Lumina Gold Announces US$300 Million Metals Streaming Agreement with Wheaton Precious Metals

Lumina Gold Announces US$300 Million Metals Streaming Agreement with Wheaton Precious Metals

Lumina Gold Corp. (TSXV: LUM) (OTCQX: LMGDF) (the "Company" or "Lumina") is pleased to announce that it entered into a precious metals purchase agreement (the "Gold Stream") with Wheaton Precious Metals International Ltd., a wholly owned subsidiary of Wheaton Precious Metals Corp. ("Wheaton") in relation to its 100% owned Cangrejos gold-copper project located in El Oro Province, Ecuador (the "Project" or "Cangrejos") on May 16, 2023 . The Gold Stream initially represents 6.6% of the payable gold produced from the Project in exchange for US$48 million of pre-construction funding (the "Early Deposit") and US$252 million of construction funding (the "Upfront Payment").

Lumina Gold Corp Logo (CNW Group/Lumina Gold Corp.)

Randy Smallwood , President and CEO of Wheaton commented: "The Cangrejos Project is an excellent addition to Wheaton's existing portfolio of high-quality, low-cost assets as it should provide impactful, long-term growth as well as significant exploration potential. We welcome the opportunity to work with the team at Lumina who have done an outstanding job at working to de-risk the Project and advancing it towards construction."

Ross Beaty , Lumina's founder and largest shareholder commented: "This transaction validates the extensive technical work that the Lumina Group has completed on Cangrejos since 2014. It will de-risk the execution of the Cangrejos project and form a significant part of the US$1 billion of required construction capital. Cangrejos will represent one of the largest gold producers in the world once built and Wheaton will benefit from its three decades of mine life. We look forward to working with Wheaton's extremely experienced team as the Project gets advanced."

Transaction Overview

The Gold Stream is composed of two funding segments, (i) the Early Deposit to be paid during the completion of a feasibility study (as such term is defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects ) and permitting period, and (ii) the Upfront Payment to be paid during the construction of the Project. The US$48 million Early Deposit provides Lumina with the capital it requires to complete definition drilling, a feasibility study and permitting work at the Project. The Upfront Payment of US$252 million provides approximately 25% of the total construction funding required by the Project.

The Early Deposit of US$48 million is comprised of four components:

  1. US$12 million at closing;
  2. US$10 million 6 months after close;
  3. US$15 million 12 months after close; and
  4. an US$11 million tranche that can be drawn upon for specific pre-construction capital items.

The US$252 million Upfront Payment will be funded throughout the two-and a-half-year construction period for the Project.

In return for the Early Deposit and Upfront Payment, Lumina will sell 6.6% of the payable gold production from the Project until 700,000 ounces of gold have been delivered, at which point the Gold Stream will be reduced to 4.4% of the payable gold production. Wheaton will pay a production payment representing 18.0% of the spot price of gold for the first 700,000 ounces and 22.0% of the spot price of gold thereafter.

In the event of a change of control, the Company may buy back one-third of the Gold Stream from Wheaton until the earlier of January 1, 2030 and the date that is 12 months after first production.

Lumina Gold Corp. (TSXV: LUM) is a Vancouver, Canada based precious and base metals exploration and development company focused on the Cangrejos Gold-Copper Project located in El Oro Province, southwest Ecuador . In 2023, the Company completed a Preliminary Feasibility Study (the "PFS") for Cangrejos, which is the largest primary gold deposit in Ecuador . Lumina has an experienced management team with a successful track record of advancing and monetizing exploration projects.

Follow us on: Twitter , Linkedin or Facebook .

Further details are available on the Company's website at https://luminagold.com/ . To receive future news releases please sign up at https://luminagold.com/contact .

Lumina Gold Corp.

Signed: "Marshall Koval"

Marshall Koval , President & CEO, Director

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Note Regarding Forward-Looking Information

Certain statements and information herein, including all statements that are not historical facts, contain forward-looking statements and forward-looking information within the meaning of applicable securities laws. Such forward-looking statements or information include but are not limited to statements or information with respect to: the Company's ability to meet the payable gold payments as required under the Gold Stream; the transfer price of gold that Wheaton will pay the Company; the total cost of construction of the Project;   complete definition drilling, a feasibility study or permitting work at the Project   ; the Company's ability to secure the funds required to complete construction of the Project; the Project's expected life of mine; the development of the Project into one of the largest gold producers in the world; the Company's ability to develop the Project into a producing mine; and the   buy back by the Company of one third of the Gold Stream from Wheaton following a change of control of the Company.   Often, but not always, forward-looking statements or information can be identified by the use of words such as "will" or "projected" or variations of those words or statements that certain actions, events or results "will", "could", "are proposed to", "are planned to", "are expected to" or "are anticipated to" be taken, occur or be achieved.

With respect to forward-looking statements and information contained herein, the Company has made numerous assumptions including among other things, assumptions about general business and economic conditions; the prices of gold, copper and silver; the Company's ability to meet its obligations under the Gold Stream and other material agreements; the accuracy and reliability of technical data, forecasts, estimates and studies, including the PFS; the accuracy of slope guidance underlying the engineered pit design; estimates of mineral resources and mineral reserves; anticipated costs and expenditures; future results of operations; ability to satisfy power infrastructure and water capacity requirements; availability and ability to procure personnel, machinery, supplies, and equipment from local sources where possible; the characteristics of the Project producing innate positive environmental impacts; tax rates and royalty rates applicable to the Project; the relationship between the Company and the local communities and its business partners; ability to operate in a safe and effective manner; and the success of exploration, development and processing activities. The foregoing list of assumptions is not exhaustive.

Although management of the Company believes that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that a forward-looking statement or information herein will prove to be accurate. Forward-looking statements and information by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors which may cause the Company's actual results, performance or achievements, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. These factors include, but are not limited to: risks relating to exploration activities and accurately predicting mineralization; the timing and ability of the Company to obtain necessary permits; risks relating to inaccurate geological and engineering assumptions (including with respect to the tonnage, grade and recoverability of reserves and resources); risks relating to unanticipated operational difficulties (including failure of equipment or processes to operate in accordance with specifications or expectations, cost escalation, unavailability of materials and equipment, government action or delays in the receipt of government approvals, industrial disturbances or other job action, and unanticipated events related to health, safety and environmental matters); capital costs varying significantly from estimates; business and economic conditions in the mining industry generally; risks associated with the business of the Company; the supply and demand for labour and other project inputs; changes in commodity prices; changes in interest and currency exchange rates; inflation and credit risks; risks relating to adverse weather conditions; political risk and social unrest; changes in general economic conditions or conditions in the financial markets; and other risk factors as detailed from time to time in the Company's continuous disclosure documents filed with Canadian securities administrators. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/lumina-gold-announces-us300-million-metals-streaming-agreement-with-wheaton-precious-metals-301826603.html

SOURCE Lumina Gold Corp.

Cision View original content to download multimedia: https://www.newswire.ca/en/releases/archive/May2023/16/c1736.html

News Provided by Canada Newswire via QuoteMedia

LUM:CC
The Conversation (0)
Lumina Gold Announces US$10.2 million Wheaton Precious Metals Draw and Amendment to the PMPA

Lumina Gold Announces US$10.2 million Wheaton Precious Metals Draw and Amendment to the PMPA

Lumina Gold Corp. (TSXV: LUM) (OTCQB: LMGDF) (the "Company" or "Lumina") is pleased to announce that under the previously announced US$300 million precious metals purchase agreement (the "PMPA") with Wheaton Precious Metals International Ltd., a wholly owned subsidiary of Wheaton Precious Metals Corp. ("Wheaton"), the Company has drawn an additional installment of US$10.2 million . The draw consisted of two tranches, US$9 million which was due twelve months after the initial draw in May 2023 and US$1.2 million related to specific pre-construction acquisition transactions.

Lumina Gold Corp. Logo (CNW Group/Lumina Gold Corp.)

The PMPA has been amended to modify the US$15 million that was due in May 2024 to US$9 million payable immediately and the remaining US$6 million payable on December 2, 2024 . This amendment was made because Lumina has not yet finalized terms for the exploitation contract with the Government of Ecuador , which was a condition for the US$15 million being received. The December 2, 2024 payment is conditional on the finalization of the exploitation contract term sheet between Lumina and the Government of Ecuador .

Lumina Gold Corp. (TSXV: LUM) is a Vancouver, Canada based precious and base metals exploration and development company focused on the Cangrejos Gold-Copper Project located in El Oro Province, southwest Ecuador . In 2023, the Company completed a Pre-Feasibility Study for Cangrejos, which is the largest primary gold deposit in Ecuador . Lumina has an experienced management team with a successful track record of advancing and monetizing exploration projects.

Follow us on: Twitter , Linkedin or Facebook .

Further details are available on the Company's website at https://luminagold.com/ . To receive future news releases please sign up at https://luminagold.com/contact .

Lumina Gold Corp.

Signed: "Marshall Koval"

Marshall Koval , President & CEO, Director

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Note Regarding Forward-Looking Information

Certain statements and information herein, including all statements that are not historical facts, contain forward-looking statements and forward-looking information within the meaning of applicable securities laws. Such forward-looking statements or information include but are not limited to statements or information with respect to: the Company's ability to finalize the exploitation contract terms with the Government of Ecuador before December 2, 2024 . Often, but not always, forward-looking statements or information can be identified by the use of words such as "will" or "projected" or variations of those words or statements that certain actions, events or results "will", "could", "are proposed to", "are planned to", "are expected to" or "are anticipated to" be taken, occur or be achieved.

With respect to forward-looking statements and information contained herein, the Company has made numerous assumptions including among other things, assumptions about: the Company's ability to meet its obligations under the PMPA; general business and economic conditions; the prices of gold and copper; and anticipated costs and expenditures. The foregoing list of assumptions is not exhaustive.

Although management of the Company believes that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that a forward-looking statement or information herein will prove to be accurate. Forward-looking statements and information by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors which may cause the Company's actual results, performance or achievements, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. These factors include, but are not limited to: risks associated with the business of the Company; business and economic conditions in the mining industry generally; the supply and demand for labour and other project inputs; changes in commodity prices; changes in interest and currency exchange rates; risks relating to inaccurate geological and engineering assumptions (including with respect to the tonnage, grade and recoverability of reserves and resources); risks relating to unanticipated operational difficulties (including failure of equipment or processes to operate in accordance with specifications or expectations, cost escalation, unavailability of materials and equipment, government action or delays in the receipt of government approvals, industrial disturbances or other job action, and unanticipated events related to health, safety and environmental matters); risks relating to adverse weather conditions; political risk and social unrest; changes in general economic conditions or conditions in the financial markets; and other risk factors as detailed from time to time in the Company's continuous disclosure documents filed with Canadian securities administrators. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/lumina-gold-announces-us10-2-million-wheaton-precious-metals-draw-and-amendment-to-the-pmpa-302160826.html

SOURCE Lumina Gold Corp.

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/May2024/31/c5772.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Lumina Gold Corp. Presents in Red Cloud's Virtual Webinar Series

Lumina Gold Corp. Presents in Red Cloud's Virtual Webinar Series

Lumina Gold Corp. (TSXV: LUM) is pleased to announce that the company is presenting a live virtual corporate update hosted by Red Cloud Financial Services on May 22nd, 2024 at 2:00pm ET.

We invite our shareholders, and all interested parties to register for the webinar and participate in the live Q&A session at the end of the presentation moderated by Red Cloud.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Lumina Gold

Lumina Gold Appoints Feasibility Study Consultants

Lumina Gold Corp. (TSXV: LUM) (OTCQB: LMGDF) ("Lumina" or the "Company") is pleased to announce that it has appointed Ausenco Engineering Canada ULC ("Ausenco") to lead the Feasibility Study on its Cangrejos Gold-Copper Project ("Cangrejos" or the "Project") in southwest Ecuador . Lumina is expecting the Feasibility Study to be completed in H1 2025. Along with Ausenco, Lumina has appointed a full team of consultants to support the completion of the Feasibility Study. Key consultants and responsibilities are listed below in Table 1.

Table 1: Appointed Consultants

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Lumina Gold Engages a Market Maker

Lumina Gold Engages a Market Maker

Lumina Gold Corp. (TSXV: LUM) (OTCQB: LMGDF) (the "Company" or "Lumina") announces that it has engaged Integral Wealth Securities Limited ("Integral") to provide services as a market maker in compliance with the policies and guidelines of the TSX Venture Exchange and other applicable legislation. Under the agreement, Integral will receive a fee of C$6,000 plus applicable taxes per month. The initial term of the agreement is three (3) months from the date of execution with an option to renew.

Lumina Gold Corp. (TSXV: LUM) is a Vancouver, Canada based precious and base metals exploration and development company focused on the Cangrejos Gold-Copper Project located in El Oro Province, southwest Ecuador . In 2023, the Company completed a Pre-Feasibility Study for Cangrejos, which is the largest primary gold deposit in Ecuador . Lumina has an experienced management team with a successful track record of advancing and monetizing exploration projects.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Lumina Gold

Lumina Gold Announces Results from 19,000 metre Drill Program at Cangrejos; Including 85 metres Grading 2.42 g/t Gold Equivalent from Surface and Open to Depth

Highlights from 7,800 metre diamond hole (35-151 metres) Resource Conversion Drill Program:

  • Hole C23-265: 2.47 g/t gold equivalent over 85 metres from surface to end of hole.
  • Hole C23-302: 1.75 g/t gold equivalent over 113 metres from 2 metres to end of hole.
  • Hole C23-317: 1.86 g/t gold equivalent over 96 metres from surface to end of hole.
  • Highest gold assay ever on the project in hole C23-253, 2 metres from 40 to 42 metres grading 580 g/t Au.

Lumina Gold Corp. (TSXV: LUM) (OTCQX: LMGDF) (the "Company" or "Lumina") is pleased to announce results from the 2023 Phase 1 mining resource conversion drilling campaign in support of the ongoing Feasibility Study ("FS") at its Cangrejos Project (the "Project") in Ecuador . Resource drilling comprised part of a larger drill campaign at the Cangrejos and Gran Bestia deposits which also included, metallurgical samples and geotechnical holes with subsequent hydrogeological testing in support of pit slope design. The 2023 drill program at the Project is summarized below in Table 1.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
RETRANSMISSION: Group Eleven to be Featured on Radius Research for a Live Company Pitch, Deep Dive and Q&A Webinar

RETRANSMISSION: Group Eleven to be Featured on Radius Research for a Live Company Pitch, Deep Dive and Q&A Webinar

Group Eleven Resources Corp. (TSXV: ZNG) (OTC Pink: GRLVF) (FSE: 3GE) ("Group Eleven" or the "Company") is pleased to invite investors and other interested parties to attend the Company's upcoming interview with Radius Research.

CEO Bart Jaworski is providing an update on ZNG's Ballywire high-grade zinc-lead-silver (+/- germanium, +/- copper) discovery in the Republic of Ireland.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Bold Ventures to Present at Metals Investor Forum in Vancouver on May 9, 2025

Bold Ventures to Present at Metals Investor Forum in Vancouver on May 9, 2025

Bold Ventures Inc. (TSXV: BOL) (the "Company" or "Bold") is pleased to announce that the Company will be presenting at Metals Investor Forum (MIF) on May 9 at The Rosewood Hotel, 801 W Georgia St, Vancouver, BC. The Company's President and COO, Bruce MacLachlan, and the Company's V.P. Exploration, Coleman Robertson, will be present during the conference.

John Kaiser, author of Kaiser Research Online, will be introducing Coleman Robertson at 4:50 p.m. Local Time, who will provide an overview and update on the Company's assets and plans for the upcoming field season. Please see the link to the May 9 Metals Investor Forum web page.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
OUTCROP SILVER ANNOUNCES PARTNER FUNDED MAIDEN DRILL PROGRAM AT THE PEARL COPPER PROJECT, ARIZONA

OUTCROP SILVER ANNOUNCES PARTNER FUNDED MAIDEN DRILL PROGRAM AT THE PEARL COPPER PROJECT, ARIZONA

Outcrop Silver & Gold Corporation (TSXV:OCG, OTCQX:OCGSF, DE:MRG) ("Outcrop Silver") is pleased to announce the commencement of the maiden drill program at the Pearl Copper Project located in Arizona United States . The drilling campaign will be fully funded by Golden Mile Resources Limited (ASX: G88), whereby Golden Mile is currently earning a 51% interest through funding this A$2 million maiden drill program. Outcrop Silver retained a 1% net smelter return (NSR) royalty.

Outcrop Silver logo (CNW Group/Outcrop Silver & Gold Corporation)

Highlights

  • Outcrop Silver advances the Pearl Copper project through an earn-in agreement with Golden Mile Resources (ASX:G88). Program fully funded by Golden Mile .
  • The Pearl project is located in the prolific Laramide porphyry copper district, which is responsible for 70% of the United States of America's copper production.
  • All drilling permits secured from the Bureau of Land Management (BLM) and the Arizona State Land Department (ASLD).
  • The maiden drill program to test high-grade copper-silver-gold targets at the Odyssey and Ford prospects has commenced.

" Golden Mile's fully funded drill program moves Pearl forward at no cost to Outcrop Silver and exemplifies our strategy of unlocking value from non-core assets while we focus capital on expanding the high-grade Santa Ana silver project in Colombia ," stated Ian Harris , President & CEO of Outcrop Silver.

The Pearl Copper project is located in the Laramide porphyry copper district, one of the most prolific copper-producing regions globally, accounting for approximately 70% of U.S. copper production. The project sits immediately north of BHP's past-producing San Manuel-Kalamazoo Mine and along the trend with Capstone Copper's active Pinto Valley Mine, benefiting from exceptional infrastructure and a skilled local workforce.

Following the receipt of all required exploration permits, including the Notice of Intent (NOI) from the BLM and the Special Land Use Permit (SLUP) and Geologic Field Operation Plan (GFOP) from the ASLD, drilling has commenced. This maiden drill program consists of 14 to 16 reverse circulation (RC) holes totaling up to 1,800 metres, and will test two priority targets.

Transaction

On September 12, 2024 Golden Mile purchased an option on Pearl for A$100,000 (Australian Dollars) with Outcrop Silver retaining a 1% NSR royalty. Golden Mile has the option to earn-in to 51% by funding A$2,000,000 in exploration expenditures by September 12, 2027 . Golden Mile may also earn an additional 34% by funding an additional A$10,000,000 in exploration expenditures within 5 years. Upon completing the earn-in a joint venture will be formed with both parties funding proportionally. If either party dilutes below 10%, their interest will convert to an additional 1% NSR royalty. At such time that a JORC compliant resource achieves 750,000 tonnes of contained copper at a minimum grade of 0.3%, Golden Mile will pay Outcrop Silver A$2,000,000 .

The Pearl Copper project was acquired through the amalgamation with Zacapa Resources. Zacapa's portfolio also included the Kramer Hills brownfield oxide gold project in San Bernardino, California and the South Bullfrog, gold project in Beatty, Nevada adjacent to Anglo Gold's Silicon project.

Qualified Person

Edwin Naranjo Sierra is the designated Qualified Person within the meaning of the National Instrument 43-101 and has reviewed and verified the technical information in this news release. Mr. Naranjo holds a MSc. in Earth Sciences, and is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM). Mr. Naranjo Sierra is a consultant to the company and is therefore independent for the purposes of NI 43-101.

About Outcrop Silver

Outcrop Silver is a leading explorer and developer focused on advancing its flagship Santa Ana high-grade silver project in Colombia . Leveraging a disciplined and seasoned team of professionals with decades of experience in the region. Outcrop Silver is dedicated to expanding current mineral resources through strategic exploration initiatives.

At the core of our operations is a commitment to responsible mining practices and community engagement, underscoring our approach to sustainable development. Our expertise in navigating complex geological and market conditions enables us to consistently identify and capitalize on opportunities to enhance shareholder value. With a deep understanding of the Colombian mining landscape and a track record of successful exploration, Outcrop Silver is poised to transform the Santa Ana project into a significant silver producer, contributing positively to the local economy and setting new standards in the mining industry.

About Golden Mile

Golden Mile is a project development and mineral exploration company. The primary focus is on growing the Company with a multi-asset and multi-commodity strategy through advancing core projects, acquiring high-quality assets, and tactical alliances with joint venture partners.

ON BEHALF OF THE BOARD OF DIRECTORS

Neither the TSX Venture Exchange nor its Regulation Services Provider (as such term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Certain information contained herein constitutes "forward-looking information" under Canadian securities legislation. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "potential," "we believe," or variations of such words and phrases or statements that certain actions, events or results "will" occur. Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made and they are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Outcrop Silver to be materially different from those expressed or implied by such forward-looking statements or forward-looking information, including: the receipt of all necessary regulatory approvals, capital expenditures and other costs, financing and additional capital requirements, completion of due diligence, general economic, market and business conditions, new legislation, uncertainties resulting from potential delays or changes in plans, political uncertainties, and the state of the securities markets generally. Although management of Outcrop Silver have attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward-looking information. Outcrop Silver will not update any forward-looking statements or forward-looking information that are incorporated by reference.

SOURCE Outcrop Silver & Gold Corporation

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/May2025/08/c1166.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×