Azzuro Resources

Maiden Exploration Targets Define District Scale Copper Potential at Oval and Red Hill

Azzuro Resources PLC (“Azzuro” or the “Company”) (ASX: AZ9) is pleased to announce maiden JORC (2012) Exploration Target estimates at both its 100%-owned Oval Cu-Ni-PGE and the Red Hill (Maikhan Uul) Cu-Au-VMS projects, the Company’s two flagship assets located in southwest Mongolia.

HIGHLIGHTS:

  • Maiden JORC (2012) Exploration Targets estimated at the Oval Cu-Ni-PGE and Red Hill CuAu-VMS projects — just 8km apart within a single exploration corridor — underlining the district-scale, multi-commodity potential of the Company's southwest Mongolia portfolio.
  • The project proximity supports the potential for shared infrastructure, camp facilities, permitting efficiencies and a unified development pathway as both projects mature.
  • A combined 14 hole ~5,835m priority drilling program has been designed to test the highest-priority Exploration Target bodies at both projects.
  • A separate, lower-cost pathway of 3 holes (290m) at Oval and 11 holes (1,760m) at Red Hill could convert a portion of both targets to JORC (2012) Inferred Mineral Resource status.
  • Drilling is imminent and geophysical studies (DHEM and 3DIP) are commenced

Azzuro’s Managing Director, Gan-Ochir Zunduisuren, commented: "These maiden Exploration Targets confirm exactly what we've long believed — Oval and Red Hill aren't two isolated discoveries, they're one fertile mineralised corridor. That's genuine district-scale exposure to copper, nickel, gold and PGEs in one of the world's most under-explored, strategically located and low cost jurisdiction. We have a capital-efficient path forward to advance to a JORC resource."

Two Adjacent, Complementary Projects

While the two systems host different styles of mineralisation — Oval a magmatic copper-nickelPGE sulphide system, and Red Hill a deformed volcanogenic massive sulphide ("VMS") coppergold system — their proximity (merely 8km apart) gives Azzuro the opportunity to plan exploration, infrastructure and longer term development on a combined, district-wide basis rather than as two standalone projects. The Exploration Target estimates are:

Red Hill Cu-Au VMS - 15Mt to 30Mt at 0.71% to 0.9% Cu and 0.26g/t to 0.4g/t Au;

Oval Cu-Ni - 6Mt to 25Mt at 0.3% to 0.7% Cu, 0.26% to 0.6% Ni, for 0.59% to 1.5% CuEq.

The potential quantity and grade of the Exploration Targets is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource, and it is uncertain if further exploration will result in the estimation of a Mineral Resource. The Exploration Targets have been prepared and reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, 2012 Edition ("JORC Code").

Oval and Red Hill are located just 8km apart within Azzuro’s southwest Mongolia project portfolio, connected by existing local infrastructure and situated within the same regional structural corridor of the Central Asian Orogenic Belt. The Exploration Target estimate suggests a potential of 21Mt to 55Mt of mineralisation.*

* Important Note on Combined Figures: The combined 21Mt to 55Mt range referred to in this announcement is the arithmetic sum of the separately estimated Oval and Red Hill Exploration Targets and is provided for illustrative, portfolio-level context only. The two Exploration Targets relate to different styles of mineralisation (magmatic Cu-Ni-PGE at Oval; VMS Cu-Au at Red Hill), are reported on different bases (copper-equivalent at Oval; copper-only at Red Hill) and have been estimated independently using different methodologies. They should not be read as, or aggregated into, a single Exploration Target, and each should be considered separately by reference to the detailed estimates, methodologies and cautionary statements set out below.

The Exploration Targets have been independently estimated by Mine Project Consult ("MPC"), with block modelling support from SLR Consulting Australia Pty Ltd ("SLR"), based on drilling, geological mapping and geophysical data compiled up to July 2026.

Whilst subject to future studies, the Company considers that the close proximity of the Oval and Red Hill projects offers the potential for:

  • shared site infrastructure, camp facilities, roads and power as both projects are advanced;
  • a single, consolidated environmental and community engagement footprint across the district;
  • combined technical and drilling teams and equipment working across both projects, improving capital efficiency; and
  • a broader range of future development pathways, including the potential to process multiple ore types through shared or complementary infrastructure.

Figure 1. Location plan map of Oval and Red Hill projects

Click here for the full ASX Release

This article includes content from Azzuro Resources PLC, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

AZ9:AU
Azzuro Resources

Azzuro Resources Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Azzuro Resources

Azzuro Resources

Progressing a high-grade copper and base metals pipeline in Mongolia

Progressing a high-grade copper and base metals pipeline in Mongolia Keep Reading...
Gravity Survey Expands Red Hill Copper-Gold Potential

Gravity Survey Expands Red Hill Copper-Gold Potential

Azzuro Resources (AZ9:AU) has announced Gravity Survey Expands Red Hill Copper-Gold PotentialDownload the PDF here. Keep Reading...
Quarterly Activities/Appendix 5B Cash Flow Report

Quarterly Activities/Appendix 5B Cash Flow Report

Azzuro Resources (AZ9:AU) has announced Quarterly Activities/Appendix 5B Cash Flow ReportDownload the PDF here. Keep Reading...
High-Grade Copper-Gold Extends Red Hill To 550m Strike

High-Grade Copper-Gold Extends Red Hill To 550m Strike

Azzuro Resources (AZ9:AU) has announced High-Grade Copper-Gold Extends Red Hill To 550m StrikeDownload the PDF here. Keep Reading...
High-Grade Copper Mineralisation Continues at Red Hill

High-Grade Copper Mineralisation Continues at Red Hill

Azzuro Resources (AZ9:AU) has announced High-Grade Copper Mineralisation Continues at Red HillDownload the PDF here. Keep Reading...
Azzuro Resources

High-Grade Assays and Large Extension Confirmed at Red Hill Cu-Au Project

Azzuro Resources PLC (Azzuro or the Company, ASX: AZ9) is pleased to report assay results from drillhole MU2601 and provide an update on the ongoing 2026 drilling program at the Company’s 100%-owned Red Hill (Maikhan Uul) Copper-Gold VMS Project in Mongolia.HIGHLIGHTSAssay results from drillhole... Keep Reading...
Drill in dirt at mine site with "5 Top Canadian Mining Stocks This Week" text overlay.

Top 5 Canadian Mining Stocks This Week: VR Resources Soars with 384 Percent Gain

Welcome to the Investing News Network's weekly look at the best-performing Canadian mining stocks on the TSX, TSXV and CSE, starting with a round-up of Canadian news impacting the resource sector.Statistics Canada released Q2 gross domestic product (GDP) numbers on Friday (August 28). The data... Keep Reading...
Hand holds rough brown rock over blurred earth-toned background.

Sumitomo and G Mining Group Back Tintina's Dos Amigos Copper-Gold Project

Sumitomo (OTCPL:SSUMF,TSE:8053) and engineering firm G Mining Group have acquired a 25 percent stake in Tintina Mines (TSXV:TTS,OTCPL:TNNTF) to advance the Dos Amigos copper-gold project in Northern Chile.Through a 50/50 special purpose vehicle, Sumitomo and G Mining have subscribed for C$48... Keep Reading...
Flags of Argentina and Chile overlapping, displaying colors and symbols on textured fabric.

Chile and Argentina Revive Treaty for Multibillion-Dollar Copper Hub

Argentina and Chile approved operating protocols to integrate three mega-mining projects across the Andes Mountains, advancing a legal framework designed to unlock more than US$20.7 billion in copper investment. Officials from both countries convened in Santiago on Thursday (August 27) under the... Keep Reading...
US$100 bills, text saying "tariffs."

US Tariff Fears Drive Copper Stockpile Rush

Traders are flooding American warehouses with refined copper to beat potential import tariffs, draining global inventories and pushing prices near all-time highs despite sufficient physical supply worldwide.On the New York Commodity Exchange, copper for September delivery surged to a record... Keep Reading...
A sack of US money.

EXIM Backs Ivanhoe Copper Mine with US$1.1 Billion Financing

Ivanhoe Electric (TSX:IE,NYSEAMERICAN:IE) has secured a US$1.1 billion preliminary debt financing package from the US Export-Import Bank (EXIM) to develop the Santa Cruz copper project in Arizona.The preliminary project letter, announced on Monday (August 24) increases the federal agency's... Keep Reading...
Azzuro Resources

Azzuro Resources Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Interactive Chart

Latest Press Releases

Related News