Dakota Gold Intersects 1.49 g/t Gold and 8.13 g/t Silver over 38.1 Meters with Infill Drilling at Richmond Hill

Dakota Gold Corp. (NYSE American: DC) ("Dakota Gold" or the "Company") is pleased to report the additional assay results received from its 2026 Drill Campaign ("2026 Campaign") at the Richmond Hill Oxide Heap Leach Gold Project ("Richmond Hill" or the "Project"). The 2026 Campaign includes 15,481 meters of drilling in 109 holes and consists of a combination of infill, expansion and geotechnical drilling. Gold and silver assay data from more than 350 drill holes completed during the 2025 and ongoing 2026 Drill Campaigns at Richmond Hill will be incorporated into a Pre-Feasibility Study ("PFS") being published in the second half of 2026. This represents an approximately 30% increase in drill holes relative to the drill holes that informed the mineral resource estimate outlined in the July 2025 Initial Assessment with Cash Flow ("IACF"), and it will support an updated resource estimate, geo-metallurgical model, mine plan and mine sequence.

Highlight from this update include:

  • Infill drill hole RH26C-387 intersected 1.49 grams per tonne gold (g/t Au) and 8.13 g/t silver (Ag) over 38.1 meters (57 gram meters Au) and RH26C-398 intersected 1.35 g/t Au and 34.54 g/t Ag over 28.2 meters (38 gram meters Au). The gold and silver mineralization intercepted in RH26C-398 was shallow, beginning at only 7 meters below surface and is higher than the current average grade in the IACF. The PFS is assessing higher-grade, near-surface mineralization for incorporation into early mine operations to minimize stripping and increase production in the initial five years of mining. The IACF for Richmond Hill outlined a low overall strip ratio of 0.66 and a life of mine AISC (Cash Cost plus Sustaining Cost) of $1,047 per oz Au for the measured and indicated mine plan.
  • The assay results reported today are primarily from infill drilling in the northern portion of the Project designed to support reserve conversion planned for 2026. This drilling targets areas of previously defined near-surface mineralization where tighter drill spacing is expected to support conversion of inferred resources to the indicated resource category.
  • Over 85% of the total planned drilling for this year's Richmond Hill Campaign has been completed to date with 13,718 meters in 92 drill holes. Drilling productivity and assay turnaround times remain on track, and the Campaign is expected to be completed in the third quarter of 2026.

Jack Henris, President and COO of Dakota Gold, said, "We are excited to have completed the infill and expansion drilling of the 2026 Drill Campaign on budget and ahead of schedule. Completion of this drilling is an important milestone on the critical path to delivering the PFS in the second half of 2026. Drills at site are now conducting geotechnical drilling, the results of which will support the Feasibility Study targeted for publication in the first half of 2027. Management will now focus on the remaining trade-off studies and completion of the PFS."

Shawn Campbell, CFO of Dakota Gold, added, "We're thrilled to close our $75 million financing in the first quarter 2026 and receive more than $10 million from warrant exercises, which eliminated all outstanding warrants. With $107 million in cash as of March 31, 2026, we're fully funded through the study stage to expected permit issuance for the Richmond Hill Oxide Heap Leach Gold Project, and we have capital to build organizational capacity and secure critical long-lead items to reduce construction risk."

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8218/297730_413f0bf3348d3a89_002.jpg

Figure 1. Plan Map showing location of Dakota Gold Corp. Richmond Hill drill results reported today in Table 1. 

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8218/297730_413f0bf3348d3a89_002full.jpg

Table 1. Richmond Hill Drill Results (Metric / Imperial)1,2,3,4

Hole # From
(m)
To
(m)
Interval
(m)
Grade Au
(g/t)
g x m
Au
Grade Ag
(g/t)
g x m
Ag
From
(ft)
To
(ft)
Interval
(ft)
Grade Au
(oz/ton)
RH26C-381 55.2 58.3 3.1 0.66 2 1.69 5 181.1 191.4 10.3 0.019

102.7 117.3 14.6 0.67 10 27.19 396 337.0 384.8 47.8 0.019
RH26C-387 67.1 97.0 29.9 0.73 22 4.44 133 220.2 318.4 98.2 0.021

112.3 118.2 5.9 0.92 5 1.70 10 368.4 387.7 19.3 0.027

123.0 129.8 6.8 1.22 8 2.56 17 403.6 425.9 22.3 0.036

139.6 145.1 5.5 0.56 3 2.86 16 457.9 476.0 18.1 0.016

184.2 222.3 38.1 1.49 57 8.13 310 604.3 729.4 125.1 0.043
RH26C-389 10.0 14.8 4.8 0.52 2 6.27 30 32.7 48.5 15.8 0.015

34.8 63.7 28.9 0.85 25 3.82 110 114.2 209.1 94.9 0.025
RH26C-393 8.3 13.9 5.7 1.34 8 14.87 84 27.1 45.7 18.6 0.039

23.8 31.2 7.4 0.85 6 6.09 45 78.0 102.4 24.4 0.025
RH26C-394 26.0 33.1 7.1 0.79 6 13.49 95 85.3 108.5 23.2 0.023

63.1 69.0 5.9 0.53 3 8.12 48 207.0 226.5 19.5 0.015
RH26C-398 7.6 35.8 28.2 1.35 38 34.54 973 25.0 117.4 92.4 0.039

40.8 57.2 16.5 0.76 12 13.68 226 133.7 187.8 54.1 0.022

61.9 66.5 4.6 0.74 3 13.98 64 203.2 218.2 15.0 0.022
RH26C-399 No significant intercepts







RH26C-400 10.1 17.1 7.0 0.63 4 15.80 111 33.0 56.0 23.0 0.019

21.9 29.1 7.2 0.90 6 33.36 240 72.0 95.6 23.6 0.026

58.5 63.4 4.9 0.65 3 7.25 35 192.0 208.0 16.0 0.019
RH26C-401 2.1 9.5 7.3 1.85 14 8.26 61 7.0 31.1 24.1 0.054
RH26C-402 9.7 22.7 13.0 0.62 8 19.79 258 31.8 74.6 42.8 0.018

26.1 30.5 4.4 0.84 4 4.83 21 85.5 100.0 14.5 0.025

56.7 60.7 4.0 0.63 2 7.46 30 186.0 199.0 13.0 0.018

65.1 69.2 4.1 0.90 4 6.71 27 213.7 227.0 13.3 0.026

83.2 89.6 6.3 0.82 5 3.90 25 273.1 293.8 20.7 0.024
RH26C-403 9.6 17.0 7.4 0.63 5 3.91 29 31.5 55.8 24.3 0.018

23.8 27.8 4.0 0.68 3 9.05 36 78.0 91.2 13.2 0.020

60.6 64.8 4.2 0.50 2 5.38 23 198.7 212.6 13.9 0.014

86.6 89.7 3.1 0.68 2 4.85 15 284.1 294.2 10.1 0.020

121.0 126.4 5.4 1.28 7 7.69 41 397.0 414.6 17.6 0.037
RH26C-404 0.0 14.6 14.6 1.67 24 25.67 374 0.0 47.8 47.8 0.049

21.9 49.7 27.8 1.58 44 7.99 222 71.7 163.0 91.3 0.046

55.1 63.8 8.7 1.13 10 22.24 193 180.7 209.2 28.5 0.033

72.9 77.4 4.5 0.49 2 7.57 34 239.3 254.0 14.7 0.014
RH26C-405 31.5 37.2 5.7 0.50 3 8.09 46 103.3 122.0 18.7 0.015

60.0 79.9 19.9 1.51 30 7.67 153 196.8 262.1 65.3 0.044
RH26C-406 62.8 65.9 3.1 2.28 7 10.20 31 206.0 216.1 10.1 0.066

151.8 155.7 3.9 0.57 2 16.18 63 498.0 510.7 12.7 0.017
RH26C-407 No significant intercepts







RH26C-408 75.9 82.9 7.0 2.40 17 2.49 17 249.0 272.0 23.0 0.070
RH26C-409 No significant intercepts







RH26C-410 140.5 143.6 3.0 0.79 2 8.31 25 461.0 471.0 10.0 0.023

166.2 175.6 9.3 1.37 13 8.60 80 545.4 576.0 30.6 0.040
RH26C-411 123.7 146.3 22.6 0.92 21 1.17 26 406.0 480.0 74.0 0.027

152.6 158.8 6.2 0.52 3 0.95 6 500.8 521.0 20.2 0.015

164.9 185.8 20.9 1.39 29 1.69 35 541.0 609.5 68.5 0.041

192.1 208.8 16.6 0.95 16 3.91 65 630.4 685.0 54.6 0.028

216.7 225.2 8.5 0.59 5 3.90 33 711.0 739.0 28.0 0.017
RH26C-412 105.2 110.4 5.2 0.92 5 10.17 53 345.1 362.3 17.2 0.027
RH26C-413 97.3 105.0 7.7 0.92 7 4.01 31 319.3 344.4 25.1 0.027
RH26C-414 113.9 117.3 3.4 0.84 3 6.08 20 373.7 384.7 11.0 0.025

161.9 165.2 3.3 1.00 3 4.42 14 531.2 541.9 10.7 0.029
RH26C-415 102.3 125.0 22.6 1.04 24 2.03 46 335.7 410.0 74.3 0.030

130.8 135.4 4.6 0.98 5 1.40 6 429.0 444.2 15.2 0.028

139.8 147.5 7.7 1.74 13 3.76 29 458.6 483.8 25.2 0.051

 

The table may contain rounding errors.

  1. Abbreviations in the table include ounces per ton ("oz/ton"); grams per tonne ("g/t"); feet ("ft"); meter ("m"); gram meters ("g x m").
  2. True thickness unknown.
  3. Intervals calculated based on 0.5 g/t Au cut-off and maximum dilution of 3.05 meters.
  4. The July 7, 2025 Initial Assessment with Cash Flow has an open pit designed with 12.2m (40 ft) benches. The average grade for the Measured and Indicated mine plan is 0.566 g/t Au (0.017 oz/ton). A gram meter of 7 and above has been highlighted in Table 1 based on the bench height and average grade.

About Dakota Gold Corp.

Dakota Gold is expanding the legacy of the 145-year-old Homestake Gold Mining District by advancing the Richmond Hill Oxide Heap Leach Gold Project to commercial production as soon as 2029, and outlining a Tertiary maiden resource as well as a high-grade underground gold resource at the Maitland Gold Project, both located on private land in South Dakota.

Subscribe to Dakota Gold's e-mail list at www.dakotagoldcorp.com to receive the latest news and other Company updates.

Shareholder and Investor Inquiries

For more information, please contact:

Jack Henris
President and COO
Tel: +1 605-717-2540

Shawn Campbell
Chief Financial Officer
Tel: +1 778-655-9638

Carling Gaze
VP of Investor Relations and Corporate Communications
Tel: +1 605-679-7429
Email: info@dakotagoldcorp.com

Qualified Person and S-K 1300 Disclosure

William Gehlen, a Certified Professional Geologist (CPG-10626) with the AIPG, American Institute of Professional Geologists, a Senior Fellow with the SEG, and Senior Manager - Geology of Dakota Gold Corp., is the Company's designated qualified person (as defined in Subpart 1300 of Regulation S-K) for this news release and has reviewed and approved its scientific and technical content.

Quality Assurance/Quality Control consists of regular insertion of certified reference materials, duplicate samples, and blanks into the sample stream. Samples are submitted to the ALS Geochemistry sample preparation facility in Winnipeg, Manitoba. Gold and multi-element analyses are performed at the ALS Geochemistry laboratory in Vancouver, British Columbia. ALS Minerals is an ISO/IEC 17025:2017 accredited lab. Check samples are submitted to Bureau Veritas, Vancouver B.C. as an umpire laboratory. Assay results are reviewed, and discrepancies are investigated prior to incorporation into the Company database.

Forward-Looking Statements

This communication contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. When used in this communication, the words "plan," "target," "anticipate," "believe," "estimate," "intend," "potential," "will" and "expect" and similar expressions are intended to identify such forward-looking statements. Any express or implied statements contained in this communication that are not statements of historical fact may be deemed to be forward-looking statements, including, without limitation: our expectations regarding additional drilling, metallurgy and modeling; our expectations for the improvement and growth of the mineral resources and potential for conversion of mineral resources into reserves; completion of a pre-feasibility study, a feasibility study, and/or permitting; and our overall expectation for the possibility of near-term production at the Richmond Hill project. These forward-looking statements are based on assumptions and expectations that may not be realized and are inherently subject to numerous risks and uncertainties, which could cause actual results to differ materially from these statements. These risks and uncertainties include, among others: the execution and timing of our planned exploration activities; our use and evaluation of historic data; our ability to achieve our strategic goals; the state of the economy and financial markets generally and the effect on our industry; and the market for our common stock. The foregoing list is not exhaustive. For additional information regarding factors that may cause actual results to differ materially from those indicated in our forward-looking statements, we refer you to the risk factors included in Item 1A of the Company's Annual Report on Form 10-K for the fiscal year ended December 31, 2025, as updated by annual, quarterly and current reports that we file with the SEC, which are available at www.sec.gov. We caution investors not to place undue reliance on the forward-looking statements contained in this communication. These statements speak only as of the date of this communication, and we undertake no obligation to update or revise these statements, whether as a result of new information, future events or otherwise, except as may be required by law. We do not give any assurance that we will achieve our expectations.

All references to "$" in this communication are to U.S. dollars unless otherwise stated.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/297730

News Provided by TMX Newsfile via QuoteMedia

DC
The Conversation (0)
Spartan Metals Announces Attendance at Investor Conferences

Spartan Metals Announces Attendance at Investor Conferences

(TheNewswire) Vancouver, Canada, May 12, 2026 - TheNewswire Spartan Metals Corp. ("Spartan" or the "Company") (TSX-V: W OTCQB: SPRMF | FSE: J03) is pleased to announce that it will be attending the following investor conferences over the coming weeks: Critical Minerals Summit May 13 – 14, 2026... Keep Reading...
Analyst Note: Positive PEA Delivered - Rua Gold's Auld Creek Enters PFS Workstream Under New Zealand Fast-Track Approvals

Analyst Note: Positive PEA Delivered - Rua Gold's Auld Creek Enters PFS Workstream Under New Zealand Fast-Track Approvals

After-Tax NPV5% of US$42M and 17% IRR at base case; US$113M and 36% IRR at spot gold. PEA effective April 25, 2026. PFS targeted Q4 2026. CEO signals the project is well-positioned to leverage New Zealand's Fast-Track Approvals permitting process. CanadaNewsGroup.com News Commentary — Rua Gold... Keep Reading...
Analyst Note: Positive PEA Delivered - Rua Gold's Auld Creek Enters PFS Workstream Under New Zealand Fast-Track Approvals

Analyst Note: Positive PEA Delivered - Rua Gold's Auld Creek Enters PFS Workstream Under New Zealand Fast-Track Approvals

After-Tax NPV5% of US$42M and 17% IRR at base case; US$113M and 36% IRR at spot gold. PEA effective April 25, 2026. PFS targeted Q4 2026. CEO signals the project is well-positioned to leverage New Zealand's Fast-Track Approvals permitting process. CanadaNewsGroup.com News Commentary — Rua Gold... Keep Reading...
CENTURY LITHIUM REPORTS UPDATED FEASIBILITY STUDY WITH AFTER-TAX NPV OF $4.01 BILLION AND OPERATING COSTS OF $4,389 PER TONNE OF LITHIUM CARBONATE FOR THE ANGEL ISLAND LITHIUM PROJECT, NEVADA

CENTURY LITHIUM REPORTS UPDATED FEASIBILITY STUDY WITH AFTER-TAX NPV OF $4.01 BILLION AND OPERATING COSTS OF $4,389 PER TONNE OF LITHIUM CARBONATE FOR THE ANGEL ISLAND LITHIUM PROJECT, NEVADA

FEASIBILITY STUDY HIGHLIGHTS After-tax NPV (using 8% discount rate) of $4.01 billion based on price assumptions of $24,000 per tonne ("/t") for lithium carbonate ("Li2CO3") and $750/dry metric tonne ("dmt") for Sodium Hydroxide ("NaOH") After-tax internal rate of return ("IRR") of 27.4%... Keep Reading...
African Discovery Group  announces signing of Definitive Sales and Purchase Agreement  for Butembo Copper Asset in the Democratic Republic of Congo; name change to Copper Intelligence, Inc

African Discovery Group announces signing of Definitive Sales and Purchase Agreement for Butembo Copper Asset in the Democratic Republic of Congo; name change to Copper Intelligence, Inc

AFDG, now Copper Intelligence, has successfully entered a binding contract for the transaction closing of the Butembo mining concession in Eastern DRC. In conjunction with the SPA, AFDG shares have been issued to the license holders, with ownership of the mining interest now held by the US... Keep Reading...
Juggernaut Exploration (TSXV:JUGR)

Juggernaut Mobilizes For Inaugural 10,000 Meter Drill Program to Test New District Scale High Grade Gold Silver Copper Rich Discovery at 100% Controlled Big One Property, Golden Triangle, B.C

Juggernaut Exploration Ltd (JUGR.V) (OTCQB: JUGRF) (FSE: 4JE) (the “Company” or “Juggernaut”) is pleased to report that it has mobilized for its inaugural drill program on the newly discovered district scale gold, silver, copper rich system on the 100% controlled Big One property (the... Keep Reading...
Two Pools drilling results

Two Pools drilling results

Corazon Mining (CZN:AU) has announced Two Pools drilling resultsDownload the PDF here. Keep Reading...
Reinstatement to Quotation

Reinstatement to Quotation

Corazon Mining (CZN:AU) has announced Reinstatement to QuotationDownload the PDF here. Keep Reading...
AX8: AX8 Expands Balagundi and Divests Kanowna East

AX8: AX8 Expands Balagundi and Divests Kanowna East

Maritana Minerals (MRT:AU) has announced AX8: AX8 Expands Balagundi and Divests Kanowna EastDownload the PDF here. Keep Reading...
Kanowna East Project Acquired in Strategic Tenement Swap

Kanowna East Project Acquired in Strategic Tenement Swap

Maritana Minerals (MRT:AU) has announced Kanowna East Project Acquired in Strategic Tenement SwapDownload the PDF here. Keep Reading...

Interactive Chart

Latest Press Releases

Related News