Avrupa Minerals Ltd. (AVU:TSXV) (OTC:AVPMF) (TSX-V:AVU) (FRANKFURT:8AM) is pleased to announce that its partner at the Slivova Gold Project in the Republic of Kosovo, Western Tethyan Resources ("WTR"), has provided a positive, independent Preliminary Economic Assessment ("PEA") study based on the NI 43-101 Mineral Resources Estimate ("MRE") previously reported by Avrupa on July 17, 2023 (see news release Slivova Mineral Resource Estimate ).  Bara Consulting completed the PEA in accordance with CIM standards, and Avrupa has publicly disclosed the document under NI 43-101 reporting requirements

 

  The Slivova Project is located in the prolific Vardar Mineral Trend, about 30 km SE of Pristina, the capital of Kosovo.  WTR can earn-in to 75% of the Project by funding exploration and development for Euro 1,800,000 over three years, and then a further 10% by making certain milestone and success payments, producing an Environmental Impact Statement, delivering a Feasibility Study, and completing a Mining License application.  WTR is 75%-owned by AIM-listed Ariana Resources.  

 

  Highlights from the PEA include:  

 
  •  

      Slivova provides a conceptual pre-tax Net Present Value (NPV 8%) of US$27 million, and an internal rate of return ("IRR") of 29% at a gold price of US$1,835/oz.  

     
  •  
  •  

      Capital expenditure is estimated at $33.4 million and sustaining capital requirements of $9.4 million are envisaged in the study.  

     
  •  
  •  

      Average production of 13,000 ounces of gold per annum projected over a seven-year mine life from a combined open-pit and underground mining operation is estimated from the study.  

     
  •  
  •  

      Gold recovery by the Carbon-in-Leach ("CIL") method, with recovery of gold at   92-94.5% Au (based on current testwork) and a processing rate of 142,000 tpa is estimated from the study.  

     
  •  

  The full PEA document, which includes the NI 43-101 Mineral Resource Estimate, may be accessed on SEDAR+ or via the Avrupa Minerals website:     Slivova PEA    

 

  The independent Qualified Person for Mineral Resources as defined by NI 43-101 is Mr. Richard Siddle, MAIG, of Addison Mining Services Ltd. Mr. Siddle has reviewed and approved the scientific and technical content of this news release.  The Qualified Person completed a site visit to the project on 13 June 2023, and has inspected the property, drillhole locations and has reviewed selected intervals of the drill core used in the Mineral Resource Estimate. No concerns were identified during the visit.  

 

  The independent Qualified Person for the disclosure of the Preliminary Economic Assessment, as defined by NI 43-101, is Dr. Andrew Bamber, BSc, MASc, PhD, P.Eng. of Bara Consulting Limited.  Dr. Bamber has reviewed and approved the scientific and technical content of this news release, in the form and context in which it appears. Dr. Bamber completed a site visit to the project on 15 February 2023 and inspected the property, core samples, and visited locations relevant to the project including the   gossan outcrop and potential access road, process plant, and tailings sites within the license area.  

 

  Paul W. Kuhn, President and CEO of Avrupa Minerals, commented   ,   "We are delighted about the progress made at the Slivova Gold Project by Western Tethyan Resources and associated company Ariana Resources.  In the past two months the Mineral Resource Estimate has been updated, and a positive Preliminary Economic Assessment has been completed by our partners.  We look forward to seeing more positive results from the upcoming Q4 2023/Q1 2024 work field work program, including trenching and drilling, the Q4 2023 initiation of an Environmental Baseline Study, and continued, strong and proactive ESG work in the project area."  

 

  Mentor Demi, Managing Director of Western Tethyan Resources, added   ,   "The PEA prepared by Bara Consulting provides strong evidence that the Slivova Gold Project has the potential to develop into a profitable gold mine of modest size, even if no additional resources are identified. By showcasing a compelling economic viability, it also provides the basis for commencing the next phase of detailed exploration and techno-economic studies.  In conjunction with the pre-established infill resources drill program, WTR is commencing a trenching program to enhance exploration in the areas bordering the primary resource zone, specifically targeting Dzemailj and Valijevishte. Throughout Q4, the company intends to initiate the Environmental Base Line Study, the Social Impact Assessment, and complete the planning for a drilling program, with the actual drilling activities scheduled to commence in the first quarter (Q1) of 2024."  

 

  Dr. Kerim Sener, Managing Director of Ariana Resources   , added,   "This is an excellent positive outcome for the Slivova Gold Project, demonstrating its potential economics and highlighting opportunities to enhance the project in the longer term.  The broader exploration potential of the Slivova project area, in particular the opportunity to define further mineralisation down-plunge of the existing orebody, bodes well for further economic upside.  We are now looking to complete further work to demonstrate this upside, via a phased exploration programme, which will target the definition of additional resources and further investigate various aspects of the proposed mine design and processing route, among other technical matters."  

 

  Following is a summary discussion of important points from the PEA (from Western Tethyan Resources):  

 

 

 

  Introduction  

 

  The Slivova Gold-Silver Project ("the Project") is located some 30 km southeast of Pristina, the capital of Kosovo.  The Project was acquired by AVU Kosova, a wholly owned subsidiary of Avrupa Minerals ("Avrupa"), which was granted a seven-year exploration licence for the Project in 2022. In May 2023, Western Tethyan Resources Ltd ("Western Tethyan", "WTR" or "the Company") executed an earn-in agreement with Avrupa, in which WTR can earn-in up to 85% of the project.  

 

  Bara Consulting Limited ("Bara") was engaged by WTR to prepare a Preliminary Economic Assessment ("PEA") for Slivova. The study comprises the updated Mineral Resource Estimate (announced separately on July 17, 2023) and mining and tailings management assessments, which were used as inputs into a concept level techno-economic evaluation prepared in accordance with CIM guidelines and disclosed in accordance with NI 43-101 reporting requirements.  

 

  Project Location  

 

  The Slivova Project exploration license is located along the Vardar Mineral Trend, approximately 30 km (30 minutes by car) southeast of Pristina, the capital city of Kosovo.  Access to the Project is via the Pristina-to-Gjilan, two-lane highway and then an unsealed road beyond the village of Peshter.  

 

  There are four main exploration targets within the Slivova licence: Peshter, Dzemail, Valjeviste, and Brus. The Peshter prospect is further subdivided into three portions: the Main Gossan, Gossan Extension, and the Sandstone Gossan. The Peshter prospect is the main subject of the PEA, for which there is material disclosure (Figure 1).  

 

    
Click Image To View Full Size
 

 

  Figure 1:   The Slivova deposit (Peshter Target), and its associated license boundary.  

 

  Project Geology  

 

  Within the Slivova license, two units are identified: the calcareous unit and the non-calcareous greywacke unit.  They are moderately- to steeply-dipping, northwest striking, and beyond the mineralized prospects, tend to be unaltered and weakly to moderately oxidized.  

 

  Two types of intrusive dykes and sills were identified in the mapping and drilling: hornblende-biotite porphyry dykes and stock, and a feldspar porphyry dyke.  The dykes represent less than 3% of the total rock volume within the Main Gossan, with the hornblende-biotite porphyry representing 99.5% of the intrusive rocks.  Within the Gossan Extension, the hornblende-biotite porphyry is represented by a greater volume of rock and may be a series of northeast-trending dykes, or a larger stock.  

 

  Economic mineralization in the Main Gossan and Gossan Extension is concentrated in the calcareous pebble conglomerate and calcareous sandstones.  Mineralization at Slivova is classified as a distal, intrusive-related, stratiform, massive to disseminated gold-silver-lead-zinc deposit. The principal minerals of economic interest are gold with minor amounts of galena, sphalerite, chalcopyrite, and silver. The gangue mineral assemblage consists of ilvaite(?), trace magnetite, arsenopyrite, pyrrhotite, marcasite, pyrite, quartz, and various carbonates.  Trace elements include arsenic, bismuth, chromium, manganese, nickel, and vanadium.  

 

  Mineral Resources  

 

  The Mineral Resource Estimate, as previously announced, has an effective date of 22 June 2023.  The Mineral Resource Estimate for Slivova, completed on July 14, 2023, is reported in Table 1 and is based on the block model shown in Figure 2.  No estimates of Mineral Reserves have been prepared. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.  The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. The Qualified Person is not aware of any such issues at the time of writing.  

 

    
Click Image To View Full Size
 

 

  Figure 2:   Oblique view of the block model showing the estimated gold grades. WGS84 Z34N.  

 
                                                                                                           
 

  Category  

 
 

  Tonnes  

 
 

  Bulk Density  

 
 

  AuEq (g/t)  

 
 

  Au (g/t)  

 
 

  Ag (g/t)  

 
 

  Au  

 

  (oz)  

 
 

  Ag  

 

  (oz)  

 
 

  Total Mineral Resources (Gross to the Project)  

 
 

  Measured  

 
 

  835,000  

 
 

  2.9  

 
 

  4.3  

 
 

  4.2  

 
 

  15  

 
 

  113,000  

 
 

  402,000  

 
 

  Indicated  

 
 

  296,000  

 
 

  2.8  

 
 

  3.6  

 
 

  3.5  

 
 

  15  

 
 

  33,200  

 
 

  144,000  

 
 

  Meas + Ind  

 
 

  1,130,000  

 
 

  2.9  

 
 

  4.1  

 
 

  4.0  

 
 

  15  

 
 

  146,000  

 
 

  546,000  

 
 

  Inferred  

 
 

  250,000  

 
 

  2.8  

 
 

  3.7  

 
 

  3.7  

 
 

  13  

 
 

  30,000  

 
 

  100,000  

 
 

  Open Pit Resources Above 0.5g/t AuEq  

 
 

  Measured  

 
 

  110,000  

 
 

  2.9  

 
 

  3.2  

 
 

  3.2  

 
 

  14  

 
 

  11,200  

 
 

  48,300  

 
 

  Indicated  

 
 

  39,300  

 
 

  2.6  

 
 

  2.8  

 
 

  2.7  

 
 

  13  

 
 

  3,390  

 
 

  16,500  

 
 

  Meas + Ind  

 
 

  150,000  

 
 

  2.8  

 
 

  3.1  

 
 

  3.0  

 
 

  13  

 
 

  14,600  

 
 

  64,800  

 
 

  Inferred  

 
 

  nil  

 
 

  nil  

 
 

  nil  

 
 

  nil  

 
 

  nil  

 
 

  nil  

 
 

  nil  

 
 

  Underground Resources Above 1.5g/t AuEq  

 
 

  Measured  

 
 

  725,000  

 
 

  2.9  

 
 

  4.4  

 
 

  4.4  

 
 

  15  

 
 

  102,000  

 
 

  354,000  

 
 

  Indicated  

 
 

  257,000  

 
 

  2.9  

 
 

  3.7  

 
 

  3.6  

 
 

  15  

 
 

  29,800  

 
 

  127,000  

 
 

  Meas + Ind  

 
 

  982,000  

 
 

  2.9  

 
 

  4.2  

 
 

  4.2  

 
 

  15  

 
 

  131,000  

 
 

  481,000  

 
 

  Inferred  

 
 

  250,000  

 
 

  2.8  

 
 

  3.7  

 
 

  3.7  

 
 

  13  

 
 

  30,000  

 
 

  100,000  

 
 

  Table 1:   Estimated Mineral Resources for Slivova. Numbers are rounded to an appropriate number of significant figures, and as such, discrepancies may exist between individual values, products, and totals.  

 

  Notes to the Mineral Resource Estimate (1-9):  

 
  1.  

      The independent Qualified Person responsible for Mineral Resource disclosure, as defined by NI 43-101, is Mr. Richard Siddle, MSc, MAIG, of Addison Mining Services Ltd. The effective date of the Mineral Resource Estimate is 22 June 2023.  

     
  2.  
  3.  

      Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the Mineral Resource will be converted to Mineral Reserves.  

     
  4.  
  5.  

      A gold equivalent (AuEq) grade was calculated for each block using the formula AuEq = (Ag g/t x 0.05) + Au g/t. It is the opinion of the Qualified Person that all elements included in the Au Equivalent calculation have a reasonable prospect of being recovered and sold, the calculation of the Au equivalent value considers the relative recovery and payability of each element (recovery by cyanide leaching of 93.4% for gold and 50% for silver and 95% and 85% payability, respectively, as informed by metallurgical test work completed to date) as well as the assumed commodity prices.  

     
  6.  
  7.  

      Reasonable prospects of eventual economic extraction are satisfied by the estimation of break-even cut-off grades for each anticipated mining scenario (0.5g/t AuEq for open pit and 1.5g/t AuEq for underground mining). These cut-off grades were used to report the Mineral Resource. The cut-off grades were estimated on the basis of the following assumptions: a gold price of US$1850/oz (selected following consideration of (1, 2 and 3 year trailing average LMBA gold price and LMBA 2023 average forecast gold price, a silver price of US$20/oz, underground mining costs of US$43.7/t, processing costs (including tailings disposal) of US$29.5/t and GA costs of US$3/ROMt.  

     
  8.  
  9.  

      Estimates in the above table have been rounded to three significant figures for Measured and Indicated Resources and two significant figures for Inferred Mineral Resources.  

     
  10.  
  11.  

      CIM Definition Standards for Mineral Resources have been followed.  

     
  12.  
  13.  

      The independent Qualified Person for Resources is not aware of any additional known environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues that could materially affect the Mineral Resource Estimate.  

     
  14.  
  15.  

      The Mineral Resource figures set out above are quoted gross with respect to the Project. WTR of which Ariana owns 75%, has yet to establish a net attributable interest under the Earn-in and accordingly, no separate net attributable figures are reported.  

     
  16.  
  17.  

      Western Tethyan Resources is the operator of Slivova  

     
  18.  

  Mine Design  

 

  A revised approach to the mining of Slivova involves a small starter pit to access the outcropping mineralized gossan area, followed by underground extraction of the gold resource below the open pit at an appropriate extraction rate to suit the size and grade of the deposit.  Mine design involved a more detailed analysis of the potential mining method and a mineable stope optimization exercise to fully assess and define the underground stoping extents.  

 

  A geotechnical review was undertaken to validate extraction methods.  Ore zones and host rocks are either non-calcareous or calcareous sequences of altered sedimentary rocks with ore zone strengths varying between 45 MPa and 50 Mpa.  Mine design was adapted to be flexible to varying competencies of host rock, particularly in the contact areas.  

 

  The starter pit has been designed to be mined from the top bench downwards with ore being accessible and extracted immediately, i.e., there is no requirement or need for any pre-stripping. It has been assumed that this small open pit can be mined by local contractors who have quarries within the vicinity of the proposed mine at Slivova. The revised starter pit design is also situated such that there is now no requirement for stream re-alignment where the pit can be accessed for initial extraction via existing tracks on the north side of the stream. Pit extents minimize the impact on the surrounding countryside and local communities.  

 

  Due to the requirement for a 25 m crown pillar, the bottom bench was modified to a base of 865 mRL.  Bench access was linked into the existing tracks and roads on the site.  This allows for easy access to each bench for overburden and ore removal without the need for any ramps. Access to the bottom bench is directly in from topography. Pit operations cease after Year 1.  

 

  Underground access is envisaged as a portal developed directly into the south valley wall, supporting mining typically by sublevel open stoping, unless ore zone geometry dictates a step down to cut-and-fill methods. Main sublevels are 20 m, with stoping separated 25 m from the open pit bottom by a crown pillar which will be mined by sublevel caving methods at the end of mine life.  

 

  Mining is suggested to be via small teams of approximately 16 people per shift, using small diesel fleet appropriate for production at between 300 t/day and 400 t/day. Mined material to be trammed directly from underground operations through the portal to the primary crusher tip located at the plant site on the saddle of the southern ridge 500 m to the east.  

 

  Recovery Methods  

 

  Results of extensive characterisation and testing of the Slivova ore by a range of methods suggest that treatment would be via carbon-in-leach ("CIL") methods, delivering gold recovery of 92-94.5% and silver recovery of 19.8-22.5%.  Some gold may be extracted via gravity recovery methods.  Nominal plant throughput will be 142,000 tpa, with primary, secondary, and tertiary crushing of the ore, followed by ball   milling to 106 m and leaching of the ore by CIL methods. Loaded carbon is stripped, with electrowinning and final EAF smelting of the doré to bullion on site.  

 

  Environmental  

 

  The environmental and social work completed to date is in line with that required for the PEA based on the revised mining plan.  No environmental or social fatal flaws have been identified, and Bara is not aware of any environmental or social issue that would prevent the project from proceeding to the PFS phase, during which time various potential environmental risks would need to be evaluated further.  

 

  Economic Analysis  

 

  The economic analysis presented here is preliminary in nature and is based in part on Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorised as Mineral Reserves. There is therefore no certainty that the PEA presented here will be realised.  

 

  PEA level economic analysis is based on the production schedule presented with capital and operating cost estimates for the Slivova Project and other information as of July 2023. The discounted cashflow analysis ("DCF") is presented in United States Dollars (US$) in real money terms, free of escalation or inflation.  Revenue has been determined through application of the recovered troy ounces produced by Slivova to the gold and silver prices as stated, less payability.  

 

  Depreciation has been calculated on the assumption that 100% of capital expenditure may be deducted from profits in the year that they are incurred (Deductibility Rate). It is assumed that all capital expenditure is eligible for deduction.  A discount rate of 8% has been used for the evaluation, and no tax treatment has been applied.  

 

  The conceptual DCF analysis shows the Project is economic with a pre-tax net present value ("NPV"), at 8% discount rate, of US$27 million, and an internal rate of return ("IRR") of 29% with upfront capital requirements of $33.4 million, and sustaining capital requirements of $9.4 million.  

 

  Western Tethyan Minerals (WTR)   is a UK-registered, mineral exploration and development company focused on South East Europe. The company has a strategic alliance with Newmont Corporation and Ariana Resources and is currently focused on exploration for major copper-gold deposits in the Lecce Magmatic Complex and Vardar Belt. The company is assessing several other exploration project opportunities across Eastern Europe, targeting copper-gold deposits across the porphyry-epithermal transition.  

 

  Ariana Resources   is an AIM-listed mineral exploration and development company with an exceptional track-record of creating value for its shareholders through its interests in active mining projects and investments in exploration companies. Its current interests include gold production in Turkey and copper-gold exploration and development projects in Cyprus and Kosovo.  

 

  Avrupa Minerals Ltd.   is a growth-oriented junior exploration and development company directed to discovery of mineral deposits, using a hybrid prospect generator business model.  The Company holds one 100%-owned license in Portugal, the Alvalade VMS Project, presently optioned to Sandfire Mineira Portugal in an earn-in joint venture agreement.  The Company now holds one 100%-owned exploration license covering the Slivova gold prospect in Kosovo, and is actively advancing four prospects in central Finland through its in-process acquisition of Akkerman Finland Oy.  Avrupa focuses its project generation work in politically stable and prospective regions of Europe, presently including Portugal, Finland, and Kosovo.  The Company continues to seek and develop other opportunities around Europe.  

 

For additional information, contact Avrupa Minerals Ltd. at 1-604-687-3520 or visit our website at    www.avrupaminerals.com    .

 

  On behalf of the Board,  

 

  "Paul W. Kuhn"  

 

  Paul W. Kuhn, President & Director  

 

  This news release was prepared by Company management, who take full responsibility for its content.  Paul W. Kuhn, President and CEO of Avrupa Minerals, a Licensed Professional Geologist and a Registered Member of the Society of Mining Engineers, is a Qualified Person as defined by National Instrument 43-101 of the Canadian Securities Administrators.  He has reviewed the technical disclosure in this release.  Mr. Kuhn, the QP, has not only reviewed, but prepared and supervised the preparation or approval of the scientific and technical content in the news release.  

 

  Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.  

 

Copyright (c) 2023 TheNewswire - All rights reserved.

 

News Provided by TheNewsWire via QuoteMedia

AVU:CA
The Conversation (0)
Avrupa Minerals Starts Drilling at Kangasjarvi, Central Finland

Avrupa Minerals Starts Drilling at Kangasjarvi, Central Finland

 

(TheNewswire)

 
     
  Avrupa Minerals Ltd. 
          
 

 

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Avrupa Minerals Intersects Polymetallic VMS Mineralization at Sesmarias

Avrupa Minerals Intersects Polymetallic VMS Mineralization at Sesmarias

 

(TheNewswire)

 
     
  Avrupa Minerals Ltd. 
          
 

 

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Avrupa Minerals Closes $350,000 Private Placement

Avrupa Minerals Closes $350,000 Private Placement

 

(TheNewswire)

 
     
  Avrupa Minerals Ltd. 
          
 

 

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Avrupa Minerals $350,000 Private Placement is Fully Subscribed

Avrupa Minerals $350,000 Private Placement is Fully Subscribed

 

(TheNewswire)

 
     
  Avrupa Minerals Ltd. 
          
 

 

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Avrupa Minerals Announces $350,000 Private Placement

Avrupa Minerals Announces $350,000 Private Placement

 

(TheNewswire)

 
     
  Avrupa Minerals Ltd. 
          
 

 

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
FPX Nickel Announces Share-Based Compensation Grant

FPX Nickel Announces Share-Based Compensation Grant

 
 

FPX Nickel Corp. (TSXV: FPX) (OTCQB: FPOCF) (" FPX " or the " Company ") announces that the board of directors of the Company has approved the grant of 5,305,000 stock options (the " Options ") to directors, officers and employees of the Company pursuant to the Company's Share Compensation Plan. The Options have an exercise price of $0.30 per share, with a five-year term and are fully vested on the grant date, July 10, 2025 .

 
 

  FPX Nickel logo (CNW Group/FPX Nickel Corp.) 

 

The Company also granted an aggregate 750,000 restricted share units (the " RSUs ") to certain officers of the Company. The RSUs vest in three equal installments on the annual anniversaries of the grant date and each vested RSU will entitle the holder to receive one common share of the Company or the equivalent cash value upon settlement.

 

  About FPX Nickel Corp.  

 

 FPX Nickel Corp. is focused on the exploration and development of the Decar Nickel District, located in central British Columbia , and other occurrences of the same unique style of naturally occurring nickel-iron alloy mineralization known as awaruite. For more information, please view the Company's website at https://fpxnickel.com/ or contact Martin Turenne , President and CEO, at (604) 681-8600 or ceo@fpxnickel.com .

 

On behalf of FPX Nickel Corp.

 

"Martin Turenne"
Martin Turenne , President, CEO and Director

 

   Forward-Looking Statements   

 

  Certain of the statements made and information contained herein is considered "forward-looking information" within the meaning of applicable Canadian securities laws. These statements address future events and conditions and so involve inherent risks and uncertainties, as disclosed in the Company's periodic filings with Canadian securities regulators. Actual results could differ from those currently projected. The Company does not assume the obligation to update any forward-looking statement.  

 

  Neither the TSX Venture Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.  

 

SOURCE FPX Nickel Corp.

 

 

 

 Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/July2025/11/c5569.html  

 
 

 

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Cygnus Metals Limited: Issue of Performance Rights

Cygnus Metals Limited: Issue of Performance Rights

 

Cygnus Metals Limited ("Cygnus" or the "Company") advises that it has issued an aggregate of 67,050,000 performance rights ("Performance Rights") to directors, and key employees and consultants, under the Company's Omnibus Equity Incentive Plan ("Plan").

 

Shareholders approved the Plan and the issue of Performance Rights to directors at the Company's annual general meeting held on May 14, 2025. The Performance Rights to key personnel were issued on the same terms and conditions as the director Performance Rights, as set out in the notice of annual general meeting released to ASX on April 14, 2025.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Silver47 Conducts Prospecting and Soil Geochemical Surveys at Its Adams Plateau SEDEX Silver-Zinc-Lead-Copper-Gold Project, BC, Canada

Silver47 Conducts Prospecting and Soil Geochemical Surveys at Its Adams Plateau SEDEX Silver-Zinc-Lead-Copper-Gold Project, BC, Canada

Silver47 Exploration Corp. (TSXV: AGA,OTC:AAGAF) (OTCQB: AAGAF) ("Silver47" or the "Company") is pleased to announce the 2025 exploration program is nearing completion at its wholly-owned Adams Plateau Project (the "Project") in southern British Columbia, a silver-zinc-copper-gold-lead SEDEX project.

Gary Thompson, CEO of Silver47, stated: "We are glad to continue our work on Adams Plateau toward defining drill targets on this road-accessible project. The abundance of surface mineralization on the Project is very encouraging for the potential of new and exciting discoveries. The Company has received a 5-year permit for drilling. This year is shaping up to be transformational for the Company with a full season of drilling at the flagship Red Mountain Project and the pending merger with Summa Silver."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Osisko Metals Infill and Expansion Drilling Intersects New Wide Mineralization at Gaspé Copper

Osisko Metals Infill and Expansion Drilling Intersects New Wide Mineralization at Gaspé Copper

 

   New Expansion Hole Intersects    279    Metres Averaging    0.49    % Cu   

 

   Nine Drill Rigs Now Active on Site   

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Vertex Minerals Limited  Reward Gold Mine Project Update

Vertex Minerals Limited Reward Gold Mine Project Update

Perth, Australia (ABN Newswire) - Vertex Minerals Limited (ASX:VTX,VTXXF) (OTCMKTS:VTXXF) is pleased to announce that the underground mining operation is on track to be producing high grade gold feed to the recently commissioned gravity gold plant in the coming weeks.

HIGHLIGHTS:

- Operational Milestones

o VTX remains firmly on track to commence production of high-grade ore from the underground mine in the forthcoming weeks.

o Transformer and cabling for the installation of 11kV high voltage underground power system on site with installation commenced.

o Preparations for the underground mine startup up progressing as planned and stripping of the main access is completed.

o New Aramine L350D has departed France for the journey to Hill End. Arrival in Orange NSW expected in by 26th August where it will be fitted with an RCT remote control system for open stoping operations.

o Mining the Reward Gold Mine - Resource 225kozs at 16.7g/t (VTX ASX Announcement 21 June 2023).

o Weekly Gold production Oz's from Stockpiles improving with depth in the stockpiles, with coarser particle size and better process throughput experienced.

- Mine start up

o Fan chambers have been excavated to provide secondary ventilation for production activities, exploration drilling and the future southern access toward the Fosters' exploration target.

o Primary ventilation fan has been installed and bulkhead completed.

o High voltage surface substation has been installed.

o High voltage cabling installation commences next week, with power up of the system scheduled for 28 July 2025.

o Stripping of the main accessis completed with the final elements of ground support (approx. 30m) to be completed before power cable installation starts next week.

o Cable bolts installed for the intersection of Lady Belmore exploration drive with first cut drilled out and ready to charge.

o Development Jumbo #1 (Epiroc T1D) is exceeding performance expectations.

o Dewatered of declines well underway.

o Mine schedule for FY26 finalised.

o First airleg stope secondary vent installed and specialty equipment on site to start first air leg stope.

o First long hole stope planned for August. High grade from airleg and longhole stopes to complement larger tonnage from development ore headings.

- People that have been onboarded

o 2x Drill Fitters and Heavy diesel fitter.

o Process superintendent commences next week.

o Full Tech team started including mine surveyor this week.

o Have back-to-back airleg miners for stoping.

o Full underground and mill crews.

- Improvements to plant

o DSM screen installed to improve product delivery to Wilfley Table.

o Gemini table improvements with new tabletop and gearbox improving final concentrate grade to over 20% gold (suitable for direct smelting to Dore on site).

o Process water pump upgrade improving ore washing and Tomra performance.

- Revised mine plan and schedule completed and ready to implement

- Updated Reward Gold mine mining plan and mine schedule completed.

- Adding a high-grade long hole stope upfront to be mined concurrently with the high grade airleg stope.

Vertex Director Declan Franzmann commented: "It is great to see all the elements of re-developing the underground mine and processing facility coming together so rapidly. The most pleasing aspect is our success in employing an incredible team of people to run the operation and all credit to management for developing great "esprit de corps" and a single sense of purpose as we push to full production."

As previously announced, the startup mine schedule includes mining 2,075 tonnes at 17.8 g/t Au from a developed airleg stope block. The planned stope width is the same as the interpretation of the mineralisation. (Refer to Table 1 in Appendices 1) (VTX ASX announcement 26/06/23).

Given this stope will take some time to extract, the Vertex geology and Mining Team have additionally brought forward a very high-grade long hole stope to commence mining in August as well. Further optimisations to the mining schedule will continue to be made.

This stope can be exploited as soon as services have been established. The mining crews have done a great job in the access drive to make room for the services (11kV cable, water and air lines) while improving accessibility for the mobile mining equipment selected for the Project.

*To view tables and figures, please visit:
https://abnnewswire.net/lnk/OUQP5Z21

 

About Vertex Minerals Limited:  

Vertex Minerals Limited (ASX:VTX,VTXXF) is an Australian based gold exploration company developing its advanced Hargraves and Hill End gold projects located in the highly prospective Eastern Lachlan Fold Belt of Central West NSW. Other Company assets include the Pride of Elvire gold project and Taylors Rock gold/nickel/lithium project both located in the Eastern Goldfields of WA. The focus of Vertex Minerals is to advance the commercial production of gold from its NSW projects embracing an ethical and environmentally sustainable approach.

 

 

Source:
Vertex Minerals Limited

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×