ASX:GTR

Positive Start To Wyoming Uranium Drilling Best Hole Intersects 27.5ft @ 0.044% Eu308 For 1.92gt

GTI Resources Ltd (GTI or Company) is pleased to advise that 2 mud rotary drill rigs have now completed the first 10 holes of its 50,000‐foot (~15,000 metre) ~100‐hole maiden drill program within exploration area 1 (Exparea1) at the Thor ISR uranium project in Wyoming’s Great Divide basin (Figure1).


Highlights:

  • First 10 holes completed of the 50,000ft (~15,000m)~100‐hole maiden drill program
  • Encouraging results with mineralisation meeting expectations for economic ISR recovery
  • Best holes to date of 27.5ft at 0.44% (440ppm) eU308 for a Grade Thickness (GT) of 1.92 & 23 ft at 0.63%(630ppm) eU308 for GT of 1.741
  • 5 out of 10 holes met both grade and GT cut off or an averageGT of 0.99 GT
  • Mineralisation appears conducive to ISR recovery with water table 100 ft above hosts and
  • At least three separate roll fronts are present in the main hosts and unit with additional sands positioned above & below the main sand unit showing trace mineralisation.

Figure 1. Thor Project Uranium Drilling Location Map, Great Divide Basin, Wyoming USA.


Click here for the full ASX Release

This article includes content from GTI Resources, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

GTR:AU
GTI Energy

GTI Energy Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
GTI Energy

GTI Energy


Keep reading...Show less
uranium news

Rigs Secured For Wyoming Uranium Drilling & Utah Fieldwork Completed

GTI Resources Ltd (GTI or Company) is pleased to advise that 2 mud rotary drill rigs have been secured for its planned drilling campaign at the Thor ISR uranium project in Wyoming’s Great Divide basin (Figure 1). As previously advised, GTI is on track to commence drilling during December. This maiden drill program is designed to confirm the grade and tenor of uranium mineralisation that was previously identified by Kerr McGee in the 1970’s & 80’s and to ultimately support definition of an economic uranium resource.

Figure 1. Thor Project Uranium Drilling Location Map, Great Divide Basin, Wyoming USA

Keep reading...Show less

Ur-Energy to Hold 2024 Q1 Earnings Webcast and Teleconference

Ur-Energy Inc. (NYSE American:URG)(TSX:URE) (the "Company" or "Ur-Energy") invites you to attend its 2024 Q1 webcastteleconference on May 8, 2024

Ur-Energy management will provide a review of our 2024 Q1 operations and results. A Q&A session will follow the presentation.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
  Alligator Energy Limited

Extension of Uranium Mineralisation at Samphire Uranium Project Blackbush Deposit

Alligator Energy Limited (ASX: AGE, ‘Alligator’ or ‘the Company’) is pleased to announce significant uranium mineralisation intersections from its resource extension drilling program at the Samphire Uranium Project, near Whyalla, South Australia.

Keep reading...Show less
Gladiator Resources

3rd Quarter Activities and Appendix 5B

Gladiator Resources Ltd (ASX: GLA) (Gladiator or the Company) is pleased to provide shareholders with the Company’s Activities and Appendix 5B Report for the quarter ending 31 March 2024.

HIGHLIGHTS

Keep reading...Show less
  Boss Energy

Highly successful quarter sees Boss make pivotal transition to global uranium producer

Production and cashflow ramp-up underway at Honeymoon; Commissioning proceeding to plan at Alta Mesa with production set to start in May

Boss Energy Limited (ASX: BOE; OTCQX: BQSSF; the “Company”; “Boss”) is pleased to provide its first quarterly report as a fully-fledged uranium producer.

Highlights

Keep reading...Show less

NexGen Announces Upsized C$224 Million CDI Offering in Australia

NexGen Energy Ltd. ("NexGen" or the "Company") (TSX: NXE) (NYSE: NXE) (ASX: NXG) is pleased to announce that it has entered into an amended and restated placement agreement dated April 30, 2024 (the " Placement Agreement ") with a lead manager and bookrunner in Australia Aitken Mount Capital Partners  (the " Lead Manager ") to upsize its previously announced Australian offering to be 20,161,290 common shares (the " Shares ") of the Company, at a price of C$11.11 per Share (based on the daily average exchange rate of A$1.00 = C$0.8963 published by the Bank of Canada on April 29, 2024 ) for aggregate gross proceeds of approximately C$224 million (the " Offering "). Canaccord Genuity acted as Lead Co-Manager to the Offering.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

NexGen Announces Upsized C$224 Million CDI Offering in Australia

NexGen Energy Ltd. ("NexGen" or the "Company") (TSX: NXE) (NYSE: NXE) (ASX: NXG) is pleased to announce that it has entered into an amended and restated placement agreement dated April 30, 2024 (the " Placement Agreement ") with a lead manager and bookrunner in Australia Aitken Mount Capital Partners  (the " Lead Manager ") to upsize its previously announced Australian offering to be 20,161,290 common shares (the " Shares ") of the Company, at a price of C$11.11 per Share (based on the daily average exchange rate of A$1.00 = C$0.8963 published by the Bank of Canada on April 29, 2024 ) for aggregate gross proceeds of approximately C$224 million (the " Offering "). Canaccord Genuity acted as Lead Co-Manager to the Offering.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
GTI Energy

GTI Energy Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×