Venus Metals

Quarterly and Cashflow Report For Period Ending 31 December 2022

Venus Metals Corporation Limited (“Venus” or the “Company”) activities conducted during the quarter ending 31 December 2022 include and highlight the following:


Youanmi Gold Mine (OYG JV 30% Venus; 70% RXL):

  • 23,000m multi-rig resource definition and exploration drill campaign has commenced at the Youanmi Gold Project.
  • Resource definition drilling is focused on the conversion of resources from inferred to indicated classification to upgrade the Youanmi Gold Project Resource. Exploration drilling will test the exciting, near-mine Midway discovery, as well as testing underexplored regional targets to delineate additional ounces which can be incorporated into the Youanmi Gold Project (refer RXL ASX release 16 January 2023).

Marvel Loch East Rare Earth Project (100% Venus):

  • Significant rare earth elements (REEs) enrichment confirmed in monzogranite bedrock with recent results in rock chips up to 4,365 ppm TREO. A grab sample of drill spoil from historical drill hole 02BOVR002 in E15/1796 has TREO of >3,000 ppm in clay.
  • Petrographic studies of monzogranite bedrock identify weathering and release of REEs from primary REE host (allanite) in surface samples, which is favourable for the formation of REE-enriched clays.
  • Detailed aeromagnetic and radiometric survey in progress to delineate prospective magnetic highs within the ~25 km-long magnetic trend for further testing and drill target prioritisation. Diagnostic metallurgical tests (pH 4) in progress at ANSTO and ALS on 10 clay samples from historical drill spoil samples (refer ASX release 16 January 2023).

Mangaroon North Rare Earth Project (100% Venus):

  • High-priority REE target area confirmed in E08/3229.
  • REE anomalies associated with ironstone identified in areas of cover @ 1,848 ppm TREO with 355 ppm Nd2O3 ∼1 km west of the Edmund Fault.
  • Collected 299 soil and 84 rock chip samples and re-analysed 66 previous soil samples for a full REE suite. Results up to 2,136 ppm TREO* and 232 ppm Nd2O3, and 1,848 ppm TREO with 355 ppm Nd2O3 in the most recent sampling suggest the presence of REE-enriched ironstones along a ∼7 km long northwest trend.
  • Soil samples in Pooranoo Metamorphics contain up to 1,420 ppm TREO (refer ASX release 23 January 2023).

Youanmi Lithium Project (100% Venus):

  • A geochemical sampling program completed on E 57/983 as part of a regional reconnaissance geochemical program. Up to 2.11% Li2O in rock chip samples from sub-cropping pegmatite near historical beryl occurrence (refer ASX release 24 January 2023).

Click here for the full ASX Release

This article includes content from Venus Metals, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

VMC:AU
The Conversation (0)
Venus Metals Corporation

Venus Metals Corporation

Highly prospective critical minerals assets in Western Australia

Highly prospective critical minerals assets in Western Australia Keep Reading...
Rio Tinto website.

Rio Tinto Opens Two Argentine Lithium Projects Worth US$1.4 Billion

Rio Tinto (ASX:RIO,NYSE:RIO,LSE:RIO) opened two lithium operations in Argentina's Catamarca province on Thursday (October 29), which is touted to add 25,000 metric tons of annual lithium carbonate equivalent (LCE) capacity once fully ramped up.To date, Rio Tinto has invested roughly US$1.4... Keep Reading...
Silver batteries surround a rising green graph on a lithium-themed backdrop with the text: Lithium, Li.

Benchmark: New Lithium Mine Needed Every Two Months to Meet 2050 Demand

The lithium industry will need to bring the equivalent of a new mine into production roughly every two months for the next 24 years to keep up with demand, according to new data from Benchmark Mineral Intelligence.Benchmark forecasts global lithium demand will reach about 7 million metric tons... Keep Reading...
Blue battery with Australian flag design on a wooden surface.

5 Best-performing ASX Lithium Stocks in 2026

After a sharp rally in the first half of the year, lithium prices retreated during the third quarter, surrendering a significant portion of the gains generated in May when carbonate values reached a multi-year high. Data from Benchmark Mineral Intelligence shows FOB Australia spodumene... Keep Reading...
Glowing battery symbol with lightning bolt on purple circuit board.

Lithium Market Trends: Q3 2026 Review and Forecast

Lithium prices lost ground in Q3, giving back much of the momentum built during a sharp first-half rally.The decline came despite demand indicators that market watchers continue to describe as strong, with electric vehicles (EVs) and grid-scale energy storage both pulling on supply. Price action... Keep Reading...
An electric vehicle beside a charging station.

EU Hybrid EV Cap Sinks Chinese Lithium to 10 Month Low

The EU announced it will cap imports of Chinese hybrid electric vehicles at 350,000 units annually starting this December, sending Chinese lithium futures plunging to a 10 month low.European Trade Commissioner Maros Sefcovic brokered the quota system during recent negotiations held in Beijing.... Keep Reading...
A locked gate.

Sigma Lithium Temporarily Halts Operations in Brazil

Sigma Lithium (TSXV:SGML,NASDAQ:SGML) announced a temporary suspension of all mining and industrial production at its operations in Brazil, citing an "atypical 15-day delay" by the Federal Court of Appeals in reviewing the company’s emergency legal defense against an environmental injunction.The... Keep Reading...

Interactive Chart

Latest Press Releases

Related News