Galan Lithium

High-Flow, High-Grade Long-Term Pumping Test Results Continue

Delivering higher production capacity parameters at Pata Pila

Galan Lithium Limited (ASX:GLN)LN) (Galan or the Company) is pleased to provide an update on the well pumping test and exploration programs for its 100%-owned Hombre Muerto West Lithium Project (HMW Project), located on the Western Basin of the Hombre Muerto salar in Catamarca Province, Argentina. The pumping tests are an integral part of the current DFS for the HMW Project.

Highlights:

  • Long term pumping test at Pata Pila (PPB-01-21) successfully completed; pumping rates between 17 and 20 L/s, with extracted Li grade between 821 and 927 mg/L.
  • These strong outcomes support potential higher production capacity parameters for Definitive Feasibility Study (DFS) inputs.
  • First pumping well at Rana de Sal (PBRS-01-21) under hydraulic testing; 72-hour constant rate test executed at steady 20 L/s and average Li grade over 945 mg/L.
  • Pumping test program ongoing with 30-day pumping test at PBRS-01-21 to commence shortly, plus hydraulic testing of second Pata Pila well (PPB-02-22).
  • Two (2) diamond drilling exploration wells at Rana de Sal returned thick sedimentary intersections with high Li grades (942 – 1,035 mg/L).
  • Casa del Inca exploration drillhole completed at 155 metres with intervals of high porosity potential sediments underlying surface lava flows.
Galan Exploration Manager, Alvaro Henriquez, commented:

“Theseresultsaregreatnewsfrombothan underlying geological, and resource confidence, point of view. We have demonstrated a high production capacity with the completion of the first long-term pumping test at Pata Pila, as well as extending the reservoir quality throughout the main alluvial deposits on our tenements with the latest exploration well intercepts. These outcomes provide further validation of the world-class nature of the HMW Project and its planned development.”

Well pump testing program delivering excellent results

Pata Pila

The 30-day long term pumping test at the first Pata Pila well (PPB-01-21) was successfully completed at the end of July. The sustained pumping rates were solid, ranging between 17 and 20 L/s. More than 150 brine samples were collected during this testing phase, with laboratory analysis returning an average Li grade of 874 mg/L (from a range of 821 to 927 mg /L).

The hydraulic testing of the second pumping well at Pata Pila (PPB-02-22) is set to commence shortly. This well is located approximately 800m upgradient in the Pata Pila alluvial fan (see Figure 1).


Click here for the full ASX Release

This article includes content from Galan Lithium Limited, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

GLN:AU
Galan Lithium

Galan Lithium Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Galan Lithium

Galan Lithium


Keep reading...Show less
Lithium Universe

Lithium Universe Limited (ASX: LU7) – Reinstatement to Official Quotation

Description

The suspension of trading in the securities of Lithium Universe Limited (‘LU7’) will be lifted immediately, following the release by LU7 of an announcement regarding the finalisation of a capital raising.

Keep reading...Show less
Lithium Universe

LU7 Raises $3.64 Million to Advance Closing the Lithium Conversion Gap Strategy

Lithium Universe Limited (referred to as "Lithium Universe" or the "Company," ASX: "LU7") is pleased to advise that it has completed a $3,644,333.34 million capital raising to sophisticated investors, at a price of $0.02 for each one fully paid ordinary share (FPS) subscribed.

Keep reading...Show less
Balkan Mining and Minerals

March 2024 Quarterly Activities Report

Balkan Mining and Minerals Ltd (ASX: BMM; "BMM" or "the Company") provides the Company’s quarterly activities report for the nine months ended 31 March 2024 (“Quarter”).

Keep reading...Show less
Galan Lithium

Quarterly Activities and Cash Flow Report

The Board of Galan Lithium Limited (Galan or the Company) is pleased to provide this Quarterly Activities Report for the quarter ended 31 March 2024 and to the date of this report. The main focus for the quarter was the ongoing construction works/activities at the Company’s 100% owned, high- grade/low-impurity Hombre Muerto West (HMW) Project in the Catamarca Province, Argentina. Galan continues its steady progress in advancing its low cost, high grade HMW project to production in a timely manner.

Keep reading...Show less
Portofino Grants Stock Options

Portofino Grants Stock Options

Portofino Resources INC. (TSXV: POR) (OTCQB: PFFOF) (FSE: POTA) ("Portofino" or the "Company") announces that, in accordance with the Company's Share Option Plan it has granted options to purchase an aggregate of 360,000 common shares of the Company to certain consultants of the Company. Each Option is exercisable into one Common Share at an exercise price of $0.05. The Options are subject to certain vesting conditions and expire five years from the grant date.

About Portofino Resources Inc.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Galan Lithium

Galan Lithium Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×