ALBEMARLE DONATES $1 MILLION TO CLEVELAND COMMUNITY COLLEGE TO FURTHER SUPPORT WORKFORCE DEVELOPMENT PROGRAMS

Donation to support training and apprenticeship programs for growing regional industries

Albemarle Corporation (NYSE: ALB), a global leader in providing essential elements for mobility, energy, connectivity and health, announced a $1 million donation to Cleveland Community College (CCC) for the purchase of equipment, supplies and facility improvements to benefit workforce training programs. The Shelby, NC -based college's programs are designed to strengthen the region's pipeline of skilled and diverse workers to support the growth of businesses and projects, such as the redevelopment of the Kings Mountain Mine.

Albemarle Corp. Logo. (PRNewsFoto/Albemarle Corporation)

The equipment and facility improvements are expected to be an integral part of CCC's Heavy Equipment Operator Program and support apprenticeship programs Albemarle is developing for several electrical and process operations roles. In addition, Albemarle employees are expected to benefit from customized training programs for the mine's mineral processing facility. These programs are designed to allow both students and incoming Albemarle employees to learn and train on state-of-the-art equipment and simulators.

"A skilled and capable workforce is one of the most critical ingredients needed as we work to strengthen our U.S. supply chain of lithium," said Ellen Lenny-Pessagno , Global Vice President, External Affairs and Sustainability. "We are fortunate to have Cleveland Community College's experienced faculty and resources right here in the community that can be leveraged to build a pipeline of talent."

"We are grateful to Albemarle for this significant investment," said Dr. Jason Hurst , President of Cleveland Community College . "Not only does it benefit the delivery of workforce training programs, but it also provides Cleveland Community College with the means to develop new and innovative training programs and apprenticeships that support local and regional businesses. Cleveland Community College has high-quality, professional instructors that are eager to deliver training with the proposed new equipment. Albemarle's commitment to this community, and its community college, is unique and much appreciated."

The donation builds upon $5 million of announced funding to CCC as a subrecipient of the U.S. Department of Energy's $150 million grant to the Kings Mountain Mine project. The overall grant is anticipated to support part of the construction cost for the mine's mineral processing facility and CCC's portion of the grant is expected to fund the development of a customized operator training program for the planned facility.

The Kings Mountain site is one of the few known hard-rock lithium deposits in the U.S. Currently, Albemarle is preparing permits for submittal to regulatory agencies and undergoing studies and social impact assessments to determine the feasibility of reopening the mine. Albemarle expects the proposed mine and mineral processing facility to require a workforce of more than 1,000 construction jobs and an additional 300 full-time, skilled roles. The current Kings Mountain site has more than 300 employees.

Since 2016, Albemarle has committed more than $2 million dollars to community initiatives in the region with a focus on health, social services, educational and cultural initiatives intended to strengthen Kings Mountain and surrounding communities.

About Albemarle
Albemarle Corporation (NYSE: ALB) leads the world in transforming essential resources into critical ingredients for mobility, energy, connectivity, and health. We partner to pioneer new ways to move, power, connect and protect with people and planet in mind. A reliable and high-quality global supply of lithium and bromine allows us to deliver advanced solutions for our customers.

Forward-Looking Statements
This press release contains statements concerning our expectations, anticipations and beliefs regarding the future, including, without limitation, information related to the use of and benefits derived from the donation to CCC, the funds from the DOE grant, the planes related to the Kings Mountain mine, and including all information relating to matters that are not historical facts, which constitute "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. These forward-looking statements, which are based on assumptions that we have made as of the date hereof and are subject to known and unknown risks and uncertainties, often contain words such as "anticipate," "believe," "estimate," "expect," "guidance," "intend," "may," "outlook," "should," "would," and "will". Forward-looking statements may include statements regarding Albemarle's and BMW Group's performance under their strategic agreement, future collaboration and development projects by Albemarle and BMW Group regarding lithium battery innovations, and all other information relating to matters that are not historical facts. Factors that could cause Albemarle's actual results to differ materially from the outlook expressed or implied in any forward-looking statement include: changes in economic and business conditions; financial and operating performance of customers; timing and magnitude of customer orders; fluctuations in lithium market prices; production volume shortfalls; increased competition; changes in product demand; availability and cost of raw materials and energy; technological change and development; fluctuations in foreign currencies; changes in laws and government regulation; regulatory actions, proceedings, claims or litigation; cyber-security breaches, terrorist attacks, industrial accidents or natural disasters; political unrest; changes in inflation or interest rates; volatility in the debt and equity markets; acquisition and divestiture transactions; timing and success of projects and collaborations; performance of Albemarle's partners in joint ventures and other projects; changes in credit ratings; and the other factors detailed from time to time in the reports Albemarle files with the SEC, including those described under "Risk Factors" in Albemarle's most recent Annual Report on Form 10-K and any subsequently filed Quarterly Reports on Form 10-Q, which are filed with the SEC and available on the investor section of Albemarle's website (investors.albemarle.com) and on the SEC's website at www.sec.gov . These forward-looking statements speak only as of the date of this press release. Albemarle assumes no obligation to provide any revisions to any forward-looking statements should circumstances change, except as otherwise required by securities and other applicable laws.

Media Contact:
Jennifer Zajac , +1 (980) 308-6259, Jennifer.Zajac@albemarle.com

Investor Relations Contact:
Meredith Bandy , +1 (980) 999-5768, Meredith.Bandy@albemarle.com

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/albemarle-donates-1-million-to-cleveland-community-college-to-further-support-workforce-development-programs-302119194.html

SOURCE Albemarle Corporation

News Provided by PR Newswire via QuoteMedia

ALB
The Conversation (0)
Grid Battery Metals Completes Phase 2 of its 2024 Clayton Valley Project 2024 Exploration Plan

Grid Battery Metals Completes Phase 2 of its 2024 Clayton Valley Project 2024 Exploration Plan

(TheNewswire)

Grid Battery Metals Inc..

Coquitlam, BC TheNewswire - June 20, 2024 - Grid Battery Metals Inc. (the "Company" or "Grid") ( TSXV: CELL, OTCQB: EVKRF FRA: NMK2 ) is pleased to announce the conclusion of a second phase of soil samples and the construction of a geologic model incorporating mapped geology, magnetotelluric (MT) geophysics, and soil geochemistry. Grid's exploration team has determined that a multilayered approach to drill targets would improve the chances of intercepting lithium bearing brines.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Grid Battery Metals Files NI 43-101 Technical Report on its Clayton Valley Lithium Project in Nevada

Grid Battery Metals Files NI 43-101 Technical Report on its Clayton Valley Lithium Project in Nevada

(TheNewswire)

Grid Battery Metals Inc..

Grid Battery Metals Inc. (the "Company" or "Grid Battery")  ( TSXV:CELL ) ( OTC:EVKRF ) ( FRA:NMK2 ) is pleased to announce that the NI 43-101 Technical Report for Grid's Clayton Valley Lithium Project, dated March 4, 2024, prepared by Mr. Steven McMillin P.G. of Rangefront Geological, has been filed on SEDAR+ (www.sedarplus.ca) and can be viewed on the Company's website at Clayton Valley Technical Report

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Grid Battery Metals Team Provides Nevada Exploration Update for 2024

Grid Battery Metals Team Provides Nevada Exploration Update for 2024

(TheNewswire)

Grid Battery Metals Inc..

Coquitlam, BC TheNewswire - February 7, 2024 - Grid Battery Metals Inc. (the "Company" or "Grid Battery") ( TSXV:CELL ) ( OTC:EVKRF ) ( FRA:NMK2 ) announces its plans to explore for the upcoming 2024 mineral exploration season in Nevada.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Grid Battery Metals Exploration Team On Site at the Clayton Valley Nevada Lithium Project

Grid Battery Metals Exploration Team On Site at the Clayton Valley Nevada Lithium Project

(TheNewswire)

Grid Battery Metals Inc..

Coquitlam, BC TheNewswire - February 2, 2024 - Grid Battery Metals Inc. (the "Company" or "Grid Battery") ( TSXV:CELL ) ( OTC:EVKRF ) ( FRA:NMK2 ) announces that its exploration team has just visited the Clayton Valley Lithium Property in Esmeralda County, Nevada. This lithium project is located in Clayton Valley, Nevada adjacent to the village of Silver Peak, Nevada, about 48 km (29 miles) southwest of Tonopah, Nevada, and 273 kilometers (170 miles) southeast of Reno, Nevada.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Kairos Minerals

Strong Lithium And Gold Targets Identified At Croydon Project, WA

Soil sampling outlines several lithium targets, with values up to 177ppm and coincident mapped pegmatites, plus large gold anomalies up to 2.5km-long in the Pilbara

Kairos Minerals Ltd (ASX: KAI)is pleased to advise that it has identified new gold and lithium targets at its 100 per cent-owned Croydon Project in WA’s Pilbara.

Keep reading...Show less
Coniagas Battery Metals

Coniagas Battery Metals Extends Private Placement

Coniagas Battery Metals Inc. (TSXV: COS) announces that it has extended the final closing date of its previously-announced non-brokered private placement to August 30, 2024. As previously announced, the private placement consists of a maximum of 5,000,000 units at a price of $0.12 per unit for maximum gross proceeds of $600,000. Each unit will be comprised of one common share and one-half of a common share purchase warrant. Each full warrant will entitle the holder thereof to purchase one additional common share at a price of $0.15 for five years from the date of issuance.

Coniagas will use the net proceeds from the private placement primarily for exploration on the Graal property as well as for metallurgical test work and working capital.

Keep reading...Show less
White Cliff Minerals

Maiden Fieldwork Discovers Widespread Chalcocite Dominant Vein Systems at Expanded Nunavut Rae Cu-Ag-Au Project

White Cliff Minerals Limited (“WCN” or the “Company”) is pleased to announce that work has commenced at the Rae copper, silver and gold project in Nunavut (“Rae” or the “Project”). Initial visual observations across all sample sites have confirmed numerous vein systems of chalcocite dominant mineralisation across significant strike lengths.

Keep reading...Show less
Astute Metals NL

Red Mountain Lithium Discovery Bolstered with More Outstanding Thick Intersections

Second batch of assays delivers further high-grade intersections

Astute Metals NL (ASX: ASE) (“ASE”, “Astute” or “the Company”) is pleased to advise that assay results from the next four holes, RMRC004-007, of the inaugural Reverse Circulation (RC) drilling campaign at its 100%-owned Red Mountain Lithium Project in Nevada, USA, have returned high-grade mineralisation.

Keep reading...Show less
Avenira Limited

Avenira Limited (ASX: AEV) – Trading Halt

Description

The securities of Avenira Limited (‘AEV’) will be placed in trading halt at the request of AEV, pending it releasing an announcement. Unless ASX decides otherwise, the securities will remain in trading halt until the earlier of the commencement of normal trading on Friday, 26 July 2024 or when the announcement is released to the market.

Keep reading...Show less
European Lithium (ASX:EUR)

Critical Metals Corp Completes Stage 1 Investment for Tanbreez Acquisition

European Lithium Limited (ASX: EUR, FRA:PF8, OTC: EULIF) (European Lithium or the Company) is pleased to announce that Critical Metals Corp. (Nasdaq: CRML) (Critical Metals Corp), a mining development company focused on critical metals and minerals, and producing strategic products essential to electrification and next generation technologies for Europe and its western world partners, today announced that it has completed the stage 1 investment as part of its recently announced plans to acquire a 92.5% controlling interest in the Tanbreez Greenland Rare Earth Mine (the Tanbreez Project) from Rimbal Pty Ltd., a company controlled by geologist Gregory Barnes (Rimbal) (refer ASX announcement 11 June 2024 and 19 June 2024). Following the issue of 8,398,656 CRML shares to Rimbal as the stage 1 consideration, Critical Metals Corp now holds a 42.00% equity interest in the Tanbreez Project. European Lithium will retain its 7.5% ownership in the Tanbreez Project.

Keep reading...Show less
  Metals Australia Ltd

Exploration Program Underway at Corvette River Lithium, Gold, Copper & Silver Project in Quebec

- A phased program of extensive field mapping, excavator trenching, and channel sampling testing high-grade gold and lithium targets across22km of strike within the prolific Lac Guyer Greenstone Belt

Metals Australia Ltd (ASX: MLS) has commenced phase one of its fully permitted1 Corvette River exploration program. The program includes detailed field mapping, extensive excavator trenching and channel sampling to firm up drilling targets for the anticipated drilling phase of the program.

Keep reading...Show less

Latest Press Releases

Related News

×