Ivanhoe Electric Makes Final Land Acquisition Payment at the Santa Cruz Copper Project in Arizona

Final Payment Clears Way for Initial Mine Construction Activities Subject to Receipt of Permits

Ivanhoe Electric Inc. (NYSE American: IE) (TSX: IE) ("Ivanhoe Electric") Executive Chairman Robert Friedland and President and Chief Executive Officer Taylor Melvin are pleased to announce that Ivanhoe Electric has accelerated and completed the final three land acquisition payments, totaling $39.3 million, at the Santa Cruz Copper Project in Arizona, satisfying all remaining terms of the Purchase and Sale Agreement with Wolff-Harvard Ventures LLC (refer to Ivanhoe Electric's May 11, 2023 news release). The promissory note previously issued, and now repaid, required the full outstanding balance to be paid by Ivanhoe Electric prior to commencement of major mine construction activities.

Mr. Melvin commented: "Accelerating our final land payments is a key step in the development of our Santa Cruz Copper Project. With a strong balance sheet and experienced project team, we are well-positioned to commence initial construction at Santa Cruz in early 2026 subject to receipt of necessary permits. We remain on track to achieve our goal of delivering first copper cathode production by late 2028."

About Ivanhoe Electric

We are a United States domiciled minerals exploration company with a focus on developing mines from mineral deposits principally located in the United States. We seek to support American supply chain independence by finding and delivering copper and other critical metals vital to advanced manufacturing, infrastructure development, technology, and national security. We use our powerful Typhoon™ geophysical surveying system, together with advanced data analytics provided by our 94.3% owned subsidiary, Computational Geosciences Inc. ("CGI"), to accelerate and de-risk the mineral exploration process as we seek to discover new deposits of critical metals that may otherwise be undetectable by traditional exploration technologies. We believe the United States is significantly underexplored and has the potential to yield major new discoveries of critical metals. Our mineral exploration efforts focus on copper as well as other metals including nickel, cobalt, platinum group elements, gold and silver. Through the advancement of our portfolio of critical metals exploration projects, headlined by the Santa Cruz Copper Project in Arizona, we intend to contribute to domestic supply by developing resources that support industrial and strategic sectors. We also operate a 50/50 joint venture with Saudi Arabian Mining Company ("Maaden") to explore for minerals on ~48,500 km2 of underexplored Arabian Shield in Saudi Arabia. Finally, in 2024, we established an exploration alliance with BHP Mineral Resources Inc. ("BHP"), a subsidiary of BHP Group Limited, to search for critical minerals in the United States.

Website: www.ivanhoeelectric.com

Contact Information

Mike Patterson
Vice President, Investor Relations and Business Development
Email: mike@ivnelectric.com
Phone: 1-480-601-7878

Follow us on X
Ivanhoe Electric's Executive Chairman Robert Friedland: @robert_ivanhoe
Ivanhoe Electric: @ivanhoeelectric

Ivanhoe Electric's investor relations website located at www.ivanhoeelectric.com should be considered Ivanhoe Electric's recognized distribution channel for purposes of the Securities and Exchange Commission's Regulation FD.

Forward-Looking Statements

Certain statements in this news release constitute "forward-looking statements" or "forward-looking information" within the meaning of applicable U.S. and Canadian securities laws. Such statements and information involve known and unknown risks, uncertainties and other factors that may cause the actual results, performance or achievements of Ivanhoe Electric, its projects, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. Such statements can be identified by the use of words such as "may", "would", "could", "will", "intend", "expect", "believe", "plan", "anticipate", "estimate", "scheduled", "forecast", "predict", "target", "project" and other similar terminology, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. These statements reflect Ivanhoe Electric's current expectations regarding future events, performance and results and speak only as of the date of this news release.

Such statements in this news release include, without limitation, statements regarding: commencement of initial construction at the Santa Cruz Copper Project in early 2026, receipt of permits to commence construction at Santa Cruz Copper Project, and the ability to produce copper cathode by late 2028.

Forward-looking statements are based on management's beliefs and assumptions and on information currently available to management. Such statements are subject to significant risks and uncertainties, and actual results may differ materially from those expressed or implied in the forward-looking statements due to various factors, including changes in the prices of copper or other metals Ivanhoe Electric is exploring for; the results of exploration and drilling activities and/or the failure of exploration programs or studies to deliver anticipated results or results that would justify and support continued exploration, studies, development or operations; the final assessment of exploration results and information that is preliminary; the significant risk and hazards associated with any future mining operations, extensive regulation by the U.S. government as well as local governments; changes in laws, rules or regulations, or their enforcement by applicable authorities; the failure of parties to contracts with Ivanhoe Electric to perform as agreed; and the impact of political, economic and other uncertainties associated with operating in foreign countries, and the impact of the COVID-19 pandemic and the global economy. These factors should not be construed as exhaustive and should be read in conjunction with the other cautionary statements and risk factors described in Ivanhoe Electric's Annual Report on Form 10-K filed and other disclosures with the U.S. Securities and Exchange Commission.

No assurance can be given that such future results will be achieved. Forward-looking statements speak only as of the date of this news release. Ivanhoe Electric cautions you not to place undue reliance on these forward-looking statements. Subject to applicable securities laws, Ivanhoe Electric does not assume any obligation to update or revise the forward-looking statements contained herein to reflect events or circumstances occurring after the date of this news release, and Ivanhoe Electric expressly disclaims any requirement to do so.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/275207

News Provided by Newsfile via QuoteMedia

IE
The Conversation (0)
Red Mountain Mining Limited  Armidale Antimony Target Expanded Ahead of July Drilling

Red Mountain Mining Limited Armidale Antimony Target Expanded Ahead of July Drilling

Perth, Australia (ABN Newswire) - Red Mountain Mining Limited (ASX:RMX,OTC:RMXFF) (OTCMKTS:RMXFF), a Critical Minerals exploration and development company with an established portfolio in Tier-1 Mining Districts in the United States and Australia, has completed 2D and 3D modelling of... Keep Reading...
Generation Uranium Starts Summer 2026 Field Program at the Yath Project, Kivalliq Region, Nunavut. Project,

Generation Uranium Starts Summer 2026 Field Program at the Yath Project, Kivalliq Region, Nunavut. Project,

(TheNewswire) Vancouver, British Columbia July 2, 2026 Generation Uranium Inc. (TSX.V: GEN, OTCQB: GENRF, FRA: W85) ("Generation" or the "Company") is pleased to announce the start of it's inaugural field program for the Yath Project, Kivalliq Region, Nunavut. The Company has assembled a team... Keep Reading...
Amex Delivers a Positive Feasibility Study for Development of the Perron Gold Mine

Amex Delivers a Positive Feasibility Study for Development of the Perron Gold Mine

Feasibility Phase 1 Highlights Gold production to average 147,000 oz per year over the 5 years of commercial Phase 1 production at an All in Sustaining Cost ("AISC") of USD$910/oz AuProjected Post-Tax IRR of 114.6% and Post-Tax NPV5 of CAD$1.13 billion generated from a Cumulative Undiscounted... Keep Reading...
Prismo Metals Completes Phase 1 Drill Campaign at Silver King

Prismo Metals Completes Phase 1 Drill Campaign at Silver King

Vancouver, British Columbia, April 7th, 2026 TheNewswire - Prismo Metals Inc. (the "Company or "Prismo") (CSE: PRIZ,OTC:PMOMF) (OTCQB: PMOMF) is pleased to provide a comprehensive update on the successful completion of its Phase I diamond drilling program at the Silver King project, located in... Keep Reading...
Prismo Metals Completes Phase 1 Drill Campaign at Silver King

Prismo Metals Completes Phase 1 Drill Campaign at Silver King

(TheNewswire) Vancouver, British Columbia, April 7th, 2026 TheNewswire - Prismo Metals Inc. (the "Company or "Prismo") (CSE: PRIZ,OTC:PMOMF) (OTCQB: PMOMF) is pleased to provide a comprehensive update on the successful completion of its Phase I diamond drilling program at the Silver King... Keep Reading...
The Argentine flag with a sun emblem waves on a white pole against a clear blue sky.

First Quantum Explores Stake Sale in Argentine Copper Mine

First Quantum Minerals (TSX:FM,OTCPL:FQVLF) has opened talks to sell a minority stake in its colossal Taca Taca copper project in Argentina.The miner is reportedly running a formal sales process for the Salta province asset. Potential bidders include Rio Tinto (ASX:RIO,NYSE:RIO,LSE:RIO),... Keep Reading...
Nine Mile Metals Announces Completion of DDH WD-26-03, and Confirms Continued Mineralization at the Wedge Deposit

Nine Mile Metals Announces Completion of DDH WD-26-03, and Confirms Continued Mineralization at the Wedge Deposit

Nine Mile Metals LTD. (CSE: NINE,OTC:VMSXF) (OTCID: VMSXF) (FSE: KQ9) (the "Company" or "Nine Mile"), is pleased to announce that DDH WD-26-03 has been completed, logged, measured and zones of mineralization have been identified.DDH WD-26-03 was successful, intersecting pyrite and chalcopyrite... Keep Reading...
Democratic Republic of Congo on a map with a small flag.

DRC Closes Glencore Offices Over Tax Row

Congolese tax authorities sealed the local offices of Glencore's (LSE:GLEN,OTCPL:GLCNF) Kamoto Copper subsidiary last Thursday (July 9) over a multibillion-dollar payment dispute, Bloomberg reported.The government tax agency, known as the DGI, shut the Kolwezi offices after settlement talks... Keep Reading...
The building facade displays large orange letters "BHP" against a clear blue sky.

BHP Secures Key Chile Permit, Awards Australian Contract in Dual Copper Push

Top copper miner BHP (ASX:BHP,NYSE:BHP,LSE:BHP) continues to accelerate its global copper expansion, simultaneously securing environmental clearance to upgrade its Escondida mine in Chile and awarding an engineering contract worth over AU$200 million to scale its South Australian processing... Keep Reading...
Copper coil stack with numbers written on it, in front of a blurred industrial background.

Copper Price Trends: Q2 2026 Review and Forecast

Copper prices stayed elevated in Q2 as new factors further impacted already strained supply/demand.Copper supply has been affected by disruptions at major mine sites, smelter and refiner concentrate shortages and the US-led war against Iran, which has led to the closure of major shipping lanes... Keep Reading...

Interactive Chart

Latest Press Releases

Related News