Ur-Energy Releases 2024 Q2 Results

Ur-Energy Inc. (NYSE American:URG)(TSX:URE) (the "Company" or "Ur-Energy") has filed the Company's Form 10-Q for the quarter ended June 30, 2024, with the U.S. Securities and Exchange Commission at www.sec.govedgar.shtml and with Canadian securities authorities at www.sedarplus.ca

Ur-Energy CEO, John Cash said: "The nuclear power industry continued to receive great news throughout the second quarter as the Russian Uranium Ban was unanimously approved by Congress and signed into law, U.S. nuclear utilities looked to restart shuttered plants and extend the life of current reactors, and new reactors were being built around the world. At Ur-Energy, we continued to ramp up production at our Lost Creek Mine and made good progress installing monitor wells and basic infrastructure at our Shirley Basin Project. When the Shirley Basin Project is brought online, expected in late 2025, our annual licensed and constructed mine production capacity will grow from 1.2M pounds to 2.2M pounds U3O8.

"We continue to consider ways to expand our domestic production to respond to growing demand from utilities and active efforts by the Department of Energy to acquire both High Assay Low Enriched Uranium ("HALEU") and Low Enriched Uranium ("LEU") with a preference for domestic feed stock. We believe we are uniquely positioned in the U.S. through our strong cash position and our growing skilled work force to fill our current contract book and capitalize on future opportunities to expand production capacity."

Lost Creek Operations

Lost Creek production is advancing with three header houses having come online in 2024 H1. Header House (HH) 2-9 came online mid-July and HH 2-10 is scheduled to come online mid-August.

During Q2 we captured approximately 70,679 pounds, dried and packaged 64,170 pounds and shipped 70,390 pounds U3O8. These figures represent an increase in each of these production numbers as compared to 2024 Q1.

At quarter end, our in-process inventory was approximately 86,204 pounds, our drummed inventory at Lost Creek was 21,570 pounds, and our finished inventory at the conversion facility was 74,625 pounds U3O8 . We shipped 35,199 pounds U3O8 to the conversion facility on July 25, 2024.

Sales and Sales Agreements

We sold 75,000 pounds U3O8 in Q2 at an average price of $61.65 per pound for proceeds of $4.6 million. In addition to the 75,000 pounds sold in Q2, we have received binding notices from our customers for the delivery of 495,000 pounds in the second half of this year for total sales of 570,000 pounds U3O8 in 2024. Including the revenue received during the quarter, we expect to realize revenues of $33.1 million from our 2024 U3O8 sales.

Subsequent to quarter-end we provided notice to one of our purchasers of a delivery of 100,000 pounds U3O8 which was transferred and sold on August 8, 2024.

Financial Results

As of June 30, 2024, we had cash resources of $61.3 million, which was an increase of $1.6 million from the $59.7 million balance on December 31, 2023. During the six months ended June 30, 2024, we spent $25.6 million on operating activities, used $1.9 million for investing activities, and generated $31.4 million from financing activities.

U3O8Sales, Cost of Sales, and Gross Profit1

The following table provides information on our U3O8 sales, cost of sales, and gross profit.



Unit



2023 Q3



2023 Q4



2024 Q1



2024 Q2



2024 YTD




















U3O8 Pounds Sold



















Produced


lb



90,000



90,000



-



75,000




75,000


Purchased


lb



-



-



-



-






lb



90,000



90,000



-



75,000




75,000




















U3O8 Sales



















Produced


$000



5,440



5,441



-



4,624




4,624


Purchased


$000



-



-



-



-




-



$000



5,440



5,441



-



4,624




4,624





















U3O8 Price per Pounds Sold




















Produced


$/lb



60.44



60.46



-



61.65




61.65


Purchased


$/lb



-



-



-



-




-



$/lb



60.44



60.46



-



61.65




61.65





















U3O8 Cost of Sales




















Ad valorem and severance taxes


$000



53



53



-



42




42


Cash costs


$000



1,674



1,674



-



2,336




2,336


Non-cash costs


$000



796



797



-



749




749


Produced


$000



2,523



2,524



-



3,127




3,127


Purchased


$000



-



-



-









$000



2,523



2,524



-



3,127




3,127





















U3O8 Cost per Pound Sold




















Ad valorem and severance taxes


$/lb



0.59



0.59



-



0.56




0.56


Cash costs


$/lb



18.60



18.60



-



31.15




31.15


Non-cash costs


$/lb



8.84



8.85



-



9.98




9.98


Produced


$/lb



28.03



28.04



-



41.69




41.69


Purchased


$/lb



-



-



-



-




-



$/lb



28.03



28.04



-



41.69




41.69





















U3O8 Gross Profit




















Produced


$000



2,917



2,917



-



1,497




1,497


Purchased


$000



-



-



-









$000



2,917



2,917



-



1,497




1,497





















U3O8 Gross Profit per Pound Sold




















Produced


$/lb



32.41



32.42



-



19.96




19.96


Purchased


$/lb



-



-



-



-




-



$/lb



32.41



32.42



-



19.96




19.96





















U3O8 Gross Profit Margin




















Produced


%



53.6


%


53.6

%


0.0

%


32.4

%



32.4

%

Purchased


%



0.0

%


0.0

%


0.0

%


0.0

%



0.0

%


%



53.6


%


53.6


%


0.0


%


32.4

%



32.4

%

1 The U3O8 and cost per pound measures included in the above table do not have a standardized meaning within US GAAP or a defined basis of calculation. These measures are used by management to assess business performance and determine production and pricing strategies. They may also be used by certain investors to evaluate performance.

We sold 75,000 pounds of U3O8 in the six months ended June 30, 2024 at an average price per pound sold of $61.65.

In 2023 Q3 and 2023 Q4, we delivered a total of 180,000 produced pounds of U3O8 into term contracts at an average price per pound sold of $60.45.

Our sales in 2024 are projected at 570,000 pounds of U3O8 at an average price per pound sold of $58.15 and we expect to realize revenues of $33.1 million. The deliveries are under contracts negotiated in 2022, when the long-term price was between $43 and $52 per pound.

U3O8Production and Ending Inventory

The following table provides information on our production and ending inventory of U3O8 pounds.



Unit



2023 Q3



2023 Q4



2024 Q1



2024 Q2



2024 YTD





















U3O8Production






































Pounds captured


lb



30,491



68,448



38,221



70,679




108,900


Pounds drummed


lb



15,759



6,519



39,229



64,170




103,399


Pounds shipped


lb



-



-



35,445



70,390




105,835





















U3O8Ending Inventory






































Pounds



















In-process inventory


lb



20,396



82,033



80,465



86,204





Plant inventory


lb



15,759



22,278



26,062



21,570





Conversion inventory - produced


lb



133,790



43,790



79,235



74,625







lb



169,945



148,101



185,762



182,399
























Value



















In-process inventory


$000



-



-



-



447





Plant inventory


$000



949



1,343



1,593



1,072





Conversion inventory - produced


$000



3,752



1,228



3,105



3,555







$000



4,701



2,571



4,698



5,074

























Cost per Pound




















In-process inventory


$/lb



-



-



-



5.19





Plant inventory


$/lb



60.22



60.28



61.12



49.70





Conversion inventory - produced


$/lb



28.04



28.04



39.19



47.64

























Produced conversion inventory detail




















Ad valorem and severance tax


$/lb



0.59



0.59



0.53



0.67





Cash cost


$/lb



18.60



18.60



28.47



36.77





Non-cash cost


$/lb



8.84



8.85



10.19



10.20







$/lb



28.03



28.04



39.19



47.64





Equity Financing

On July 29, 2024, we closed an underwritten public offering of 57,150,000 common shares at a price of $1.05 per common share. The gross proceeds to the Company from the offering were approximately $60.0 million, before deducting the underwriting discounts and commissions and other offering expenses payable by the Company.

The Company also granted the underwriters a 30-day option to purchase up to 8,572,500 additional common shares on the same terms. On July 30, 2024, the underwriters exercised in full their option to purchase the option shares. The exercise closed on July 31, 2024. The gross proceeds to the Company from the exercise of the underwriters' option were approximately $9.0 million, before deducting underwriting discounts and commissions and other estimated offering expenses payable by the Company. In the aggregate, we issued a total of 65,722,500 common shares. The gross proceeds to Ur-Energy from this offering and the option were approximately $69.0 million.

For the purposes of the TSX approval, Ur-Energy relied on the exemption set forth in Section 602.1 of the TSX Company Manual, which provides that the TSX will not apply its standards to certain transactions involving eligible inter-listed issuers on a recognized exchange, such as NYSE American.

2024 Continuing Guidance

Header House (HH) 2-10 is scheduled to come online mid-August. Our construction crew is now on track to meet its goal of routinely completing a new header house approximately every thirty days. Throughout Q2 we had 12 drill rigs working at Lost Creek; we anticipate additional drill rigs will mobilize to Lost Creek in the next two months. Fabrication of HHs 2-11 through 2-14 is in progress in our Casper construction shop and onsite construction related to these next header houses is well advanced.

Although we continue to experience equipment and operational challenges, we are seeing month-over-month increases in production, drying and packaging. At August 4, 2024, we drummed and packaged an estimated 25,800 pounds U3O8 since quarter end. We continue to see very positive grades and production from the latest header houses brought online.

Notwithstanding the advances we have made, we are guiding to the lower side of our earlier 2024 production guidance of 550,000 and 650,000 pounds U3O8 captured at Lost Creek. We have made four shipments of U3O8 to the converter in 2024 and anticipate routine shipments throughout the remainder of the year.

We have commitments under contracts negotiated in 2022, when the long-term price was between $43 and $52 per pound, for deliveries of 570,000 pounds U3O8 in 2024 and expect to realize revenues of $33.1 million.

Deliveries for 2025 are committed to three of our customers for a base amount of 700,000 pounds U3O8 . We have received notice from one of our purchasers of its election to flex up its 2025 purchases by 10%, such that we now anticipate we may deliver 730,000 pounds U3O8 into our term sales agreements in 2025.

Uranium spot prices remained strong and relatively stable in 2024 Q2, with pricing averaging approximately $88 per pound U3O8 during the quarter. Nuclear utilities and other purchasers are back in the market, which has sustained term pricing, which averaged $78 per pound U3O8 at the end of 2024 Q1 and $80 per pound U3O8 at the end of 2024 Q2.

We continue to receive requests for proposals ("RFPs") from utilities and other global fuel buyers. We have responded to the RFPs with prices commensurate with rising market conditions including increased demand for domestically produced uranium. We completed three additional uranium sales agreements during 2024 H1. Our contract book now stands at a total of approximately 5.7 million pounds U3O8 with deliveries occurring in 2024 through 2030. Sales prices are anticipated to be profitable on an all-in production cost basis and escalate annually from initial pricing, including some market-based pricing features.

With our expanded sales contract book, and encouraging market conditions, we have decided to proceed with the buildout of a satellite facility at our wholly owned, fully permitted and licensed Shirley Basin Project in Carbon County, Wyoming. The buildout will nearly double our annual permitted mine production to 2.2 million pounds U3O8 .

Construction and drilling at the site have proceeded since weather and conditions on the ground permitted in late spring. Installation of the monitor well ring for the first mine unit remains on schedule to be complete this year. Road construction and the refurbishment of existing and installation of new electric infrastructure are all advancing. Major construction activities at Shirley Basin are expected to begin in 2025 and initial production is expected to commence in early 2026.

Following our recent public offering, we had $121.3 in cash resources as of August 6, 2024. With this strong treasury, we are well funded for upcoming construction at Shirley Basin and for strategic opportunities for accretive expansion through organic or inorganic growth.

We are pleased to be one of the few publicly traded companies that is commercially recovering uranium and expanding our production capacity to sell into a strengthening uranium market. As discussed, stronger prices have already enabled us to secure multi-year sales agreements with leading nuclear companies, which in turn allowed us to resume commercial production at Lost Creek and initiate construction and development activities at Shirley Basin.

We will continue to closely monitor the uranium markets, and other developments, which may affect the uranium production industry and provide the opportunity to put in place additional off-take sales contracts.

As always, we will focus on maintaining safe and compliant operations.

About Ur-Energy

Ur-Energy is a uranium mining company operating the Lost Creek in-situ recovery uranium facility in south-central Wyoming. We have produced and packaged approximately 2.7 million pounds U3O8 from Lost Creek since the commencement of operations. Ur-Energy has all major permits and authorizations to begin construction at Shirley Basin, the Company's second in situ recovery uranium facility in Wyoming and is advancing Shirley Basin construction and development following the March 2024 'go" decision for the mine. We await the remaining regulatory authorization for the expansion of Lost Creek. Ur‑Energy is engaged in uranium mining, recovery and processing activities, including the acquisition, exploration, development, and operation of uranium mineral properties in the United States. The primary trading market for Ur‑Energy's common shares is on the NYSE American under the symbol "URG." Ur‑Energy's common shares also trade on the Toronto Stock Exchange under the symbol "URE." Ur-Energy's corporate office is in Littleton, Colorado and its registered office is in Ottawa, Ontario.

FOR FURTHER INFORMATION, PLEASE CONTACT

John W. Cash, Chairman, CEO and President
+1 720-981-4588, ext. 303
John.Cash@Ur-Energy.com

Cautionary Note Regarding Forward-Looking Information

This release may contain "forward-looking statements" within the meaning of applicable securities laws regarding events or conditions that may occur in the future ( e.g., our ability to maintain operations at Lost Creek in a safe and compliant fashion; our ability to continue to increase production levels in a timely and cost-effective way, to meet our production projections and deliver into our contract book; our ability to remain ahead of supply chain challenges in our procurement of equipment and supplies for both Lost Creek and Shirley Basin; our ability to timely deliver into our sales contracts; the ability to advance development and construction priorities at Lost Creek and Shirley Basin; the ability to complete build out of Shirley Basin as currently projected and budgeted; the ability to complete additional favorable uranium sales agreements, including spot sales when warranted; what effects the ban on Russian nuclear fuels will have on the uranium market; and whether we will be able to expand our production portfolio business with organic or inorganic growth) and are based on current expectations that, while considered reasonable by management at this time, inherently involve a number of significant business, economic and competitive risks, uncertainties and contingencies. Generally, forward-looking statements can be identified by the use of forward-looking terminology such as "plans," "expects," "does not expect," "is expected," "is likely," "estimates," "intends," "anticipates," "does not anticipate," or "believes," or variations of the foregoing, or statements that certain actions, events or results "may," "could," "might" or "will be taken," "occur," "be achieved" or "have the potential to." All statements, other than statements of historical fact, are considered to be forward-looking statements. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements express or implied by the forward-looking statements. Factors that could cause actual results to differ materially from any forward-looking statements include, but are not limited to, capital and other costs varying significantly from estimates; failure to establish estimated resources and reserves; the grade and recovery of ore which is mined varying from estimates; production rates, methods and amounts varying from estimates; delays in obtaining or failures to obtain required governmental, environmental or other project approvals; inflation; changes in exchange rates; fluctuations in commodity prices; delays in development and other factors described in the public filings made by the Company at www.sedarplus.ca and www.sec.gov . Readers should not place undue reliance on forward-looking statements. The forward-looking statements contained herein are based on the beliefs, expectations and opinions of management as of the date hereof and Ur-Energy disclaims any intent or obligation to update them or revise them to reflect any change in circumstances or in management's beliefs, expectations or opinions that occur in the future.

SOURCE: Ur-Energy Inc.



View the original press release on accesswire.com

News Provided by ACCESSWIRE via QuoteMedia

URE:CA,URG
The Conversation (0)
  Boss Energy

2024 Infill Drilling on Satellite Uranium Growth Deposits Complete

Resource update underway in preparation for bringing significant satellite deposits into the mine plan

Boss Energy Limited (ASX: BOE; OTCQX: BQSSF) is pleased to announce the conclusion of a successful infill drilling program at the Gould's Dam and Jason's satellite deposits within its Honeymoon Uranium project in South Australia.

Keep reading...Show less

NexGen Achieves Major Permitting Milestone

  • The Canadian Nuclear Safety Commission ("CNSC") has notified NexGen of successful completion of final Federal technical review.
  • This is the key requirement to scheduling a Federal Commission Hearing date and subsequent Federal Project approval decision.
  • The Federal Environmental Assessment ("EA") and License represent the final major approval steps after having received Provincial EA approval in November 2023 .
  • In production, the Rook I Project is poised to make NexGen one of the world's largest and most environmentally conscious mining companies.

NexGen Energy Ltd. ("NexGen" or the "Company") (TSX: NXE) (NYSE: NXE) (ASX: NXG) is excited and proud to announce a major milestone in the Federal EA process for its 100%owned Rook I Project ("the Project"). The CNSC has provided NexGen formal confirmation that the Company has successfully addressed all information requests received as part of the Federal technical review. With completion of the CNSC technical review, the next and final steps in the Federal approval process include scheduling a Commission Hearing Date for the Project, subject to which the CNSC will render an approval decision on the Project.

NexGen Energy Ltd. Logo (CNW Group/NexGen Energy Ltd.)

This historic milestone marks a crucial step forward for the Project that has been undergoing Canada's robust and rigorous regulatory process since 2019. Completion of the Federal EA technical review stage follows the CNSC having deemed NexGen's Federal licence application sufficient in September 2023 , and receipt of Provincial EA approval in November 2023 . This development reinforces Canada's path to re-establish itself as the leader in global uranium supply and partner of choice.

Leigh Curyer, Chief Executive Officer, commented: "This exciting outcome is a testament to the exceptional efforts of our entire NexGen team, the collaborative support of our valued Indigenous Nation partners, and our transparent approach with the CNSC to ensure a robust and thorough review that meets the highest standards of environmental protection for the sustainable development of the Rook I Project. Since inception, our honest and innovative holistic approach to the successful development of this generational project has set new industry standards as to what is possible, whilst positively impacting all our valued stakeholders.

Together with the Clearwater River Dene Nation, Métis Nation – Saskatchewan Northern Region 2 and Métis Nation – Saskatchewan , Buffalo River Dene Nation, and Birch Narrows Dene Nation, we are construction ready to deliver transformative and unprecedented social, economic and environmental benefits to local communities, the Province of Saskatchewan, Canada , and the world.

We're not just developing a mine - we're building strong communities while shaping a sustainable and secure global energy future. With over $800 million in cash and liquid assets, we are ready pending a positive Commission decision with all activities required to immediately commence major site works in place."

NexGen is poised to propel Canada back to the forefront of global clean energy fuel production. The Rook I Project embodies NexGen's commitment to elite environmental performance, unprecedented community inclusion, and responsible alignment with global net-zero goals.

About NexGen

NexGen Energy is a Canadian company focused on delivering clean energy fuel for the future. The Company's flagship Rook I Project is being optimally developed into the largest, low-cost producing uranium mine globally, incorporating the most elite standards in environmental and social governance. The Rook I Project is supported by a NI 43-101 compliant Feasibility Study which outlines the elite environmental performance and industry leading economics. NexGen is led by a team of experienced uranium and mining industry professionals with expertise across the entire mining life cycle, including exploration, financing, project engineering and construction, operations, and closure. NexGen is leveraging its proven experience to deliver a Project that leads the entire mining industry socially, technically, and environmentally. The Project and prospective portfolio in northern Saskatchewan will provide generational long-term economic, environmental, and social benefits for Saskatchewan, Canada , and the world.

NexGen is listed on the Toronto Stock Exchange and the New York Stock Exchange under the ticker symbol "NXE," and on the Australian Securities Exchange under the ticker symbol "NXG," providing access to global investors to participate in NexGen's mission of solving three major global challenges in decarbonization, energy security, and access to power. The Company is headquartered in Vancouver, British Columbia , with its primary operations office in Saskatoon , Saskatchewan.

Cautionary Note to U.S. Investors

This news release includes Mineral Reserves and Mineral Resources classification terms that comply with reporting standards in Canada and the Mineral Reserves and the Mineral Resources estimates are made in accordance with NI 43-101. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. These standards differ from the requirements of the Securities and Exchange Commission ("SEC") set by the SEC's rules that are applicable to domestic United States reporting companies. Consequently, Mineral Reserves and Mineral Resources information included in this news release is not comparable to similar information that would generally be disclosed by domestic U.S. reporting companies subject to the reporting and disclosure requirements of the SEC Accordingly, information concerning mineral deposits set forth herein may not be comparable with information made public by companies that report in accordance with U.S. standards.

Forward-Looking Information

The information contained herein contains "forward-looking statements" within the meaning of applicable United States securities laws and regulations and "forward-looking information" within the meaning of applicable Canadian securities legislation. "Forward-looking information" includes, but is not limited to, statements with respect to estimates for CapEx, OpEx and a payback period of 12 months, the appointment of a lead lender group, the availability of financing for the Project, the advancement of detailed engineering and contract negotiations, bolstering the globe's uranium supply chains to meet the rising demand for nuclear energy, the timing and cost of reclamation, including as part of the UGTMF and after-tax free cash flow remaining materially consistent with the FS, Free Cash Flow, Payback Period and IRR relative to various uranium prices, the delivery of clean energy fuel for the future, the development of the largest low cost producing uranium mine globally and incorporating elite standards in environmental and social governance, delivering a project that leads the entire mining industry socially, technically and environmentally, providing generational long-term economic, environmental and social benefits for Saskatchewan, Canada and the world, planned exploration and development activities and budgets, the interpretation of drill results and other geological information, mineral reserve and resource estimates (to the extent they involve estimates of the mineralization that will be encountered if a project is developed), requirements for additional capital, capital costs, operating costs, cash flow estimates, production estimates, the future price of uranium and similar statements relating to the economics of a project, including the Rook I Project. Generally, forward-looking information and statements can be identified by the use of forward-looking terminology such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connotation thereof.

Forward-looking information and statements are based on NexGen's current expectations, beliefs, assumptions, estimates and forecasts about its business and the industry and markets in which it operates. Forward-looking information and statements are made based upon numerous assumptions, including, among others, that financing for the Project will be available in a timely manner and on terms acceptable to the Company, the results of planned exploration and development activities will be as anticipated and on time; the price of uranium; the cost of planned exploration and development activities; that, as plans continue to be refined for the development of the Rook I Project, there will be no changes in costs, engineering details or specifications that would materially adversely affect its viability; that financing will be available if and when needed and on reasonable terms; that third-party contractors, equipment, supplies and governmental and other approvals required to conduct NexGen's planned exploration and development activities will be available on reasonable terms and in a timely manner; that there will be no revocation of government approvals; that general business, economic, competitive, social and political conditions will not change in a material adverse manner; the assumptions underlying the Company's mineral reserve and resource estimates and updated/revised CapEx, OpEx, SusEx, and pay back period; assumptions made in the interpretation of drill results and other geological information; the ability to achieve production on the Rook I Project; and other estimates, assumptions and forecasts disclosed in the Feasibility Study for the Rook I Project. Although the assumptions made by the Company in providing forward-looking information or making forward-looking statements were considered reasonable by management at the time they were made, there can be no assurance that such assumptions will prove to be accurate.

Forward-looking information and statements also involve known and unknown risks and uncertainties and other factors, which may cause actual results, performances and achievements of NexGen to differ materially from any projections of results, performances and achievements of NexGen expressed or implied by such forward-looking information or statements, including, among others, negative operating cash flow and dependence on third-party financing, uncertainty of additional financing, the risk that pending assay results will not confirm previously announced preliminary results, the imprecision of mineral reserve and resource estimates, the price and appeal of alternate sources of energy, sustained low uranium prices, aboriginal title and consultation issues, development risks, climate change, uninsurable risks, reliance upon key management and other personnel, risks related to title to its properties, information security and cyber threats, failure to manage conflicts of interest, failure to obtain or maintain required permits and licences, changes in laws, regulations and policy, competition for resources, political and regulatory risks, general inflationary pressures, industry and economic factors that may affect the business, and other factors discussed or referred to in the Company's most recent Annual Information Form under "Risk Factors" and management's discussion and analysis under "Other Risks Factors" filed on SEDAR+ at www.sedarplus.ca and 40-F filed on Edgar at www.sec.gov   .

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or statements or implied by forward-looking information or statements, there may be other factors that cause results not to be as anticipated, estimated or intended.

There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers are cautioned not to place undue reliance on forward-looking information or statements due to the inherent uncertainty thereof. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/nexgen-achieves-major-permitting-milestone-302309673.html

SOURCE NexGen Energy Ltd.

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/November2024/19/c8458.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
The word "uranium" beside green up arrow.

Russia Restricts US Uranium Exports, Retaliating to American Ban

The Russian government has imposed temporary restrictions on enriched uranium exports to the US.

Announced on November 15, the move follows the US' decision toban imports of Russian uranium.

While the US legislation went into effect in August, it allows for waivers to address potential supply disruptions through 2027. The new Russian policy introduces uncertainty during this time period.

Keep reading...Show less

Foremost Clean Energy Announces Strategic Engagement with Red Cloud Financial Services

Foremost Clean Energy Ltd. ( NASDAQ: FMST ) ( CSE: FAT ) (" Foremost " or the " Company "), an emerging North American uranium and lithium exploration company, is pleased to announce today that it has entered into a strategic agreement (the " Agreement ") with Red Cloud Financial Services Inc. (" RCFS" or " Red Cloud "), an arms-length independent contractor, to provide promotional services, including advice on marketing, communications and social media activities. Under the engagement, Red Cloud will be paid a fee of $10,000 per month effective October 14, 2024, for a twelve-month term which automatically renews month-to-month thereafter unless either party provides written notice of termination to the other party thirty (30) days prior to the date of termination.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Nuclear reactors and a stock chart.

US Plans to Triple Nuclear Power Capacity by 2050

The Biden administration has announced a strategic roadmap to significantly expand the United States' nuclear energy capacity, setting a target to triple capacity by 2050.

In a new nine pillar framework, the Biden-Harris administration has laid out its plans to add 200 gigawatts (GW) of new nuclear energy through new reactor builds, reactivations and upgrades to existing facilities.

The initiative seeks to meet a growing demand for reliable, carbon-free power as the nation transitions away from fossil fuels and toward cleaner energy sources.

Keep reading...Show less
Red graph and arrow pointing down.

Paladin Cuts Uranium Production Forecast, Share Price Declines

Shares of Paladin Energy (ASX:PDN,OTCQX:PALAF) declined this week after the company shared an update on its Langer Heinrich mine and revised its 2025 fiscal year production guidance.

The company now expects the mine to produce 3 million to 3.6 million pounds of U3O8, lower than its earlier prediction of 4 million to 4.5 million pounds. According to Paladin, the drop is the result of lower-than-expected output in October, which was caused by water supply disruptions, as well as continued variability in stockpiled ore.

Production from Langer Heinrich amounted to 186,667 pounds during the month.