Prime Meridian Resources Corp. Announces Kelly Project Expansion & Financing

Prime Meridian Resources Corp. (TSXV: PMR) ("PMR" or the "Company") is pleased to announce that the Company has acquired, through staking, an additional block of claims contiguous with its Kelly PGM-Cu-Ni Project, bringing the property's total land position to 2,418 hectares. (Figure 1)

The highest recorded historical grab samples on the Kelly Project are: 5.86 g/t 3E (4.16 g/t Pd, 1.10 g/t Pt, 0.6g/t Au), 5.1 g/t 3E (4.37g/t Pd, 0.46g/t Pt, 0.27g/t Au) 0.82% Cu and 0.46% Ni and 4.5 g/t 3E (3.76 g/t Pd, 0.47g/t Pt, 0.27g/t Au) 0.72% Cu and 0.27% Ni. (1) *

* Note: 3E = Pt + Pd + Au. The reader is cautioned that grab rock samples are selective by nature and may not represent the true grade or style of mineralization on the Property.

Copper and nickel are central metals for the EV and Alternative Energy revolution and platinum and palladium are used in catalytic converters for decreasing auto emissions. Platinum in particular is also used as a catalyst to improve the efficiency of hydrogen fuel cells.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/5386/97846_39bc3623f4dc9ba3_001.jpg

Figure 1. Expanded Claim Area

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/5386/97846_39bc3623f4dc9ba3_001full.jpg

Kelly Project Overview

The Sudbury Basin of Northern Ontario, has historically been one of the world's most prolific copper, nickel and PGM mining camps but the outlying areas have been generally underexplored.

The Kelly Project is located approximately 20 kilometres directly east of the Sudbury Basin and is host to regionally anomalous palladium (Pd), platinum (Pt), copper (Cu), nickel (Ni), and gold (Au) values, associated with sulphides hosted by rocks of the Nipissing Diabase.

At the Kelly Project, platinum-group metals (Pt, Pd, Au) and Cu-Ni sulphide (chalcopyrite, pyrrhotite and pentlandite) occur primarily as disseminations and blebs within medium grained, relatively homogenous hypersthene-bearing gabbroic rocks of the Nipissing Diabase. The main sulphide showing is exposed over approximately 1,500 square metres, with several sulphide showings within several hundred metres of the main showing. (1,2)

Mineralization at the Kelly Project appears to be confined to a massive, hypersthene-bearing gabbro unit that extends for at least 1,000 metres along the northern edge of the Kukagami Lake Intrusion. This massive gabbro unit dips southward at about 40 degrees with the mineralized regions occurring between 50 and 100 m above the basal contact. Numerous palladium, platinum, copper, and nickel geochem anomalies have been outlined along with numerous high priority IP anomalies, and remain largely untested. (1,2)

The highest recorded historical grab samples on the Kelly PGM-Cu-Ni Project are: 5.86 g/t 3E (4.16 g/t Pd, 1.10 g/t Pt, 0.6g/t Au), 5.1 g/t 3E (4.37g/t Pd, 0.46g/t Pt, 0.27g/t Au) 0.82% Cu and 0.46% Ni and 4.5 g/t 3E (3.76 g/t Pd, 0.47g/t Pt, 0.27g/t Au) 0.72% Cu and 0.27% Ni. (1) *

* Note: 3E = Pt + Pd + Au. The reader is cautioned that grab rock samples are selective by nature and may not represent the true grade or style of mineralization on the Property.

Financing

The Company also announces a non-brokered private placement financing for aggregate gross proceeds of up to $700,000 (the "Financing").

The Financing will consist of up to 2,000,000 units at $0.15 ("Unit"), each Unit consisting of 1 common share of the Company and 1 common share purchase warrant ("Warrant") each Warrant being exercisable for an additional common share at an exercise price of $0.25 for 12 months.

The Financing will also include up to 2,000,000 flow-through units at $0.20 ("FT Unit"), each FT Unit consisting of 1 flow-through common share of the Company and one-half (1/2) of a common share purchase warrant ("FT Warrant"), each FULL FT Warrant being exercisable for an additional common share of the Company at an exercise price of $0.30 for 12 months.

Both the Warrants and the FT Warrants will be subject to the right of the Company to accelerate the exercise of the warrants if the shares of the Company trade at or above 50 cents for a period of 10 consecutive trading days. Finders' fees in accordance with TSX Venture Exchange policies may apply to the Financing and all securities issued will be subject to a statutory four-month hold period.

Proceeds raised from the FT Units will be used before 2023 for general exploration expenditures in Ontario that will constitute exploration expenses (within the meaning of Subsection 66(15) of the Income Tax Act (Canada)), which will qualify as flow-through mining expenditures with the meaning of the Income Tax Act.

Qualified Person

The technical contents of this release were approved by Case Lewis, P.Geo., a Qualified Person as defined by National Instrument 43-101.

References

(1) Jobin-Bevans, S., 1999. Work Report: Phase 1, Kelly Property (Kukagami Lake Intrusion), Kelly Township, Sudbury Mining District, Ontario, Prepared for Goldwright Exploration Inc. AFRI ID 41I15SE2006.

(2) Jobin-Bevans, S., 1999. Work Report: Phase 5, Kelly Property (Kukagami Lake Intrusion), Kelly Township, Sudbury Mining District, Ontario, Prepared for Goldwright Exploration Inc. AFRI ID 41I15SE2030.

On behalf of the Board of Directors of

Prime Meridian Resources Corp.

"Brian Leeners"

Brian Leeners, CEO & Director
ir@primemeridianresources.com

The TSX Venture Exchange has neither approved or disapproved the contents of this press release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/97846

News Provided by Newsfile via QuoteMedia

The Conversation (0)
Heliostar Files Technical Reports on Mines and Development Project Recently Acquired in Mexico

Heliostar Files Technical Reports on Mines and Development Project Recently Acquired in Mexico

Company Overview on La Colorada:

  • La Colorada Operations show US$25.9M NPV5, 11.9% IRR, US$53.9M CAPEX and 287k total ounces produced at a US$2,000/oz gold price
  • New mineral reserve at Junkyard Stockpile supports restart of mining at La Colorada that has commenced this month
  • El Crestón expansion at La Colorada is expected to produce over 50,000 ounces of gold per year
  • Current drill program (five drill rigs) is targeting lower CAPEX and increased production for updated technical report planned for mid-2025
Au Price
(US$/oz Au)
Net Cash Flow
(US$M)
After-Tax NPV
@ 5.0% Discount Rate
(US$M)
IRR
(%)
Payback Period
(years)
Payback Multiple
2,000 154.9225.9311.92.21.4
2,600 2158.32110.0334.71.42.3

 

News Provided by Newsfile via QuoteMedia

Keep reading...Show less

B2Gold Announces Amended Shareholder Return Strategy, including New Dividend Framework and Intention to Implement a Normal Course Issuer Bid

B2Gold Corp. (TSX: BTO, NYSE AMERICAN: BTG, NSX: B2G) ("B2Gold" or the "Company") announces amendments to its shareholder returns strategy to increase financial flexibility as it completes its current phase of organic growth, including the anticipated commencement of initial production from Fekola Regional in Mali, the completion of construction of the Goose Mine in Nunavut, Canada, the development of the Antelope deposit at the Otjikoto Mine in Namibia, and de-risking activities at the Gramalote Project in Colombia. All dollar figures are in United States dollars unless otherwise indicated.

New Dividend Framework

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

B2Gold Announces Amended Shareholder Return Strategy, including New Dividend Framework and Intention to Implement a Normal Course Issuer Bid

B2Gold Corp. (TSX: BTO, NYSE AMERICAN: BTG, NSX: B2G) ("B2Gold" or the "Company") announces amendments to its shareholder returns strategy to increase financial flexibility as it completes its current phase of organic growth, including the anticipated commencement of initial production from Fekola Regional in Mali, the completion of construction of the Goose Mine in Nunavut, Canada, the development of the Antelope deposit at the Otjikoto Mine in Namibia, and de-risking activities at the Gramalote Project in Colombia. All dollar figures are in United States dollars unless otherwise indicated.

New Dividend Framework

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

B2Gold Announces Total Consolidated Gold Production for 2024 of 804,778 oz, Within the Revised 2024 Guidance Range; Total Gold Production for 2025 Anticipated to be Between 970,000 and 1,075,000 oz; Goose Project Remains On Track for First Gold in Q2 2025 and Total Capital Estimate Remains at C$1,540 Million

B2Gold Corp. (TSX: BTO, NYSE AMERICAN: BTG, NSX: B2G) ("B2Gold" or the "Company") is pleased to announce its gold production and revenue results for the fourth quarter and full year 2024, as well as its 2025 total gold production guidance and 2025 cost guidance for its current operating mines. All dollar figures are in United States dollars unless otherwise indicated.

Q4 and Full Year 2024 Highlights

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

Kinross to announce 2024 Q4/full-year results and 2025 guidance on February 12, 2025

Kinross Gold Corporation (TSX: K; NYSE: KGC) (the "Company") will release its 2024 fourth-quarter and full-year financial statements and operating results on Wednesday, February 12, 2025, after market close. The Company will also provide its full-year 2025 guidance, mineral reserve, and mineral resource statement as of December 31, 2024, and an exploration and project update. Kinross will hold a conference call and audio webcast on Thursday, February 13, 2025, at 8 a.m. ET to present the results, followed by a question-and-answer session.

The call-in numbers for the conference call on Thursday, February 13, 2025, at 8 a.m. ET are as follows:

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

Kinross to announce 2024 Q4/full-year results and 2025 guidance on February 12, 2025

Kinross Gold Corporation (TSX: K; NYSE: KGC) (the "Company") will release its 2024 fourth-quarter and full-year financial statements and operating results on Wednesday, February 12, 2025, after market close. The Company will also provide its full-year 2025 guidance, mineral reserve, and mineral resource statement as of December 31, 2024, and an exploration and project update. Kinross will hold a conference call and audio webcast on Thursday, February 13, 2025, at 8 a.m. ET to present the results, followed by a question-and-answer session.

The call-in numbers for the conference call on Thursday, February 13, 2025, at 8 a.m. ET are as follows:

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×