated zones, supported by strong IP anomalies and gold-in-soil results up to 12.2 g/t gold. The Finn Zone hosts near-surface mineralization with extensive historical drilling (~270 holes) and is open in all directions. Other targets include McClair (porphyry copper), East McClair (copper-gold skarn) and Moosehorn.
The 2025 program includes 5,000 meters of core drilling across 25 holes, 20 km of IP geophysics, 2,000+ soil samples, and full-scale camp operations. A five-year permit secured in April 2025 provides exploration continuity through 2030.
Camp setup at JD project
Sun Summit can earn 100 percent of the JD project by making staged cash/share payments and completing work commitments through 2029. With ~C$6 million earmarked for the project this year alone, Sun Summit is expected to fulfill its 2025 and 2026 earn-in obligations without additional equity raises.
Buck Project
The 100 percent owned Buck project spans 52,000 hectares and is located near key deposits, including Artemis Gold’s Blackwater (8 Moz gold), Imperial’s Huckleberry copper mine, and Newmont’s historic Equity Silver mine. Buck features near-surface bulk-tonnage gold-silver mineralization with porphyry copper-molybdenum potential at depth.
In February 2025, Sun Summit published its inaugural NI 43-101 mineral resource:
- Indicated: 1.15 Mt @ 0.519 g/t gold equivalent (19,100 oz)
- Inferred: 52.2 Mt @ 0.489 g/t gold equivalent (820,400 oz)
Mineralization remains open in all directions. Buck is considered a strategic asset providing leverage to rising gold prices and future transaction potential, but currently receives minimal capital allocation as JD is prioritized.
Management Team
Niel Marotta – Chief Executive Officer and Director
Niel Marotta has more than two decades of capital markets experience, including a successful tenure at Fidelity (FMRCo.), where he managed the top-performing Select Gold Fund and oversaw >$1 billion in AUM. He was previously VP at Orezone Resources, where he helped lead its C$350 million acquisition by IAMGOLD. Marotta has raised over $1 billion in financing and is driving Sun Summit’s transition from a legacy explorer to a discovery-focused value generator.
Brian Lock – Executive Chairman
A veteran of the mining industry with 40+ years of executive experience, Brian Lock has led multiple public companies, including Castle Peak Mining and Scorpio Gold. His expertise spans project development, M&A and corporate governance.
Waseem Javed – Chief Financial Officer
A seasoned mining CFO, Waseem Javed ensures disciplined capital deployment and financial controls. His experience spans junior explorers and mid-tier producers across Canada and the US.
Ken MacDonald – VP Exploration
Ken MacDonald is a registered professional geologist with over 30 years in mineral exploration and permitting in BC. Formerly with the BC Mines Branch and multiple juniors, he leads Sun Summit’s technical programs and NI 43-101 compliance.
Christopher Leslie – Technical Advisor
An expert in porphyry and epithermal systems, Christopher Leslie led the discovery of the 8 Moz Blackwater deposit while at Richfield Ventures, and later served as VP exploration for Tower Resources. He was instrumental in advancing the JD-Theory project during its prior ownership.
Robert D. Willis – Senior Advisor
Founder of several successful exploration companies, including Pioneer Metals and Manhattan Minerals, Robert Willis has 35+ years of technical and executive experience across North and South America.
Terry Salman – Strategic Advisor
Founder of Salman Partners and one of Canada’s most influential mining financiers, Terry Salman has backed dozens of successful juniors over a 40-year career in mining investment banking.
Keep reading...Show less
15h
Aurum Resources
Investor Insights
Aurum Resources offers a compelling value proposition through its highly prospective gold assets in Côte d'Ivoire, a fast-emerging gold region in West Africa. Its cost-effective exploration strategy of drill rig ownership also distinguishes it from its peers.
Overview
Aurum Resources (ASX:AUE) is a mineral exploration company primarily focused on gold through its Boundiali and Napié gold projects in Côte d’Ivoire, West Africa.
Côte d'Ivoire's gold mining sector is experiencing significant growth and development, with several key projects contributing to the country's economic expansion. The overall gold mining sector in Côte d'Ivoire is supported by substantial investments in infrastructure and exploration.
Geopolitically, Côte d'Ivoire outperforms most developing countries in the world in political, legal, tax and operational risk metrics. Additionally, Côte d'Ivoire continues to make notable strides in its political stability and Absence of Violence and Terrorism Index.
Boundiali Gold Project – BD Target 1 Artisanal Working
Aurum has entered into a Bid Implementation Agreement with Mako Gold for Aurum to acquire 100 percent of the issued shares in Mako. This proposed merger will allow both Aurum and Mako security holders to benefit from the combination of Aurum’s strong balance sheet and exceptional drilling efficiencies with AU$23 million in cash at the end of December 2024 to support work programs targeted at further resource definition across Aurum and Mako’s assets in northern Côte d'Ivoire. Aurum is currently in its final phase of compulsory acquisition of remaining Mako shares after it received over 90 percent acceptance of MKG shares in late January 2025.
Following its takeover of Mako Gold, Aurum holds 90 percent of the Napié Project located 30 km southeast of the city of Korhogo and covers a strike length of 30 km over a highly prospective land package of 224 sq km.
The merger is backed by a highly experienced board and management team with extensive gold experience from grassroots discovery, through to resource drill-out, feasibility studies, project finance, and production.
With a strong financial position backed by the recent $35.6 million private placement, Aurum is well-funded to execute exploration and development plans focused on delivering value for shareholders through resource growth and project advancement.
Company Highlights
- Aurum Resources is a precious metals company with exploration prospects in the same greenstone belt as the Syama (11.5 Moz), Sissingué (1.0 Moz), Tongon (5.0 Moz) and Kone Gold (4.5 Moz) deposits of West Africa.
- A total of 2.5Moz gold resource in Côte d'Ivoire, West Africa:
- Boundiali - 1.6Moz Gold Project
- Napié - 0.87Moz Gold Project
- Aurum operates its own drill rigs, allowing the company to significantly reduce its exploration costs relative to peers.
- Management has a track record of creating value for shareholders from exploration through to project development, mine construction and gold production.
- Strong leverage to increasing gold prices that will benefit from a declining interest rate environment and rising global geopolitical risk factors.
- Well-funded for more than 12 months and over 100,000 metres of diamond drilling programs and metallurgical study
- Aurum’s acquisition of 100 percent of Mako Gold’s issued shares (ASX:MKG) is in its final stage of compulsory acquisition of the remaining MKG shares after Aurum received over 90 percent acceptance in late January 2025.
Key Projects
Boundali Gold Project
The Boundiali gold project in Cote d’Ivoire is located within the Boundiali Greenstone Belt, which hosts Resolute’s Syama gold operation (11.5 Moz) and the Tabakoroni deposit (1 Moz) in Mali. Neighbouring assets also include Barrick’s Tongon mine (5 Moz) and Montage Gold’s Kone project (4.5 Moz).
The Boundiali project area covers the underexplored southern extension of the Boundiali belt, where a highly deformed synclinal greenstone horizon traverses finer-grained basin sediments, and to the west, Tarkwaian clastic rocks lie in contact with a granitic margin. The project benefits from year-round road access and excellent infrastructure.
The first stage of drilling at Boundiali occurred from late October 2023 to end of November 2024 for both the BM and BD tenements (BM1 and BM2; BD1, BD2 and BD3 targets) and was designed to test below-gold-in-soil anomalies oriented along NE trending structures, define new gold prospects and define maiden JORC resources. With over 63,000m diamond holes drilled during this period, Maiden JORC gold resources estimate was delivered in late December 2024.
Drilling costs are estimated at US$45 per metre, as Aurum owns all of its eight drilling rigs and employs its operators, representing a significant value proposition relative to peers who use commercial drilling companies that charge upwards of $200 per meter. The company believes there is potential for multi-million ounce gold resources to be defined with hundreds thousands meters of drilling over years within the Boundiali Gold Project’s land holding areas.
The Boundiali gold project comprises four contiguous granted licenses: PR0808 (80 percent interest), PR0893 (80 percent and earning to 88 percent interest), PR414 (100 percent interest), and PR283 (earning to 70 percent interest). Historic exploration at PR0893 includes 93 AC drill holes and four RC holes. Airborne geophysical surveying, geological mapping and extensive soil sampling have also been performed at PR0893, while PR0808 has had 91 RC holes drilled for 6,229 metres along with geochemical analysis and modeling. Detailed geochemical sampling and drilling at PR414 revealed three strong gold anomalies and returned impressive high-grade results.
Following the renewal of its Boundali South (BST) exploration licence in September 2024, drilling at the Nyangboue deposit is planned for H1 2025 and H2 2025. Previous exploration at BST has returned impressive results, including 20 m at 10.45 g/t gold from 38 meters, and 30 m at 8.30 g/t gold from 39 m.
In May 2024, Aurum entered a strategic partnership agreement to earn up to a 70 percent interest in exploration tenement PR283, to be renamed Boundiali North (BN). Aurum, through subsidiary Plusor Global Pty Ltd, has partnered with Ivorian company Geb & Nut Resources Sarl and related party (GNRR) to explore and develop the Boundiali North (BN) tenement which covers 208.87sq km immediately north of Aurum’s BD tenement. Further to this agreement,
Aurum announced it has earned 80 percent project interest after completing more than 20,000 m of diamond core drilling.
Boundiali Project JORC Mineral Resource Estimate
Aurum has announced a maiden independent JORC mineral resource estimate of 1.59 Moz gold for its 1,037 sq. km. The Boundiali Gold Project comprises the BST, BDT1 & BDT2, BMT1 and BMT3 deposits. Drilling is ongoing on these deposits, and Aurum has identified other prospects at Boundiali which have yet to be drilled. Since October 2023, the company has completed an extensive 63,927-metre diamond drilling program. This aggressive exploration campaign has rapidly defined a significant gold resource of 50.9 Mt @ 1.0 g/t gold for 1.6 million ounces.
Growth Plans for the Boundali Project:
- Aggressive cost-effective exploration at Boundiali: Aurum is committed to a large-scale exploration program at Boundiali. This includes:
- 100,000 m diamond drilling: Up to eight diamond drill rigs will complete 100,000m of drilling at Boundiali in 2025. The program has multiple aims:
- Increase the size and confidence of current resources at BST, BD, and BM (40,000m).
- Advance known prospects (30,000m) for incorporation into two planned MRE updates in 2025.
- Target new prospects identified through soil anomalies and geological mapping to drive resource growth into 2026 (30,000m).
- Resource expansion: Drilling aims to expand the known resources at the BST, BD, and BM deposits.
- New discoveries: Exploration and scout drilling is planned on BD, BM and BST tenements to test new targets and create a pipeline of new discoveries to flow into resource growth.
- Boundiali resource updates: Aurum plans to deliver two MRE updates for Boundiali in 2025.
- Pre-Feasibility Study: Aurum is working towards completing an open pit PFS for the Boundiali Gold Project by the end of 2025. This will provide an evaluation of the project's economics and technical feasibility.
- 100,000 m diamond drilling: Up to eight diamond drill rigs will complete 100,000m of drilling at Boundiali in 2025. The program has multiple aims:
Napié Gold Project
Aurum holds a 90 percent interest in the Napié Project in north-central Côte d’Ivoire, acquired through its takeover of Mako Gold. Located approximately 30 km southeast of Korhogo, the project covers a 224 sq km land package with a 30 km strike length along the highly prospective Napié Shear Zone.
As of June 2022, Napié hosts a JORC 2012 Mineral Resource Estimate of 868,000 ounces of gold (22.5 Mt at 1.20 g/t Au), based on the Tchaga and Gogbala deposits—two of four known prospects along the shear. To date, only 13% of the Napié Shear has been explored, leaving substantial potential for further discoveries.
Napié Project – Previous results with detailed mapping area on Komboro Prospect shown in black rectangle
Project Highlights:
- Gold Resource: Shallow open pit 0.87Moz JORC Resource at 1.20g/t Au, with mineralisation open along strike and at depth. Maximum resource depth between 160 m – 195m across the two deposits
- Exploration Upside: Less than 13 percent of the 30 km Napié Shear has been explored, offering significant potential for resource growth.
- Drilling Commenced in June 2025: 30,000 m of diamond drilling has commenced to expand the project's resource.
- Preliminary Recovery Test Work: Returned more than 94 percent average gold recoveries.
- Resource Growth Target: First MRE update planned end of 2025, to significantly expand the resource base.
- Infrastructure: Excellent access to hydroelectricity, roads, and water, supporting future development.
Management Team
Troy Flannery – Non-Executive Chairman
Troy Flannery has more than 25 years’ experience in the mining industry, including nine years in corporate and 17 years in senior mining engineering and project development roles. He has a degree in mining engineering, masters in finance, and first class mine managers certificate of competency. Flannery has performed non-executive director roles with numerous ASX listed companies and was the CEO of Abra Mining until October 2021. He has worked at numerous mining companies, mining consultancy and contractors, including BHP, Newcrest, Xstrata, St Barbara Mines and AMC Consultants.
Dr. Caigen Wang – Managing Director
Dr. Caigen Wang founded Tietto Minerals (ASX:TIE), where he led the company as managing director for 13 years through private exploration, ASX listing, gold resource definition, project study and mine building to become one of Africa’s newest gold producers at its Abujar gold mine in Côte d’Ivoire. He holds a bachelor, masters and PhD in mining engineering. He is a fellow of AusIMM and a chartered professional engineer of Institution of Engineer, Australia. Wang has 13 years of mining academic experience in China University of Mining and Technology, Western Australia School of Mine and University of Alberta, and over 20 years of practical experience in mining engineering and mineral exploration in Australia, China and Africa. Other professional experience includes senior technical and management roles in mining houses, including St. Barbara, Sons of Gwalia, BHP Billiton, China Goldmines PLC and others.
Mark Strizek – Executive Director
Mark Strizek has nearly 30 years’ experience in the resource industry, having worked as a geologist on various gold, base metal and technology metal projects. He brings invaluable geological, technical and development expertise to Aurum, most recently as an executive director at Tietto Minerals’, which progressed from an IPO to gold production at the Abujar gold project in West Africa. Strizek has worked as an executive with management and board responsibilities in exploration, feasibility, finance and development-ready assets across Australia, West Africa, Asia and Europe.
Keep reading...Show less
Latest News
Latest Press Releases
Trading Halt
8h
Related News
TOP STOCKS
American Battery4.030.24
Aion Therapeutic0.10-0.01
Cybin Corp2.140.00