Base Metals

Northern Lights Resources Corp. ("Northern Lights" or the "Company") (CSE:NLR)(OTCQB:NLRCD) is pleased to announce start of the 2022 exploration program at the Medicine Springs Silver Project ("Medicine Springs"), located in Elko County, Nevada, that the Company is exploring in joint venture with Reyna Silver Corp. (Reyna Silver

The 2022 exploration program at Medicine Springs will include a 5,000 to 7,000 metre drill program targeting the discovery of a large scale Carbonate Replacement Deposit (CRD) system. Drill permitting is underway and work is commencing immediately on additional field studies to further refine drill targets. Drilling is expected to commence in Q3/Q4 2022.

Norhern Lights CEO, Jason Bahnsen commented "We are delighted to have work underway at Medicine Spings leading to the upcoming 5,000 to 7,000 metre drill program. The Medicine Springs Project has the potential to host large scale CRD silver and base metals mineralizaton and we are looking forward to seeing the results of this initial drill program."

Northern Lights Resources Corp., Thursday, May 26, 2022, Press release picture
Figure 1 - Medicine Springs Project Area Showing Proposed Drilling Area

Under the terms of the Opton/JV agreement between Northern Lights and Reyna Silver, Reyna Silver are earning up to 80% of the Medicine Springs Project. Northern Lights does not contribute to project exploration expenditure until total exploration expenditures have exceeded US$4.0 million. (See the Northern Lights announcement dated October 5, 2020 for full details of the Option/JV agreement with Reyna Silver.)

In 2021, Reyna Silver conducted a Selective Jasperoid Sampling survey focused on the prominent NE trending, multi-stage jasperoids that cut across the property along the inferred principal hydrothermal fluid pathways. The results show zoning of Copper, Lead-Zinc, and Silver and are interpreted to indicate a multi-stage high-level mineralization center at depth. Comparison of the field data to Reyna's CRD continuum exploration model supports the idea that the full CRD spectrum is present within the Medicine Springs project area.

Competent Persons Statement

Information in this report relating to Exploration Results is based on information reviewed by Mr. Lee R. Beasley, a Certified Professional Geologist who is a Member of the American Institute of Professional Geologists, and a consultant to Northern Lights Resources. Mr. Beasley has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Qualified Person for the purposes of NI43-101 Standards of Disclosure for Mineral Projects. Mr. Beasley consents to the inclusion of the data in the form and context in which it appears.

For further information, please contact:

Albert Timcke, Executive Chairman and President
Email: rtimcke@northernlightsresources.com
Tel: +1 604 608 6163

Jason Bahnsen, Chief Executive Officer
Email: Jason@northernlightsresources.com
Tel: +1 604 608 6163

Shawn Balaghi, Investor Relations
Email: shawn@northernlightsresources.com
Tel: +1 604 773 0242

About Northern Lights Resources Corp.

Northern Lights Resources Corp is a growth-oriented exploration and development company that is advancing two projects: The 100% owned, Secret Pass Gold Project located in Arizona; and the Medicine Springs silver-zinc-lead Project located in Elko County Nevada where Northern Lights, in joint venture with Reyna Silver are earning 100% ownership. Northern Lights Resources is a member of the Arizona Mining Association.

Northern Lights Resources trades under the ticker of "NLR" on the CSE and "NLRCD" on the OTCQB. This and other Northern Lights Resources news releases can be viewed at www.sedar.com and www.northernlightsresources.com.

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: This news release includes certain "forward-looking statements" under applicable Canadian securities legislation. Forward-looking statements include, but are not limited to, statements with respect to: the terms and conditions of the proposed private placement; use of funds; the business and operations of the Company after the proposed closing of the Offering. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking statements. Such factors include, but are not limited to: general business, economic, competitive, political and social uncertainties; delay or failure to receive board, shareholder or regulatory approvals; and the uncertainties surrounding the mineral exploration industry. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward looking statements. The Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law.

SOURCE: Northern Lights Resources Corp.



View source version on accesswire.com:
https://www.accesswire.com/702778/Medicine-Springs-Drill-Program

News Provided by ACCESSWIRE via QuoteMedia

NLR:CNX
Northern Lights Announces Non-Brokered Private Placement of Up to $1 Million

Northern Lights Announces Non-Brokered Private Placement of Up to $1 Million

NOT FOR DISTRIBUTION TO OR FOR DISSEMINATION IN THE UNITED STATES

Northern Lights Resources Corp. ("Northern Lights", "NLR" or the "Company")(CSE:NLR)(OTCQB:NLRCF) announces that it intends to complete a non-brokered private placement (the "Placement") for gross proceeds of up to C$1,000,000 from the sale of common shares of the Company (the "Shares") at a price of C$0.075 per Share

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Northern Lights Announces Change to Effective Date of Share Consolidation

Northern Lights Announces Change to Effective Date of Share Consolidation

Northern Lights Resources Corp. ("Northern Lights", "NLR" or the "Company")(CSE:NLR)(OTCQB:NLRCF) announces that the effective date of the ten (10) for one (1) share consolidation (the "Consolidation"), as announced on May 17, 2022, has been changed to May 26, 2022 (the "Effective Date

All other terms of the Consolidation remain unchanged. Please refer the May 17, 2022 announcement for full details.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Northern Lights Announces Share Consolidation

Northern Lights Announces Share Consolidation

Northern Lights Resources Corp. ("Northern Lights", "NLR" or the "Company") (CSE:NLR), (OTCQB:NLRCF) is pleased to announce that it is proceeding with the consolidation of its common shares on a ten (10) for one (1) basis (the "Consolidation"). The Company's common shares will commence trading on a post-consolidated basis effective at market opening on May 24, 2022 (the "Effective Date

Immediately prior to completion of the Consolidation, the Company has 143,571,385 common shares issued and outstanding. After giving effect to the Consolidation, the Company will have approximately 14,357,139 common shares issued and outstanding, subject to the rounding of fractional common shares. The company has been issued with a new Cusip Number (66538D301), there will be no escrow of shares, and the trading symbol will remain unchanged.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Tin Cup Exploration Update

Tin Cup Exploration Update

Northern Lights Resources Corp. ("Northern Lights" or the "Company") (CSE:NLR)(OTCQB:NLRCF) is pleased to announce an update to the exploration plan for the Tin Cup prospect at the Company's 100% owned Secret Pass Gold Project in Mohave County, Arizona

Following on from the success of the initial four holes completed, Northern Lights is planning to expand the exploration program at Secret Pass to include the drilling of three (3) additional holes at Tin Cup and two (2) drill holes at the FM Zone, which is located approximately 500 metres east of Tin Cup. All five (5) proposed drill holes are fully permitted. The drill holes statistics and significant intersections for the first four drill holes are sumarized on Table 1. The location of the recent drill holes and the planned drill holes for Tin Cup and the FM Zones are illlustrated on Figure 1.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
InvestmentPitch Media Video Discusses Northern Lights' Report of Additional High-Grade Assay Results from its Third and Fourth Drill Holes at its Tin Cup Prospect at its Secret Pass Gold Project in Arizona

InvestmentPitch Media Video Discusses Northern Lights' Report of Additional High-Grade Assay Results from its Third and Fourth Drill Holes at its Tin Cup Prospect at its Secret Pass Gold Project in Arizona

Northern Lights Resources (CSE:NLR) (OTCQB:NLRCF) reports additional high-grade assay results from its third and fourth drill holes at its Tin Cup Prospect at its Secret Pass Gold Project in Arizona. The 100%-owned Secret Pass Gold Project is located in the Frisco-Catherine Gold district of Northwest Arizona, is approximately 8 kilometers Northeast of Elevation Gold's Moss Mine, a heap leach open pit gold mine currently operating at an average mined grade of 0.45 gt gold. Following the acquisition of an additional 260 hectares in September 2021, the Secret Pass Gold Project now covers approximately 1,128 hectares.

A Media Snippet accompanying this announcement is available by clicking on the image or link below:

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Electric Royalties to Sell Two Thirds of Its 1.5% Net Smelter Royalty on the Seymour Lake Lithium Deposit for C$4,000,000 Cash

Electric Royalties to Sell Two Thirds of Its 1.5% Net Smelter Royalty on the Seymour Lake Lithium Deposit for C$4,000,000 Cash

Electric Royalties Ltd. (TSXV:ELEC)(OTCQB:ELECF) ("Electric Royalties" or the "Company") is pleased to announce the signing of an agreement on June 27, 2022 to sell 1% of its existing 1.5% Net Smelter Royalty ("NSR") on the Seymour Lake Lithium Deposit in Ontario, Canada, to Lithium Royalty Corp. ("LRC"). For more information on the Seymour Lake Lithium Deposit, see Electric Royalties' news release on February 17, 2021

Brendan Yurik, CEO of Electric Royalties,commented: "The sale of part of our Seymour Lake royalty will unlock some of the value in our portfolio. The Company acquired the 1.5% NSR in 2021 for 3,000,000shares, prior to the substantial increase of the lithium price this past year1. This partial sale along with the cash from our recent financing will enable us to deploy capital into additional nearer-term production opportunities with a view to increasing cash flow. We believe our current valuation does not reflect the value of our royalty portfolio of 19 royalties acquired to date, with potential for promising cash flow over the next few years."

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Battery Mineral Resources Announces Intercept of 48 Meters of 1.31% Cu From the Cinabrio Norte Target at Its Punitaqui Copper Mine in Chile

Battery Mineral Resources Announces Intercept of 48 Meters of 1.31% Cu From the Cinabrio Norte Target at Its Punitaqui Copper Mine in Chile

Battery Mineral Resources Corp. (TSXV: BMR) (OTCQB: BTRMF) ("Battery" or "BMR" or the "Company") is pleased to announce encouraging drill core assay results from the recently completed Phase 1 2021-2022 exploration and infill diamond drill program focused on extensions of the Cinabrio orebody, the Dalmacia target and the San Andres target within the Punitaqui mine complex ("Punitaqui") in Chile. The Punitaqui mine is slated for resumption of mine operations in the second half of 2022.

The Cinabrio Norte target represents a potential northern extension of the main Cinabrio mine orebody, which was historically the primary source of ore feed to the Punitaqui copper ore concentration plant for eight-plus years. These drill results continue to highlight the presence of strong copper mineralization and the significant vertical extent of the Cinabrio Norte target (see Figure 1).

News Provided by Newsfile via QuoteMedia

Keep reading...Show less

Mason Graphite Files Management Information Circular for Special Shareholders' Meeting

  • Special Meeting called to consider and vote on the Proposed JV Transaction with Nouveau Monde Graphite
  • Shareholders also to consider and vote on a proposed change of business of Mason Graphite from a "Tier 2 mining issuer" to a "Tier 2 investment issuer"
  • Board recommends that shareholders vote FOR the Proposed JV Transaction with Nouveau Monde Graphite and the Proposed Change of Business

Mason Graphite Inc. (" Mason Graphite " or the " Company ") (TSX-V: LLG) (OTCQX: MGPHF) today announced that it has filed and is in the process of mailing the management information circular (the " Circular ") and related materials for the special meeting (the " Special Meeting ") of shareholders of Mason Graphite (" Shareholders ") called for the following purposes:

(i) to consider and, if deemed advisable, to pass an ordinary resolution (the " JV Resolution ") approving, among other things, the entering into of an option and joint venture agreement with Nouveau Monde Graphite Inc. (" Nouveau Monde ") (NYSE: NMG) (TSX-V: NOU), pursuant to which (A) Mason Graphite will grant to Nouveau Monde a sole, exclusive, irrevocable and non-assignable option to acquire a fifty-one percent (51%) undivided co-ownership interest in the Lac Guéret property owned by the Company (the " Lac Guéret Property ") and other related assets (the " Option ") and, (B) upon the exercise of such Option by Nouveau Monde, form of a joint venture with Nouveau Monde to undertake exploration, development and mining activities at the Lac Guéret Property (the " Joint Venture ") (the granting of the Option and the formation of the Joint Venture being hereinafter referred to as the " Proposed JV Transaction ") pursuant to Policy 5.3 – Acquisitions and Dispositions of Non-Cash Assets of the TSX Venture Exchange (the " TSX-V ");

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
South Star Battery Metals Announces Closing of Non-Brokered Private Placement

South Star Battery Metals Announces Closing of Non-Brokered Private Placement

South Star Battery Metals Corp. ("South Star" or the "Company") (TSXV: STS) (OTCQB: STSBF), is pleased to announce that it has completed a non-brokered private placement of units (the "Private Placement" or the "Offering") for total proceeds of C$1,906,990. The majority of participation in the Private Placement was with key institutional investors and insiders. Net proceeds from the Private Placement will be used for advanced materials sample preparation, commercial agreements, project finance and general working capital requirements for the Company.

The Private Placement consists of 3,467,254 units priced at post-consolidation price of C$0.55 per unit (the "Units"). Each Unit consists of one (1) common share and one (1) common share purchase warrant (the "Warrants"). Each Warrant entitles the holder to purchase one additional common share of the Company at an exercise price of C$1.25 per common share for a period of five years from the date of issue. The securities are subject to a four-month hold period from the date of closing and approval by the TSXV, expiring October 24, 2022.The Company issued an aggregate of 1,636 finders' warrants in connection with the Private Placement (equal to 6% of the number of Units sold to subscribers introduced to the Company by the finders) and $54,300 in cash finders' fees were paid to certain finders (equal to 6% of the gross proceeds of the offering sold to subscribers introduced to the Company by the finders).

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Battery Mineral Resources Announces Annual General and Special Meeting of Shareholders

Battery Mineral Resources Announces Annual General and Special Meeting of Shareholders

Battery Mineral Resources Corp. (TSXV: BMR) (OTCQB: BTRMF) ("Battery" or "BMR" or the "Company") is pleased to announce that its Annual General and Special Meeting ("AGM") will be held virtually on June 28th, 2022, at 4:00 p.m. EDT 1:00 p.m. PST.

Shareholders of record as of May 24th, 2022, are entitled to vote their common shares of the Company ("Common Shares") at the AGM. The Company encourages its shareholders to vote in advance of the AGM using the Voting Instruction Form or the Form of Proxy that were mailed to them with the meeting materials. Shareholders are reminded that proxies must be received by 4:00 p.m. EDT / 1:00 p.m. PST on June 24th, 2022. Copies of the meeting materials are available under Battery's SEDAR profile at www.sedar.com.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less

Altech Chemicals Ltd Silumina Anodes Pilot Plant Construction Contract Executed

Perth, Australia (ABN Newswire) - Altech Chemicals Limited (ASX:ATC) (FRA:A3Y) is pleased to announce that following a site visit this week by Altech's senior management in Saxony, Germany, a final construction contract for the Silumina AnodesTM pilot plant with Kuttner GmbH & Co. KG (Kuttner) was executed.

Highlights

- Silumina AnodesTM pilot plant construction contract executed with Kuttner GmbH & Co

- Final plant engineering design and cost estimation completed

- Strong experience in delivering metallurgical plant projects

- Long lead items procurement has already commenced

German engineering firm Kuttner has completed the final plant engineering design and cost estimation.

The Basic Engineering phase has confirmed key design parameters, locking in key equipment capacities and validating operational criteria. Kuttner will immediately commence the procurement process, and construction of the pilot plant will follow when equipment begins arriving towards the back end of this year.

The pilot plant is designed to produce 120kg per day of Silumina AnodesTM coated battery anode material, which will be made available to selected European battery manufacturers and auto-makers. The pilot plant will be established in Dock3 (leased warehouse space), next door to Altech's land in Schwarze Pumpe Industrial Park in Saxony, Germany.

Altech, with its cash position at the end of March 2022 of A$11.571 million, is well funded to construct and complete the pilot plant. The pilot plant is estimated to cost A$7.177 million, of which A$5.382 million will be funded by Altech (75% owner) and A$1.794 million will be funded by Altech Advanced Materials AG (25% owner).

Kuttner is a German-based industrial plant engineering and EPC contractor, with strong experience in design, procurement, project and construction management and plant commissioning across a range of industries. They have previously completed metallurgical plant, water and off-gas treatment projects in Germany. Kuttner bringing valuable local knowledge to the execution of the project.



About Altech Chemicals Ltd:

Altech Chemicals Limited (ASX:ATC) (FRA:A3Y) is aiming to become one of the world's leading suppliers of 99.99% (4N) high purity alumina (Al2O3) through the construction and operation of a 4,500tpa high purity alumina (HPA) processing plant at Johor, Malaysia. Feedstock for the plant will be sourced from the Company's 100%-owned kaolin deposit at Meckering, Western Australia and shipped to Malaysia.

HPA is a high-value, high margin and highly demanded product as it is the critical ingredient required for the production of synthetic sapphire. Synthetic sapphire is used in the manufacture of substrates for LED lights, semiconductor wafers used in the electronics industry, and scratch-resistant sapphire glass used for wristwatch faces, optical windows and smartphone components. Increasingly HPA is used by lithium-ion battery manufacturers as the coating on the battery's separator, which improves performance, longevity and safety of the battery. With global HPA demand approximately 19,000t (2018), it is estimated that this demand will grow at a compound annual growth rate (CAGR) of 30% (2018-2028); by 2028 HPA market demand will be approximately 272,000t, driven by the increasing adoption of LEDs worldwide as well as the demand for HPA by lithium-ion battery manufacturers to serve the surging electric vehicle market.



Source:
Altech Chemicals Ltd

News Provided by ABN Newswire via QuoteMedia

[subscribe_company_profile use_post="101821931"]

Keep reading...Show less

Latest Press Releases

Related News

×