Endeavour Silver Intersects High-Grade Silver-Gold Mineralization at its Guanacevi and Bolañitos Operations

Endeavour Silver Corp. (TSX: EDR, NYSE: EXK) is pleased to report continued high-grade drill results from its 2021 exploration program at the Guanacevi Mine in Durango State, Mexico and the Bolañitos Mine in Guanajuato State, Mexico. Exploration drilling is ongoing at both operations and will continue in 2022.

Highlights from Recent Drill Results

Guanacevi

  • 1.97 gpt Au and 1,254 gpt Ag for 1,412 gpt AgEq over a 3.22 m ETW, including 3.6 gpt Au and 2,690 gpt Ag for 2,978 gpt AgEq over 0.2 m (UCM-67), extending the El Curso orebody along strike

  • 4.36 gpt Au and 1,450 gpt Ag for 1,798 gpt AgEq over a 3.18 m ETW , including 7.97 gpt Au and 4,568 gpt Ag for 5,206 gpt AgEq over 0.31 m (SCSU-11), extending the Santa Cruz South (SCS) orebody to depth

Bolañitos

  • 8.08 gpt Au and 151 gpt Ag for 797 gpt AgEq over a 1.67 m ETW , including 89.6 gpt Au and 880 gpt Ag for 8,046 gpt AgEq over 0.08 m (BS-04), on a new discovery, the Tepetateras vein, located south of current workings

  • 1.26 gpt gold and 241 gpt silver for 342 gpt AgEq over a 0.96 m ETW (BS-03), on the Lulu vein, south of current workings

Abbreviations include: gpt: grams per tonne; Au: gold; Ag: silver; ETW: estimated true width; m: metre; HW: hanging wall. Silver equivalents are calculated at a ratio of 80:1 silver:gold.

Dan Dickson, CEO, commented, "We continue to see exceptional drilling results within the El Curso and the Santa Cruz Sur systems at our Guanacevi silver mine. We have been operating at Guanacevi for more than 15 years and these encouraging results support our view that we can continue to extend the mine life."

Mr. Dickson continued, "Endeavour was built on the drill bit and exploration will continue to be a cornerstone of our strategy as we pursue our vision of being a premier senior silver producer."

At Guanacevi, underground drilling continues to expand down plunge extensions of the El Curso and the Santa Cruz South (SCS) orebodies (view Guanacevi longitudinal sections ). From January through October, more than 14,000 metres in 38 holes have been drilled at Guanacevi from underground.

At Bolañitos, surface and underground drilling has intersected multiple mineralized structures near current workings (view Bolanitos longitudinal sections ). Tepetateras is a new area south of Bolañitos situated 1.7 kilometres from Endeavour Silver's historic Golondrinas Mine. Since the beginning of the year, over 11,500 metres in 59 holes have been drilled at Bolañitos identifying mineralization in structures near current workings.

Guanacevi - El Curso drill results are summarized in the following table:

Hole
Structure
From True Width Au Ag AgEq
(m) (m) (gpt) (gpt) (gpt)
UCM-65
Santa Cruz 219.50 2.45 1.77 736 878
Including 222.85 0.25 5.05 1,973 2,377
UCM-66
Santa Cruz 306.90 2.72 1.62 550 680
Including 311.30 0.29 3.64 1,376 1,667
UCM-67
Santa Cruz 295.15 3.22 1.97 1,254 1,412
Including 301.90 0.23 3.60 2,690 2,978
UCM-68
Santa Cruz 280.50 1.49 0.56 374 419
Including 282.95 0.42 1.18 887 981
UCM-69
Santa Cruz 295.15 2.00 0.84 338 405
Including 297.70 0.21 1.56 567 692
UCM-71
Santa Cruz 281.45 1.58 0.52 187 229
Including 282.10 0.25 1.83 550 697
UCM-74
Santa Cruz 363.85 1.11 0.53 156 198
Including 365.30 0.23 1.31 372 477
UCM-80
Santa Cruz 260.60 1.90 6.64 1,977 2,508
Including 261.90 0.42 15.35 5,320 6,548
UCM-84
Santa Cruz 260.30 0.92 0.57 309 354
Including 261.20 0.39 1.12 578 667

Note: Drill holes UCM-70, UCM-72, UCM-73, UCM-75, UCM-76, UCM-77, UCM-78, UCM-79, UCM-81, UCM-82 returned no significant results

Guanacevi - SCS drill results are summarized in the following table:

Hole
Structure
From True Width Au Ag AgEq
(m) (m) (gpt) (gpt) (gpt)
SCSU-01
Santa Cruz 98.50 1.74 1.26 326 426
Including 99.30 0.27 3.44 650 926
SCSU-02
Santa Cruz 95.20 2.57 1.14 533 624
Including 95.20 0.64 1.69 1,290 1,425
SCSU-03
Santa Cruz 122.85 1.17 0.18 120 135
Including 123.50 0.71 0.19 148 164
SCSU-04
Santa Cruz 159.30 1.86 1.39 608 720
Including 159.80 0.34 2.30 1,037 1,221
SCSU-05
Santa Cruz 157.05 1.12 0.20 109 125
Including 157.85 0.46 0.38 130 161
SCSU-08
Santa Cruz 224.90 1.00 0.13 95 105
Including 225.80 0.33 0.15 111 123
SCSU-10
Santa Cruz 179.10 0.98 2.08 52 218
Including 179.85 0.24 4.15 63 395
SCSU-11
Santa Cruz 136.50 3.18 4.36 1,450 1,798
Including 138.60 0.31 7.97 4,568 5,206
SCSU-12
Santa Cruz 136.00 1.26 1.54 341 464
Including 136.00 0.48 3.11 672 921
SCSU-14
Santa Cruz 173.35 2.17 0.26 193 213
Including 173.35 0.67 0.35 218 245

Note: Drill holes SCSU-06, SCSU-07, SCSU-09, SCSU-13 returned no significant results

Bolañitos - South drill results are summarized in the following table:

Hole
Structure
From True Width Au Ag AgEq
(m) (m) (gpt) (gpt) (gpt)
BS-01
HW Cabrera Carrica 154.20 1.36 0.41 169 202
Including 155.30 0.48 0.24 213 233
BS-02
HW Cabrera Carrica 190.25 1.17 0.77 52 114
Including 190.25 0.31 1.86 165 314
BS-03
Lulú 74.30 0.96 1.26 241 342
Including 74.30 0.11 2.94 789 1025
BS-04
Tepetateras 137.70 1.67 8.08 151 797
Including 140.25 0.08 89.58 880 8046
BS-05
Lulú 20.80 0.93 0.28 104 126
Including 22.00 0.13 1.46 386 502
BS-09
Tepetateras 178.10 3.39 2.63 82 292
Including 186.50 0.10 16.65 95 1427
BS-10
Tepetateras 181.45 0.95 1.01 43 124
Including 182.70 0.29 2.34 116 303
BS-13
Tepetateras 238.65 1.09 1.73 5 143
Including 240.05 0.19 6.02 11 493
BS-15
Tepetateras 151.50 1.39 1.22 119 216
Including 153.40 0.29 3.52 238 520
BS-16
Cabrera Carrica 182.80 1.00 0.22 87 104
Including 182.80 0.77 0.25 102 122
BS-19
Tepetateras 99.60 1.39 1.43 217 331
Including 99.60 1.10 1.80 258 402
Lulú 107.50 1.03 0.14 327 338
Including 107.80 0.80 0.15 331 343

Note: Drill holes LS-01, LS-02, LS-03, LS-04, BS-06, BS-07, BS-08, BS-11, BS-12, BS-14, BS-17, BNU-01, BNU-02, BNU-03 returned no significant results

Bolañitos - Belén drill results are summarized in the following table:

Hole
Structure
From True Width Au Ag AgEq
(m) (m) (gpt) (gpt) (gpt)
BL1S-6
HW Belén 176.25 1.11 1.16 20 113
Including 176.55 0.33 2.12 28 198
Belén 236.15 1.62 1.39 33 144
Including 236.15 0.31 4.11 113 442
BL0.5S-1
HW Belén 97.00 1.06 2.49 73 272
Including 97.00 0.30 6.62 160 690

Note: Drill holes BL1.5-1, BL1.5-2, BL0.5-3, BL4.5S-1 returned no significant results

Silver equivalents are calculated at a ratio of 80:1 silver:gold. All widths are estimated true widths.

Qualified Person and QA/QC - Dale Mah, P.Geo., Vice President Corporate Development of Endeavour Silver, is the Qualified Person who reviewed and approved the technical information contained in this news release. A quality control sampling program of reference standards, blanks and duplicates has been instituted to monitor the integrity of all assay results. All samples are split at the local field office and shipped to SGS Labs, where they are dried, crushed, split and 250 gram pulp samples are prepared for analysis. Gold is determined by fire assay with an atomic absorption finish and silver by aqua regia digestion with ICP finish, over-limits by fire assay and gravimetric finish.

About Endeavour Silver – Endeavour Silver is a mid-tier precious metals mining company that operates two high-grade, underground, silver-gold mines in Mexico. Endeavour is currently advancing the Terronera mine project towards a development decision, pending financing and final permits and exploring its portfolio of exploration and development projects in Mexico, Chile and the United States to facilitate its goal to become a premier senior silver producer.  Our philosophy of corporate social integrity creates value for all stakeholders.

SOURCE Endeavour Silver Corp.

Contact Information
Galina Meleger, Vice President, Investor Relations
Toll free: (877) 685-9775
Tel: (604) 640-4804
Email: gmeleger@edrsilver.com
Website: www.edrsilver.com

Follow Endeavour Silver on Facebook , Twitter , Instagram and LinkedIn

Cautionary Note Regarding Forward-Looking Statements

This news release contains "forward-looking statements" within the meaning of the United States private securities litigation reform act of 1995 and "forward-looking information" within the meaning of applicable Canadian securities legislation. Such forward-looking statements and information herein include but are not limited to statements regarding future prospects of the Company's mines and projects. The Company does not intend to and does not assume any obligation to update such forward-looking statements or information, other than as required by applicable law.

Forward-looking statements or information involve known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, production levels, performance or achievements to be materially different from those expressed or implied by such statements. Such factors include but are not limited to the ultimate impact of the COVID 19 pandemic on operations and results, changes in production and costs guidance, national and local governments, legislation, taxation, controls, regulations and political or economic developments in Canada and Mexico; financial risks due to precious metals prices, operating or technical difficulties in mineral exploration, development and mining activities; risks and hazards of mineral exploration, development and mining; the speculative nature of mineral exploration and development and risks in obtaining necessary licenses and permits,

Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to: the continued exploration and mining operations, no material adverse change in the market price of commodities, mining operations will operate and the mining products will be completed in accordance with management's expectations and achieve their stated production outcomes, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or information, there may be other factors that cause results to be materially different from those anticipated, described, estimated, assessed or intended. There can be no assurance that any forward-looking statements or information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.


News Provided by GlobeNewswire via QuoteMedia

The Conversation (0)
Futuristic 3D holographic visualization of resource and geophysical data analysis.

From Data to Discovery: How AI is Changing the Face of Modern Mining

Mineral exploration is one of the riskiest and most capital-intensive phases of the mining lifecycle. The process has traditionally relied heavily on historical geological records, field surveys and extensive drilling, often with low success rates and long time horizons. But a new wave of digital innovation is reshaping the landscape.

Artificial intelligence (AI) and advanced data analytics are increasingly at the forefront of a quiet revolution in mining, offering tools that enhance discovery potential, reduce exploration risk and deliver stronger returns for investors.

Historically, mineral exploration has been marked by high uncertainty and significant financial risk. Companies spend millions of dollars poring over old geological maps, conducting labor-intensive fieldwork and drilling test holes — all in hopes of finding an economically viable deposit. In fact, industry data suggests that only a tiny fraction of exploration projects — approximately one in a thousand — ever reaches production. This low success rate has often made early-stage mining investments difficult to assess and even harder to justify without deep technical insights or a strong appetite for risk.

Keep reading...Show less
Silver bar surrounded by shiny silver nuggets on a black background.

Top 5 Canadian Silver Stocks of 2025

Silver-mining companies and juniors have seen support from a strong silver price in 2025. Since the start of the year, the price of silver has increased by over 11 percent as of April 11, and it reached a year-to-date high of US$34.38 per ounce on March 27.

Silver’s dual function as a monetary and industrial metal offers great upside. Demand from energy transition sectors, especially for use in the production of solar panels, has created tight supply and demand forces.

Demand is already outpacing mine supply, making for a positive situation for silver-producing companies.

Keep reading...Show less
Stacks of shiny silver bars labeled "FINE SILVER" and "999" purity.

ASX Silver Stocks: 5 Biggest Companies in 2025

Silver is often compared to gold due to its importance in jewellery and as a safe-haven investment.

However, silver has many industrial applications too, including in electronics, automobiles and silverware, as well as medicine and photography. Energy transition applications are a growing demand sector for silver too — the metal is valued for its conductive capacity, which makes it particularly useful in the production of photovoltaic panels.

Silver supply has tightened in recent years as industrial demand rises. This was one of several factors that helped the silver price break through the US$34 per ounce mark in October 2024 for the first time since 2012. Heading into the second quarter of 2025, silver once again tested the US$34 level, although it has pulled back to US$31 amid market volatility as of April 10.

Keep reading...Show less
First Majestic Announces 2024 Sustainability Report and Mailing of 2025 AGM Meeting Materials

First Majestic Announces 2024 Sustainability Report and Mailing of 2025 AGM Meeting Materials

First Majestic Silver Corp. (NYSE: AG) (TSX: AG) (FSE: FMV) (the "Company" or "First Majestic") is pleased to announce the release of its 2024 Sustainability Report and the mailing of its meeting materials for the Company's upcoming 2025 Annual General Meeting of Shareholders (the "2025 AGM").

2024 SUSTAINABILITY REPORT

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
First Majestic Produces 7.7 Million AgEq Ounces in Q1 2025 Including a Record 3.7 Million Silver Ounces

First Majestic Produces 7.7 Million AgEq Ounces in Q1 2025 Including a Record 3.7 Million Silver Ounces

First Majestic Silver Corp. (NYSE: AG) (TSX: AG) (FSE: FMV) (the "Company" or "First Majestic") announces that total production in the first quarter of 2025 from the Company's four producing underground mines in Mexico, namely the Cerro Los Gatos Silver Mine (the Company holds a 70% interest in the Los Gatos Joint Venture that owns the mine), the Santa Elena SilverGold Mine, the San Dimas SilverGold Mine, and the La Encantada Silver Mine reached 7.7 million silver equivalent ("AgEq") ounces, consisting of 3.7 million silver ounces, 36,469 gold ounces, 12.5 million pounds of zinc and 7.5 million pounds of lead.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Anteros Metals CEO Trumbull Fisher.

Anteros Metals Eyes AI-Driven Strategy for Critical Minerals Exploration in Newfoundland

Trumbull Fisher, CEO of Anteros Metals (CSE:ANT), discusses the company's focus on data science and artificial intelligence (AI) to guide strategic exploration at its critical and base metals projects in Newfoundland, Canada, a top mining jurisdiction offering ease of business, government grants and a skilled workforce.

Latest Press Releases

Related News

×