GTI Energy

Strong Drilling Results At Thor With New Roll Front Trend Discovered – Drilling Now Started At Odin Prospect

GTI Energy Ltd (GTI or Company) is pleased to advise that two mud rotary drill rigs have now completed 70 holes, for 34,010-feet (10,366 metres), of its planned ~100,000-foot drill program in Wyoming’s Great Divide Basin. Drilling is completed at the Thor prospect where a total of 34,010 feet (10,366 metres) was drilled for 70 completed holes (Figure 2).


Highlights

  • 70-hole drill program at Thor completed, 34,010 feet drilled.
  • Discovered new projected roll front trend of 1.39 miles for increased total of 4.85 miles.
  • 50% (35) of the holes met grade and GT1 cutoff, with an average GT of 0.65
  • New mineralised trend found within lease Section 29 with best hole a strong GT of 2.552
  • Mineralisation conducive to ISR recovery with water table 100-200 ft above host sands.
  • Two drill rigs have now commenced operations at the Odin claims as part of the ~65-hole program to target redox trends at the Odin, Loki, Teebo, and Wicket East claim groups.
THOR DRILLING BACKGROUND & RESULTS TO DATE

Drilling has been completed at the Thor prospect (Thor), located adjacent to Ur-Energy Inc’s (URE) 18Mlb Lost Creek deposit and operating ISR uranium processing plant2. Exploration at Thor previously identified mineralisation with economic potential based on widths, grades and depth of mineralisation (ASX release 29 March 2022)3. An initial 100-hole (~50,000 ft) drilling campaign was completed at Thor between November 2021 and March 2022. As part of GTI’s 2022 100,000- foot drill program, a 70-hole follow-up campaign was planned to target extents of approximately 2 miles of mineralised uranium roll fronts at the Thor Project.

Seventy holes have been completed at Thor, marking the end of the follow-up drilling program. Drilling was focused in the north-east of Thor, including fresh ground at State Section 29 & 20 leases (Figures 2 & 4).

70 holes were completed at Thor for a total of 34,010 feet (10,366 metres) of drilling (Figures 2 & 3). Typical economically viable ISR grade and GT cut-offs are: 0.02% (200ppm) U3O8 and 0.2GT i.e., 10 ft (3 m) @ .02% (200ppm) U3O8. Initial results (Tables 1 & 2) are observed as follows:

  • 35 of 70 holes met both grade and GT cutoff with an average of 0.65 GT
  • 23 of the remaining holes met grade cutoff but not GT, 8 had trace mineral & 4 were barren

Executive Director Bruce Lane commented“This round of drilling at Thor has confirmed our belief that the project has significant potential to deliver a viable ISR uranium resource. Results have both met and exceeded our expectation, especially given the new and strongly mineralised trend encountered within our Section 29 state lease. The mineralisation identified shows real potential for ISR development and we are now well positioned to deliver a maiden resource estimate report on the Thor project in Q1 of next year. I look forward to continued exploration success at the Odin, Wicket East, Teebo and Loki prospects over the coming weeks leading up to Christmas.”


Click here for the full ASX Release

This article includes content from GTI Energy, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

GTR:AU
GTI Energy

GTI Energy Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
GTI Energy

GTI Energy


Keep reading...Show less
uranium news

Rigs Secured For Wyoming Uranium Drilling & Utah Fieldwork Completed

GTI Resources Ltd (GTI or Company) is pleased to advise that 2 mud rotary drill rigs have been secured for its planned drilling campaign at the Thor ISR uranium project in Wyoming’s Great Divide basin (Figure 1). As previously advised, GTI is on track to commence drilling during December. This maiden drill program is designed to confirm the grade and tenor of uranium mineralisation that was previously identified by Kerr McGee in the 1970’s & 80’s and to ultimately support definition of an economic uranium resource.

Figure 1. Thor Project Uranium Drilling Location Map, Great Divide Basin, Wyoming USA

Keep reading...Show less

Uranium, Battery, and Precious Metals Virtual Investor Conference: Presentations Now Available for Online Viewing

Virtual Investor Conferences, the leading proprietary investor conference series, today announced the presentations from the Uranium, Battery and Precious Metals Virtual Investor Conference held April 30 th through May 2 nd are now available for online viewing.

REGISTER NOW AT : https://bit.ly/3xUGQVR

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
GTI Energy

Lo Herma Drilling Services Contracted

GTI Energy Ltd (ASX: GTR) (GTI or Company) is pleased to advise that planning for the 2024 field season in Wyoming is progressing well.

Keep reading...Show less
Toro Energy

115% Expansion of Stated Uranium Resource at Dawson Hinkler Uranium Deposit to 20.29Mlbs

Improved uranium prices supports lower cut-off grade which results in expanded stated U3O8 resources at Dawson Hinkler by 115% to 20.29Mlbs U3O8

Toro Energy Limited (ASX: TOE) (‘the Company’ or ‘Toro’) is pleased to announce that the Company has expanded the stated uranium (as U3O8) resources at the Dawson Hinkler Uranium Deposit (Figure 1) by reducing the stated U3O8 resource cut-off grade to 100ppm from 200ppm.

Keep reading...Show less
US Capitol Building beside American flag.

US Senate Gives Green Light to Russian Uranium Import Ban

In a unanimous decision, the US Senate has greenlit legislation to halt imports of Russian uranium, escalating efforts to disrupt Russia's activities amidst its ongoing conflict with Ukraine.

The Prohibiting Russian Uranium Imports Act garnered unanimous consent in the Senate and now awaits President Joe Biden's signature to become law.

The ban, expected to take effect within 90 days of enactment, is also poised to significantly impact the US market, given that the nation relies on imports to fulfill 100 percent of its annual uranium needs.

Keep reading...Show less
Skyharbour Resources (TSXV:SYH)

Skyharbour Resources


Keep reading...Show less

Ur-Energy to Hold 2024 Q1 Earnings Webcast and Teleconference

Ur-Energy Inc. (NYSE American:URG)(TSX:URE) (the "Company" or "Ur-Energy") invites you to attend its 2024 Q1 webcastteleconference on May 8, 2024

Ur-Energy management will provide a review of our 2024 Q1 operations and results. A Q&A session will follow the presentation.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
GTI Energy

GTI Energy Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×